Since January, 2003

Ad by HillAds
 (a random before-and-after moment)
March 18, 2007
September 28, 2014
5th at K, Looking Southeast (see more)

The official announcement will come soon, but Monument Realty has confirmed to me that today they are turning over to WMATA the west entrance of the Navy Yard Metro station --on schedule--so that "fare installation" can begin (i.e., making the entrance useable). Monument says they completed their building structural commitments to WMATA back on Dec. 21. (hat tip to Nats320)
If you look at the Half Street web cam, you can see that the station entrance at lower center does look like it's getting cleaned up somewhat. Monument's initial Half Street project--office, hotel, residential, retail--is not scheduled to be completed until the end of 2009, but the Metro station is expected to be reopened in time for the beginning of baseball. The 55 M Street office building is currently being built on top of the Metro entrance; the southern half of the block, which is currently a big hole but where a hotel and residential units will be offered, should see construction begin soon. Retail will line the ground floor (and some second-floor spaces) all along Half. No tenants have been announced yet for the retail spaces, and, as I mentioned this morning, Monument appears to be looking for a new chain to operate the 200-room hotel.
As for what Half Street will look like during the inaugural season of the ballpark while construction continues, the Office of Planning report on Monument's request for some minor modifications to their Half Street designs has a description: "As part of the original proposal, the applicant showed a covered walkway on the east side of Half Street as a temporary condition during construction. Present plans call for pedestrian traffic to be directed to the other side of Half Street on non-game days, and for the entire street to be opened to pedestrian traffic on game days. Therefore there is no need for a covered walkway. The applicant has committed, however, to maintain a decorative fence at the edge of their construction zone as generally shown in the original plans."
Comments (0)
 
 More About Nationals Park

JDLand.com Home

Comments

Eric Kennedy says: (1/15/08 4:07 PM)
You're doing us all a favor with this website, great job!!!!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Recent Comments:  
202_cyclist on Snapshots/Latest Construction Goings-On: No photos of the neighborhood's dumbest parking lot across the street from Parc ...
202_cyclist on Snapshots/Latest Construction Goings-On: Thanks for the photos. Although it isn't construction-related, we saw the red ...
JD on Snapshots/Latest Construction Goings-On: (though upon reflection I will grant the ding on Unleashed, since there is visib...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
200 B/O M ST SE   THEFT /  10/12/14
200 B/O I ST SE   THEFT /  10/08/14
70 B/O I ST SE   THEFT F/AUTO /  10/08/14
800 B/O L ST SE   BURGLARY /  10/07/14
9TH ST SE AND POTOMAC AVE SE   THEFT F/AUTO /  10/03/14
100 B/O K ST SE   THEFT F/AUTO /  10/03/14
VIRGINIA AVE SE AND 8TH ST SE   THEFT F/AUTO /  09/28/14
6D   THEFT F/AUTO /  09/27/14
1100 B/O NEW JERSEY AVE SE   THEFT /  09/26/14
300 B/O WATER ST SE   THEFT /  09/24/14
50 B/O M ST SE   THEFT /  09/24/14
6D   THEFT F/AUTO /  09/23/14
6D   THEFT F/AUTO /  09/23/14
1100 B/O NEW JERSEY AVE SE   THEFT /  09/23/14
1100 B/O NEW JERSEY AVE SE   THEFT /  09/23/14
700 B/O M ST SE   THEFT /  09/23/14
1200 B/O 12TH ST SE   THEFT F/AUTO /  09/23/14
1300 B/O M ST SE   THEFT /  09/22/14
70 B/O I ST SE   MOTOR VEHICLE THEFT /  09/19/14

Active Public Space Permits Archive  
1331 2ND ST SE    Carlton Ray 
Assigned
paving; streetfixture; excavation  
 02/10/14
to
02/09/15
1331 4TH ST SE    Forest City Forest City 
Issued
excavation; new  
 01/10/14
to
02/10/15
301 TINGEY ST SE    Potbelly Sandwich Works LLC 
Issued
new  
 03/21/12
to
11/27/14

Recent Issued Building Permits Archive  
1212 4TH ST SE   
10/10/14 
FORREST CITY
TL1500006 / CONSTRUCTION
CHANGE OWNER ADDRESS ON EXISTING BUILDING PERMIT TL1400136
   
