Because I'm not always so successful in getting people to tell me the current status of various projects, I spend a lot of time pouring through documents hoping to get hints here or there, and within the past few days I've uncovered a few new ones. I sent out some e-mails asking for additional information, but those have gone unanswered (waaaaah!), so I'll just post what I've seen, and wait for the various bureaucratic processes to move along to get more information.
The developers of the planned office building at 1111 New Jersey Avenue are having a Capitol Gateway Overlay Review in front of the Zoning Commission on Jan. 31. This review is now required because Donohoe is buying the land on top of the Navy Yard Metro station east entrance, which means that the project's property now "fronts" M Street and must get a review by the Zoning Commission to make sure it follows the design and usage requirements laid out by the CG Overlay. I haven't seen any new renderings yet to know whether the building has grown from its original 146,000-sq-ft design (note: see UPDATE below). No mentions yet of when construction might start. Presumably this design will be presented to ANC 6D, at perhaps its January meeting.
And, in the Questions and Responses posted along with the Capper PILOT underwriters RFP, there's the following statements:
* 250 M Street, the 200,000-sq-ft office building by William C. Smith, "will commence construction on or about May 2008";
* 600 M Street, the 500,000-sq-ft office building by Forest City on the old Capper Seniors site, "is expected to commence construction in late 2009 or early 2010 -- Stage II PUD process with the District Zoning Commission has already commenced"; and
* 800 New Jersey/120 Canal, the planned 1.1-million-sq-ft mixed use project by William C. Smith on the land north of I between Second and New Jersey (known as Square 737), "will commence Stage II PUD upon transfer of District land in early 2008."
1111 NJ UPDATE: Amazingly, just a few hours later, another document popped up with additional information on 1111 New Jersey: it's for the Dec. 13 WMATA board meeting, a request to execute the sale announced back in June of the 5,612-sq-ft WMATA land at New Jersey and M to "NJA Associates" (aka Donohoe). And it describes the "new" 1111 NJ thusly (emphases mine):
"The Developer proposes to combine the WMATA property with an adjacent 16,406 sf developer-owned site and develop an office building with ground floor retail. Its current proposal to the District of Columbia Zoning Commission is for an approximately 211,000 sf building, a portion of which cantilevers over the WMATA property. At ground level, the proposal includes a wide plaza surrounding the Metro entrance, consistent with the Anacostia Waterfront Initiative Framework Plan. The Developer will make modifications to Metro facilities at its own cost and subject to WMATA approval. At present the modifications are expected to be limited to adjustments to the vent shaft and new paving in the plaza area. The existing entrance canopy will remain. The entrance will be protected during construction. The Developer has stated that it does not currently anticipate any need to close the entrance during construction."
WMATA is selling the land for $2.3 million plus an unnamed additional payment if the approved project is larger 206,000 square feet.
Comments (0)
   
 
 More About New Jersey Ave.

JDLand.com Home

Comments

Sorry, comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2016!
 Top News
  
Get JDLand Updates In Your Inbox!

JD on Project Updates: I guess I missed that he was asking for a place for tickets/contractor posts. ...
202_cyclist on Project Updates: No, not at all. I don't think you want your comment section filled up with Nat...
JD on Project Updates: ... As once again you make a play for my traffic. ;)
202_cyclist on Project Updates: If only there was a neighborhood listserve to post these messages instead....



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/22/16
1100 B/O NEW JERSEY AVE SE   THEFT
Shoplifting
 07/20/16
900 B/O 4TH ST SE   ROBBERY  07/20/16
500 B/O L ST SE   THEFT
Theft First Degree (all Other Larceny)
 07/19/16
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (theft From Building)
 07/19/16
1000 B/O NEW JERSEY AVE SE   BURGLARY
Burglary One
 07/15/16
300 B/O L ST SE   ASSAULT WITH A DANGEROUS WEAPON  07/15/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 07/14/16
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 07/13/16
1000 B/O 8TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny) - Highway/ Road/ Alley/ Street/ Sidewalk
 07/12/16
1000 B/O 3RD ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/10/16
1230 SOUTH CAPITOL ST SE   ASSAULT WITH A DANGEROUS WEAPON
Assault W/i To Kill
 07/09/16
900 B/O 1ST ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 07/06/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 07/06/16
900 B/O 2ND PLACE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 07/06/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree - Felony (theft From Building)
 07/05/16
900 B/O 4TH ST SE   ROBBERY  07/04/16
1000 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/02/16
1100 B/O 3RD ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 07/01/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/29/16
400 B/O I ST SE   ROBBERY  06/28/16
700 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/27/16
400 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/27/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 06/24/16
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 06/23/16
250 B/O L ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/23/16
UNIT B/O L ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/23/16
1200 B/O 1ST ST SE   THEFT
Theft First Degree (theft From Building)
 06/23/16

Recent Issued Building Permits Archive  
1331 2ND ST SE   
07/18/16 
DC WATER
AH1600880 / CONSTRUCTION
After Hours work for structure excavation and support for B1605659 DC Water, Corman Construction 202863-0052
1220 12TH ST SE   
07/22/16 
COPT COPT / COPT COPT; STEPHEN PALMER ELE
SG1600378 / CONSTRUCTION
Install 1 Illuminated wall sign - BAE Systems
909 HALF ST SE   
07/05/16 
23 I LIC C/O RELATED COMPANIES / DENNIS STUBBS
P1607524 / SUPPLEMENTAL
1210 HALF ST SE   
07/08/16 
HINES GLOBAL REIT 55 M STREET LLC / KOSTAS RIKOS
M1602654 / SUPPLEMENTAL
   
