Since January, 2003
            
 (a random before-and-after moment)
August 12, 2006
September 29, 2018
1st at N, Looking North (see more)

As expected, Tommy Wells just introduced to the city council the "Performance Parking Pilot Zone Act of 2008", which would create a three-year pilot project to "better manage curbside parking, especially around the stadium and the impacted area." Wells said the goals of the bill are to protect residential parking in neighborhoods and to support local business, and commented that "it is clear that a couple thousand well-managed curbside spaces are better than two-to-three times as many unmanaged spaces." Council chair Vincent Gray co-introduced the bill, and council members Catania, Brown, Barry, and Bowser signed on as co-sponsors. I should have a link to the text of the bill itself later today, but if you can't wait, read my entry from a few weeks ago describing the plans, since I'm too lazy this morning to re-summarize.
UPDATE: Here is Tommy Wells's press release, which is a handy overview of the new legislation, and the bill itself. Some bullet points:
* The areas to be covered by the pilot include all areas south of the Southeast-Southwest Freeway from 10th Street SE to 12th Street SW and from the freeway north to East Capitol Street between Washington Avenue, SW and 11th Street, SE.
* Fines would start at $50 for parking overtime and would just upward if needed "to dissuade ballpark patrons from parking illegally in neighborhoods";
* Sixty percent of the meter revenues would be used to repay the cost of the new multi-space meters (pictured at left) and related signage, 20 percent would be deposited in the city's Transportation Unified Fund, and the rest would be used for "non-auto transportation improvements" within the zone, such as streetscape upgrades for pedestrians, biking infrastructure improvements, and better bus and rail signage.
* A "pay-by-cell phone" zone could be created to allow for electronic payments for parking. (Cool!)
Specifics still to be spelled out:
* Designations of streets as residential, retail, or ballpark-adjacent, which will govern which type of parking restrictions a street has;
* Rates for the meters;
* Days and hours of meter operations;
* Parking time limits and Residential Permit Parking restriction hours;
* A guest-pass system to allow residents to better handle visitors.
Two community meetings have been scheduled, on Jan. 22 at 401 I Street, SW, and Jan. 23 at 301 North Carolina Ave., SE. Both are from 6:30 to 8 pm. There will also be a hearing at some point by the council's Committee on Public Works and the Environment, chaired by Jim Graham. And it will also no doubt come up for discussion at this Friday's council Committee on Economic Development oversight roundtable on "Parking and Traffic Plan for the Nationals' Stadium" (Jan. 11 at 10 am).
Here's a Tommy quote from the press release: "Some of the best thinking in the country has gone into this proposal. Parking is already at a premium in our neighborhoods, but giving free curbside parking to ballpark visitors isn't managing the problem, it's only inviting more congestion and traffic."
I imagine this is just the beginning of a flood of information on the plan. Stay tuned.
Comments (3)
   
 
 More About Nationals Park
 All posts: parking, Nationals Park

JDLand.com Home

Comments

JimFairfax says: (1/8/08 4:39 PM)
The Tommy Wells parking area north of the SE/SW Freeway is a pretty big area. Any idea why he wants to extend it that far north? - To keep people from parking near Metro stops and taking a short trip to the ballpark?


JD says: (1/8/08 4:42 PM)
This bill actually isn't just for ballpark-related parking issues--it's also trying to address Eastern Market/Barracks Row/Hill-employees-parking-on-residential-streets issues, too.


Dale MacIver says: (1/8/08 6:29 PM)
The bill is all goals, which were in the TOPP months ago. What are the specifics? Is there a draft of regulations? It's a shame that this is as far as we've come with opening day so close.
Dale MacIver

