Since January, 2003
            
 (a random before-and-after moment)
December 6, 2004
August 11, 2016
4th at I, Looking South-Southeast (see more)

As expected, Tommy Wells just introduced to the city council the "Performance Parking Pilot Zone Act of 2008", which would create a three-year pilot project to "better manage curbside parking, especially around the stadium and the impacted area." Wells said the goals of the bill are to protect residential parking in neighborhoods and to support local business, and commented that "it is clear that a couple thousand well-managed curbside spaces are better than two-to-three times as many unmanaged spaces." Council chair Vincent Gray co-introduced the bill, and council members Catania, Brown, Barry, and Bowser signed on as co-sponsors. I should have a link to the text of the bill itself later today, but if you can't wait, read my entry from a few weeks ago describing the plans, since I'm too lazy this morning to re-summarize.
UPDATE: Here is Tommy Wells's press release, which is a handy overview of the new legislation, and the bill itself. Some bullet points:
* The areas to be covered by the pilot include all areas south of the Southeast-Southwest Freeway from 10th Street SE to 12th Street SW and from the freeway north to East Capitol Street between Washington Avenue, SW and 11th Street, SE.
* Fines would start at $50 for parking overtime and would just upward if needed "to dissuade ballpark patrons from parking illegally in neighborhoods";
* Sixty percent of the meter revenues would be used to repay the cost of the new multi-space meters (pictured at left) and related signage, 20 percent would be deposited in the city's Transportation Unified Fund, and the rest would be used for "non-auto transportation improvements" within the zone, such as streetscape upgrades for pedestrians, biking infrastructure improvements, and better bus and rail signage.
* A "pay-by-cell phone" zone could be created to allow for electronic payments for parking. (Cool!)
Specifics still to be spelled out:
* Designations of streets as residential, retail, or ballpark-adjacent, which will govern which type of parking restrictions a street has;
* Rates for the meters;
* Days and hours of meter operations;
* Parking time limits and Residential Permit Parking restriction hours;
* A guest-pass system to allow residents to better handle visitors.
Two community meetings have been scheduled, on Jan. 22 at 401 I Street, SW, and Jan. 23 at 301 North Carolina Ave., SE. Both are from 6:30 to 8 pm. There will also be a hearing at some point by the council's Committee on Public Works and the Environment, chaired by Jim Graham. And it will also no doubt come up for discussion at this Friday's council Committee on Economic Development oversight roundtable on "Parking and Traffic Plan for the Nationals' Stadium" (Jan. 11 at 10 am).
Here's a Tommy quote from the press release: "Some of the best thinking in the country has gone into this proposal. Parking is already at a premium in our neighborhoods, but giving free curbside parking to ballpark visitors isn't managing the problem, it's only inviting more congestion and traffic."
I imagine this is just the beginning of a flood of information on the plan. Stay tuned.
Comments (3)
   
 
 More About Nationals Park
 All posts: parking, Nationals Park

JDLand.com Home

Comments

JimFairfax says: (1/8/08 4:39 PM)
The Tommy Wells parking area north of the SE/SW Freeway is a pretty big area. Any idea why he wants to extend it that far north? - To keep people from parking near Metro stops and taking a short trip to the ballpark?


JD says: (1/8/08 4:42 PM)
This bill actually isn't just for ballpark-related parking issues--it's also trying to address Eastern Market/Barracks Row/Hill-employees-parking-on-residential-streets issues, too.


Dale MacIver says: (1/8/08 6:29 PM)
The bill is all goals, which were in the TOPP months ago. What are the specifics? Is there a draft of regulations? It's a shame that this is as far as we've come with opening day so close.
Dale MacIver

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2016!
 Top News
  

Chaifetz10 on Two-Year Change in: @SWill: Thank you! Doing some digging on Google, it looks like the site was ap...
Ampersand on Two-Year Change in: Just in case other people didn't know yet: 5th St to the underpass is open again...
SWill on Two-Year Change in: @Chaifetz10: I believe that site is owned by Steuart Investments. The warehouse ...

Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/28/16
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/17/16
1000 B/O HALF ST SE   THEFT
Theft First Degree (all Other Larceny)
 08/16/16
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/15/16
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/14/16
16 B/O M ST SE   ROBBERY  08/12/16
1000 B/O 5TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/09/16
1200 B/O 1ST ST SE   THEFT
Theft First Degree (shoplifting)
 08/08/16
50 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 08/02/16
600 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/02/16
700 B/O L ST SE   ROBBERY  08/01/16

Recent Issued Building Permits Archive  
1150 5TH ST SE 20002   
08/11/16 
ALAN J PHELPS / DOUGLAS FOSTER
B1509540 / CONSTRUCTION
1. Renovation of existing first and second floor of the academic wing of the Van Ness building. 2. Square footage is approximately 26,000 SF ,For phase 1 3. Cost of construction is 11.5M 4. Scope of work details a. Convert existing space in to 6 new classroom space. These classrooms will be two PreK -3, two prek-4, and two Kindergarten classes. Also for phase 1,...
1150 5TH ST SE   
08/12/16 
DISTRICT OF COLUMBIA / JOHN HOMICK
E1609156 / SUPPLEMENTAL
   
08/12/16 
DISTRICT OF COLUMBIA / MATT LOSIGNOR
P1608656 / SUPPLEMENTAL
   
08/12/16 
DISTRICT OF COLUMBIA / ORLANDO M CATANA
E1609149 / SUPPLEMENTAL
82 I ST SE   
08/15/16 
GDCV EYE STREET LLC / GDCV EYE STREET LLC; KIM MITCHELL CDKM CONSULTING LLC
B1611941 / CONSTRUCTION
FIRST EXTENSION TO PERMIT B1507990 TO EXPIRE ON 3 / 17 / 17
   
08/15/16 
CSX TRANSPORTATION INC / BEDCO MOBILITY INC.
EN1602806 / SHOP DRAWING
Type of Elevator : One (1) vertical wheel-chair lift / steel / garage level 2 / handicap lift (13th floor)
125 L ST SE   
08/11/16 
CRANE SERVICE CO / CRANE SERVICE CO; CHRISTINE LONG
AH1600945 / CONSTRUCTION
An after hours permit is respectfully requested from 4AM Saturday thru 9PM Sunday
80 M ST SE 1   
08/10/16 
WELLS REIT II 80 M STREET LLC / THOMAS B. STEG
P1608566 / SUPPLEMENTAL
80 M ST SE 2   
08/10/16 
WELLS REIT II 80 M STREET LLC / THOMAS B. STEG
P1608568 / SUPPLEMENTAL
80 M ST SE 3   
08/10/16 
WELLS REIT II 80 M STREET LLC / THOMAS B. STEG
P1608569 / SUPPLEMENTAL
100 M ST SE PT OF 4TH   
08/11/16 
QUARE 743 INC . / QUARE 743 INC .; JOHN GIUSEPPE-RAMCO
B1611810 / CONSTRUCTION
renovation to parts of an existing 4th floor office space, tech marine business as shown on the attached mech., plumb., elect., fire protection, demolition, and arch. dwgs. interior work only. no change in use. no struct. work. 800 sf.
909 NEW JERSEY AVE SE 1311   
08/11/16 
null / NA NA NA
EHOP1690902 / HOME OCCUPATION
861 NEW JERSEY AVE SE   
08/09/16 
NA CSX TRANSPORTATION, INC.
AH1600944 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.
1111 NEW JERSEY AVE SE   
08/11/16 
null / THOMAS P MCGUIRE
E1609117 / SUPPLEMENTAL
385 WATER ST SE   
08/12/16 
FC 385 WATER LLC / STEPHEN J. EXELBERT
P1608654 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2016 JD.