07/09/16 
HINES GLOBAL / ALAN CARTER; HINES GLOBAL; ALAN CARTER
E91123768 / SUPPLEMENTAL
80 M ST SE   
07/22/16 
WELLS REIT II 80 M STREET LLC / WELLS REIT II 80 M STREET LLC; JOHN GIUSEPPE-RAMCO
D1600714 / CONSTRUCTION
INTERIOR DEMOLITION TO 1ST, 2ND AND 3RD FLOOR OFFICE SPACE COLUMBIA PROPERTY TRUST AS SHOWN ON THE ELECTRONICALLY SUBMITTED ARCHITECTURAL DEMOLITION PLANS. NO STRUCTURAL WORK INVOLVED. NO CHANGE IN USE. INTERIOR WORK ONLY. 66,684SF
300 M ST SE   
07/06/16 
FDSAFF SFVVSD / GBSDFG DFSB; FDSAFF SFVVSD; ANDREW ARNTSON
P30280792 / SUPPLEMENTAL
   
07/06/16 
FDBGSDFBH FDBSDFBH / DGVSDFG FDBHSDFH; FDBGSDFBH FDBSDFBH; ANDREW ARNTSON
P33816084 / SUPPLEMENTAL
   
07/06/16 
SDFBDFBG DFBSDZB / FDHBSDFH HFDSHDF; SDFBDFBG DFBSDZB; ANDREW ARNTSON
P65774672 / SUPPLEMENTAL
   
07/06/16 
DFBSDF FDBFSDAB / NGFNHDF DNGDN; DFBSDF FDBFSDAB; ANDREW ARNTSON
P74131693 / SUPPLEMENTAL
   
07/06/16 
FDBVSDG DFSG / FBDSBH DFHBSD; FDBVSDG DFSG; ANDREW ARNTSON
P72964153 / SUPPLEMENTAL
   
07/06/16 
BVNXFN NXNXG / GSDFG FGDBHSDF; BVNXFN NXNXG; ANDREW ARNTSON
P77859141 / SUPPLEMENTAL
   
07/06/16 
SDGASEG SDFGSARGH / FDHSDH GHSFDH; SDGASEG SDFGSARGH; ANDREW ARNTSON
P76857584 / SUPPLEMENTAL
   
07/06/16 
GFD GFNH / BFDB DFSB; GFD GFNH; ANDREW ARNTSON
P84902014 / SUPPLEMENTAL
   
07/06/16 
HGDSHDT DFHSH / SDFGHASD DFHSDH; HGDSHDT DFHSH; ANDREW ARNTSON
P90289244 / SUPPLEMENTAL
   
07/06/16 
GCBXDF GFNDM / DFSHDFH DHSDHHG; GCBXDF GFNDM; ANDREW ARNTSON
P90555680 / SUPPLEMENTAL
515 M ST SE   
07/14/16 
FOREST CITY / FOREST CITY; KILLETTE AND ASSOC
B1610381 / CONSTRUCTION
REMOVE 2 NON LOAD BEARING PARTITIONS TO CREATE OPEN SPACE AND REPLACE EXISTING DOORS WITH NEW GLASS DOORS IN KIND.
800 NEW JERSEY AVE SE   
07/06/16 
SQUARE 737 LLC / JOHN H THOMSON
E1606696 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE   
07/19/16 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THOMAS P MCGUIRE
E1608268 / SUPPLEMENTAL
25 POTOMAC AVE SE   
07/08/16 
MRP RESIDENTIAL / JASON OLYMPIA SWIMMING POOL CO., INC.
SP1600008 / CONSTRUCTION
838 s.f. swimming pool inside existing concrete sub-structure of 9 story building. building permit B1408697. This Permit submission for pool construction only. All MEP work for pool equipment, Architectural work, and Structural work of the building slabs to be completed per approved building permit previously mentioned.
1244 SOUTH CAPITOL ST SE   
07/06/16 
1244 SOUTH CAPITOL RESIDENTIAL, L.L.C. / RONALD C. CAYTON
E1607601 / SUPPLEMENTAL
   
07/06/16 
1244 SOUTH CAPITOL RESIDENTIAL, L.L.C. / RONALD C. CAYTON
E1607602 / SUPPLEMENTAL
   
07/14/16 
1244 SOUTH CAPITOL RESIDENTIAL, L.L.C. / GLENNWOOD ROGERS
P1607382 / SUPPLEMENTAL
300 TINGEY ST SE   
07/06/16 
FC BOILERMAKER LLC / GEORGE W. HALL
E1607850 / SUPPLEMENTAL
   
07/06/16 
FC BOILERMAKER LLC / GEORGE W. HALL
E1607851 / SUPPLEMENTAL
355 WATER ST SE   
07/08/16 
JANET WAEMA AMERICAN KIDNEY FUND
TN1600173 / CONSTRUCTION
SPECIAL EVENT KIDNEY ACTION DAY 2 20X40 TENTS 1 14 X 24 STAGE
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2016 JD.