09/30/14 
FOREST CITY LLC / FRED GRIFFITH; FOREST CITY LLC; JAY LIVESAY
E74701637 / SUPPLEMENTAL
1103 9TH ST SE   
10/10/14 
ICP PARTNERS POTOMAC 810 LLC / HARRY RIDGEWAY
P1500293 / SUPPLEMENTAL
1220 12TH ST SE   
10/10/14 
WASHINGTON GAS LIGHT CO /
P1500284 / SUPPLEMENTAL
80 M ST SE   
10/10/14 
VEIC / GEORGE DELGADO
B1411521 / CONSTRUCTION
INTERIOR ALTERATION TO SUITE 310 AS REQUIRED FOR EXPANSION. WORK TO INCLUDE ELECTRICAL MECHANICAL AND PLUMBING
99 M ST SE   
10/07/14 
BALLPARK SQUARE 701 LLC / STEVEN ADAMCHAK ECS MID-ATLANTIC LLC
SB1400475 / CONSTRUCTION
TWO GEOTECHNICAL BORINGS TO A AN APPROXIMATE DEPTH OF 60 FT BELOW EXISTING SITE GRADES TO BE LOCATED WITHIN PRIVATE PROPERTY. TWO BORINGS WILL BE CONVERTED TO TEMPORARY MONITORING WELLS.
100 M ST SE   
10/01/14 
SQUARE 743 INC / CARLOS E. MONTES
P1500062 / SUPPLEMENTAL
   
10/10/14 
SQUARE 743 INC /
P1500281 / SUPPLEMENTAL
   
09/29/14 
SQUARE 743 INC. 100 M ST SE / PAUL THIEBERGER; SQUARE 743 INC 100 M ST SE; PAUL THIEBERGER
P83348948 / SUPPLEMENTAL
   
10/07/14 
SQUARE 743 INC / ANTHONY G SAMBURG
E1500145 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE   
10/10/14 
DONOHOE DEVELOPMENT COMPANY / HERB LAWHORN
SB1400488 / CONSTRUCTION
A HOLLOW STEM AUGER WILL INSTALL 10 TEMPORARY DEWATERING WELLS BY ADVANCING A 12 INCH OUTER DIAMETER / 8 1 / 4 INCH INNER DIAMETER BORE HOLE TO A DEPTH OF 70 FEET BGS. AT DEPTH A 4 INCH PVC FLUSH JOINT THREADED WELL ASSEMBLY WILL BE SET AND SELECT FILTER PLACED. INTO EACH WELL WILL BE INSTALLED 2 HP TURBINE SUBMERSIBLE PUMPS. EFFLUENT WILL BE DIRECTED THROUGH A COMMON MANIFOLD TO A BAFFLED SETTLIN...
25 POTOMAC AVE SE   
10/02/14 
MRP / ANDREW WILLINGH BOHLER ENGINEERING; DAN DUKE
BCIV1400038 / CONSTRUCTION
SITE GRADING STORM WATER IMPROVEMENTS BIORETENTION AREA INSTALLATION AND SITE UTILITIES
   
10/08/14 
MRP REALTY / JASON BENTLEY
SH1400037 / CONSTRUCTION
SHEETING AND SHORING FOR NEW BUILDING
300 TINGEY ST SE   
10/01/14 
FC BOILERMAKER LLC /
P1500031 / SUPPLEMENTAL
   
10/06/14 
FC BOILERMAKER LLC FC BOILERMAKER LLC / FC BOILERMAKER FC BOILERMAKER LLC
B1500169 / CONSTRUCTION
INSTALLATION OF KITCHEN FIRE SUPPRESSION SYSTEM
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
CUSHING PL   09/11/14
$ 9,000,000
HALF STREET RESIDENTIAL PJV LLC
 
HALF ST   09/11/14
$ 12,500,000
HALF STREET RESIDENTIAL PJV LLC
 
N ST   09/11/14
$ 12,500,000
HALF STREET RESIDENTIAL PJV LLC
 
CUSHING PL   09/11/14
$ 9,000,000
HALF STREET RESIDENTIAL PJV LLC
 
N ST   09/11/14
$ 12,500,000
HALF STREET RESIDENTIAL PJV LLC
 
N ST   09/11/14
$ 12,500,000
HALF STREET RESIDENTIAL PJV LLC
 
HALF ST   09/11/14
$ 12,500,000
MR BP RESIDENTIAL #1A LLC
 
N ST   09/11/14
$ 12,500,000
MR BP RESIDENTIAL #1A LLC
 
0025 POTOMAC AV   08/08/14
$ 78,486,500
RIVERFRONT HOLDINGS I LLC
 


Project Directory




Blog/Home
Project Directory
Photo Archive
Event Photos
 
Nats Park
Food Map
What's New
History

 
Demolished Buildings
Historic Photos
Satellite Images
Timeline
 
About JDLand
Message JD
Advertise
Photo Use
 
     © Copyright 2014 JD.