Reader M. gets in the What's the Deal With spirit by asking "WTDW Capitol Quarter?", noting that the first deposits for houses in the development were accepted in October 2006, and that move-ins still have not begun. A few weeks ago I reported that residents-in-waiting were being told that construction on the houses themselves might not start until the second quarter of 2008; while I'm not privvy to what I'm sure is all sorts of behind the scenes stuff about why the project has taken so long to get underway (believe it or not, large commercial companies and city government officials are not all that excited about keeping me in the loop on stuff like that!), there is some news today that indicates that the project is continuing to move forward.
The city council's Committee on Finance and Revenue will be having a mark-up session this afternoon at 3:45 that includes Bill 17-0292, the "Arthur Capper/Carrollsburg Public Improvements Revenue Bonds Approval Amendment Act of 2007", which, in amending the original Capper PILOT bill from 2006, makes some "technical clarifications" and also authorizes a $55 million bond issuance. This bond, now $11 million larger what was originally anticipated because of increased borrowing costs, will provide $36.7 million for public infrastructure improvements like environmental remediation, building of two new streets (Second Place and Third Place), and water and sewer upgrades and replacements. Once this bill is passed by the council, the Housing Authority will be able to move forward with issuing the bonds, probably in Q2 2008; in fact, they have already sent out a Request for Proposals for underwriters for these bonds, which closes on Friday (Dec. 7). This bond will then be repaid by the payments in lieu of property taxes that landowners within the Capper PILOT area will be responsible for. (The draft council bill and the underwriting RFP give much more detail about the PILOT plan, if you're interested.)
The construction that's currently tearing up the streets at Capitol Quarter is a separate first-phase contract, allowing EYA to complete the initial work on public infrastructure that needs to be done before they can start work on the "private" infrastructure (the utilities and other work under the house lots themselves). Once that is done, then "vertical construction" can begin on the houses themselves, which is the work that is now scheduled to begin in the spring.
And, the DC Building Permit feed shows that six-month extensions for Capitol Quarter permits have recently been approved.
So, while none of this answers what was probably the meat of the WTDW question--I know everyone really wants all sorts of skinny on the "whys" of the delays--it does give some semblance of an update on where things are.
Post-Hearing UPDATE: The bill was moved out of mark-up ("reported favorably") with no discussion, and next goes to Committee of the Whole (presumably at next Tuesday's meeting). Note that the online version of the bill is the original draft, and may not reflect the current wording. Jack Evans mentioned at mark-up that there will be an amendment offered at the Committee of the Whole, but didn't elaborate. And here's the draft committee report on the bill, which gives a less technical description of the changes being made to the original 2006 PILOT legislation.
Comments (0)
   
 
 More About Capper
 All posts: Capper, What's the Deal?

JDLand.com Home

Comments

Sorry, comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

keith18 on Wednesday Tidbits: I had a weird experience at Whaley's and never went back. My wife and I ordered ...
202_cyclist on Wednesday Tidbits: Dan— you won the Internet. This is the comment of the year on JD Land!
Dan on Wednesday Tidbits: The Rosé Garden is where one shouts nonsense and confesses to having had too muc...
Edna on Wednesday Tidbits: That would be great if the Ros&eacute garden continues. I always wanted to ...
jsh on Wednesday Tidbits: JDC- Montaditos closed because although their food was better than okay, their ...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O 3RD ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/01/19
1000 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 11/01/19
UNIT B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/01/19
400 B/O M ST SE   THEFT
Shoplifting
 10/30/19
200 B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/28/19
100 B/O H ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/28/19
900 B/O NEW JERSEY AVE SE   ROBBERY  10/28/19
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/27/19
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/24/19
100 B/O H ST SE   ROBBERY  10/23/19

Recent Issued Building Permits Archive  
1331 2ND ST SE   
11/08/19 
DC WATER / CRAIG M COOK
B1907684 / CONSTRUCTION
Flood mitigation, seal openings, install brackets for stop logs, replace elevator shaft with concrete slab.
1300 4TH ST SE   
11/15/19 
ASANA PARTNERS / DEBRA MARSHALL; THE DONOHOE COMPANIES INC
B2001773 / CONSTRUCTION
ADD EXTERIOR DOOR, ADD INTERIOR DOOR , ANY RELAYED,ELECTRICAL,PLUMBING, RELOCATING UNBUILT APPROVED NON LOAD BEARING FIRE RATED PARTITIONS @ FIRST FLOOR APPROVED UNDER PERMIT #B1711970. ATTACHED
300 M ST SE SPACE B   
11/06/19 
FEDERAL CENTER LP / null
M2000403 / SUPPLEMENTAL
300 M ST SE   
11/06/19 
FEDERAL CENTER LP / RUBEN MOVSISYAN; RUBEN MOVSISYAN
E2001472 / SUPPLEMENTAL
   
11/11/19 
FEDERAL CENTER LP / null
P2001215 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
11/05/19 
809-853 NEW JERSEY AVENUE ACQUISITION, LLC / JAVIER A GRACIA; NA NA
SB2000011 / CONSTRUCTION
Drilling and installation of 3 inclinometers which will be extended to a depth of 25 below existing site grade as well as the installation of 4 settlement optical monitoring points which will be extended to depths ranging between 5 feet to 30 feet below existing site grades.
   
11/15/19 
CSX TRANSPORTATION INC / ERICKA CLARK; DGS CONSTRUCTION
TC2000008 / CONSTRUCTION
(2) tower cranes
1100 NEW JERSEY AVE SE 1ST   
11/04/19 
SQUARE 742 LLC / JAMES W. LASHER; JAMES W. LASHER
E2001381 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
11/01/19 
SQUARE 742 LLC / ;
P2000952 / SUPPLEMENTAL
   
11/05/19 
SQUARE 742 LLC / BETSY H MARINO; RICHARD PEPPER; BETSY H MARINO
SG2000062 / CONSTRUCTION
Remove Alion sign and replace with illuminated wall sign reading SERCO
1111 NEW JERSEY AVE SE   
11/15/19 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / TANYA HILL; THYSSENKRUPP
ER2000366 / SHOP DRAWING
REPLACE EXISTING 8MM WORN HOIST CABLES WITH LIKE IN KIND ON ELEVATOR #4. WORK TO ALLOW UNIT TO BE RETURNED TO SERVICE.
1299 NEW JERSEY AVE SE   
11/12/19 
BROOKFIELD DEVELOPMENT / JUSTIN BELLOW
BP2000489 / POST CARD
71 POTOMAC AVE SE   
11/08/19 
RIVERFRONT HOLDINGS II, LLC / JAMES VANEGAS
AH2000075 / CONSTRUCTION
Perform interior and exterior construction activities. New construction 14-story new residential multi-family building.
201 TINGEY ST SE   
11/14/19 
BROOKFIELD PROPERTIES / DFM DEVELOPMENT SERVICES, LLC
AH2000197 / CONSTRUCTION
Afterhours work at Tingey Square Project. The work performed will be forming, prepping and paving at Tingey Square park. Friday and Saturday the 15th & 16th, from 7PM to midnight. If required, Sunday the 17th from 7AM to 3PM. ANC Support provided. Associated Permit Include PA328164-R1 and PA10760162.
520 TINGEY ST SE   
10/30/19 
UNITED STATES OF AMERICA / JOHN WICKLIFFE; TBD
TN2000020 / CONSTRUCTION
Install 100ft x 90ft Tent No Cooking, No Propane, No Stages, No Smoking Installed Feb 9, 2020 - Aug 4, 2020 Events Daily 8:00 am - 10:00 pm
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.