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

jdc on CSX East Three-Building: The continuing increase in vehicular and pedestrian traffic in JD land requires ...
JES on CSX East Three-Building: That 4th & M light needs updating. They either need to make the left turn ar...
202_cyclist on CSX East Three-Building: Happy Park-ing Day! We met a great group of volunteers setting up wildflowers o...
202_cyclist on CSX East Three-Building: Walt— we saw it as the police were towing away the vehicle. We heard from a bys...
walt on CSX East Three-Building: Any info on the car v. pedestrian accident at Harris Teeter yesterday (9/19)? I...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O 1ST ST SE   ROBBERY
Assault W/i To Commit Robbery (simple Assault)
 09/23/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/21/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 09/19/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/16/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 09/15/19
70 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/15/19
1100 B/O NEW JERSEY AVE SE   THEFT
Shoplifting
 09/13/19
300 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/13/19
400 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/11/19
400 B/O M ST SE   THEFT
Shoplifting
 09/10/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/09/19
54 M ST SE   BURGLARY
Burglary Two
 09/07/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 09/05/19
400 B/O M ST SE   THEFT
Shoplifting
 08/30/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 08/28/19
500 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/28/19
800 B/O VIRGINIA AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 08/28/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/28/19
500 B/O L ST SE   ROBBERY  08/26/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/25/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/25/19

Recent Issued Building Permits Archive  
1346 4TH ST SE   
09/11/19 
FC 1346 HOLDCO I LLC / null
E1911472 / SUPPLEMENTAL
900 5TH ST SE   
08/30/19 
CAPPER CARROLLSBURG VENTURES, LLC / DFM DEVELOPMENT SERVICES, LLC
B1906215 / CONSTRUCTION
Reconstruction of 4-story residential building, the Arthur Capper Senior Center, damaged by fire.
200 I ST SE   
09/04/19 
DISTRICT OF COLUMBIA / ROGER L PEACE
BP1904525 / POST CARD
   
09/04/19 
DISTRICT OF COLUMBIA / ROGER L PEACE
BP1904526 / POST CARD
   
09/04/19 
DISTRICT OF COLUMBIA / ROGER L PEACE
BP1904529 / POST CARD
100 M ST SE 9TH FLOOR   
09/05/19 
SQUARE 743 INC / DAVID FLEMING; DAVID FLEMING
P1909280 / SUPPLEMENTAL
100 M ST SE   
09/05/19 
SQUARE 743 INC / FREDERICK S. DONHAM; FREDERICK S. DONHAM
P1909275 / SUPPLEMENTAL
ONE OPEN SITE DRAIN
250 M ST SE   
08/27/19 
SQUARE 769 LLC / STEVEN CHEN
AH1901196 / CONSTRUCTION
After hours permit is respectfully requested from 3am to 7am daily.
   
09/04/19 
SQUARE 769 LLC / JEFFREY D WOLF
AH1901226 / CONSTRUCTION
After hours permit respectfully requested from 3 am to 7 am daily.
410 M ST SE   
09/16/19 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MICHAEL B. BELL; MICHAEL B. BELL
E1911625 / SUPPLEMENTAL
880 NEW JERSEY AVE SE   
09/20/19 
880 NEW JERSEY AVENUE LLC / PATRICIA J STAUB
BP1904750 / POST CARD
1275 NEW JERSEY AVE SE   
09/03/19 
UNITED STATES OF AMERICA / PARKER HARRELL; PARKER HARRELL
SB1900287 / CONSTRUCTION
We propose to furnish and install fifteen (15) gravel packed wells, fourteen (14) around the perimeter, and one (1) at the elevator pit. We will also be installing 3 monitoring wells and potentially 5 contingency wells. We will only pump from up to 15 wells at a time. All wells will be located in a mutually agreed layout. The wells will be installed by advancing up to a 10.25 I.D. hollow stem auge...
125 O ST SE   
09/13/19 
DISTRICT OF COLUMBIA / FRED T FALCONE; JOSEPH SCRIBELLITO
SB1900423 / CONSTRUCTION
Soil borings to collect samples and installed a grouted in place vibrating wire piezometer approximately 30 feet below grade. Two geotechnical soil borings to 75 feet below grade, and 3 soil borings to 20 feet below grade with 5 feet of coring though buried foundations.
301 TINGEY ST SE C-1   
09/03/19 
SEFC 160, LLC / JEFF NOLD
AH1901221 / CONSTRUCTION
Work will occur on 3rd Street SE between Tingey St SE & Water St SE. We will be assessing and providing a CCTV inspection of a sewer line.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.