On Tuesday night, ANC 6B gave its support for a planned 12-unit five-story condo project to be built on the
vacant lot at 1006 7th Street (between K and L, across from the
Marine Bachelor Enlisted Quarters). All the units will be two bedroom/two bath, and there will be six parking spaces on the site as well. The ground floor has about 650 sq ft of commercial space, though it's not yet decided whether it will be retail or office space. The architect was kind enough to pass along the very early technical drawings, which
I've now posted. There's still a lot of bureaucracy for this project to wade through, including its Historic Preservation Review Board hearing on Sept. 27, as well as the vaunted DC building permit process. But they hope to break ground quickly after all the ducks have been put in a row.
(You can see the change that has already come to the rowhouses next to the lot if you scroll a bit down my
8th Street page.)