Since January, 2003

Ad by HillAds
 (a random before-and-after moment)
June 27, 2005
October 27, 2013
South Capitol at N, Looking Southeast (see more)

After a week of days that were either overcast and drizzly or ridiculously hot and humid, today's sunny-and-warm profile gave me no choice but to venture out for a reconaissance mission. My report:
The masses of workers and the well-positioned fences make it nearly impossible to take photos of the current state of South Capitol Street, but I have added a decent photo to my Douglass Bridge makeover page showing the new South Capitol and Potomac intersection, which appears very close to being ready for traffic. Streetlights are in place, curbs have been built, paving has begun, and the historic globe streetlamps are installed all along the length of the bridge.
I also snuck a peek into the huge hole where Monument Realty's Half Street project is underway, and from N Street you can see what appears to be vertical construction is already underway at the bottom of the hole. It's along the M Street portion of the site, which will be home to the 55 M Street office building, which itself will contain the expanded entrance to the Navy Yard Metro station. Because that Metro work must be completed by Opening Day 2008, I guess it shouldn't be surprising that they're already pouring concrete and working upward, eight months into construction. The office building itself and the rest of the Half Street Phase I won't be completed until 2009.
And I unexpectedly found Demolished Building entry #138, as the beige garage that has long sat on the northeast side of the Half and I Street intersection bit the dust today, which I'm sure JPI is happy to see, given that 70/100 I Street is growing like a weed right next door.
Speaking of 70/100 I, it got updated photos today, along with Onyx on First and 100 M Street. You can look at those project pages (and their accompanying expanded archives), or you can browse this page showing all photos I've posted from today, which includes a few new shots of Capper Building #2, which I believe is just minutes from opening. And I even finally added a photo of the "Starbucks Coming Soon" sign out in front of the DOT HQ, for the caffeine-deprived.
 
 More About staddis

JDLand.com Home

Comments

Sorry, comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Recent Comments:  
conngs0 on Early Voting Now: I actually think the DC Board of Elections claimed that it wasn't an accident on...
Gamble Rogers on Early Voting Now: Loved the voter guide's upside-down D.C. flag -- did they mean to send a signal ...
conngs0 on Early Voting Now: I voted on Saturday at the King Greenleaf Recreation Center. The low turnout at...
202_cyclist on GSA Proposing to: Admittedly it isn't Capitol Riverfront/Navy Yard but while the federal govt is a...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
200 B/O M ST SE   THEFT /  10/12/14
200 B/O I ST SE   THEFT /  10/08/14
70 B/O I ST SE   THEFT F/AUTO /  10/08/14
800 B/O L ST SE   BURGLARY /  10/07/14
9TH ST SE AND POTOMAC AVE SE   THEFT F/AUTO /  10/03/14
100 B/O K ST SE   THEFT F/AUTO /  10/03/14

Active Public Space Permits Archive  
1331 2ND ST SE    Carlton Ray 
Assigned
paving; streetfixture; excavation  
 02/10/14
to
02/09/15
1331 4TH ST SE    Forest City Forest City 
Issued
excavation; new  
 01/10/14
to
02/10/15
301 TINGEY ST SE    Potbelly Sandwich Works LLC 
Issued
new  
 03/21/12
to
11/27/14

Recent Issued Building Permits Archive  
1212 4TH ST SE   
10/10/14 
FORREST CITY
TL1500006 / CONSTRUCTION
CHANGE OWNER ADDRESS ON EXISTING BUILDING PERMIT TL1400136
1019 4TH ST SE   
10/14/14 
JOHN SHORT
F1500026 / CONSTRUCTION
WE WILL INSTALL AN ORNAMENTAL IRON FENCE IN THE FRONT YARD WITH A GATE. THE FENCE IS 3 FEET HIGH AND THE FENCE WILL BE BLACK IRON. FENCE IS ENTIRELY ON PUBLIC SPACE.
1212 4TH ST SE   
10/16/14 
FC 1212 LLC / PAUL R. JABLONSKI
E1500411 / SUPPLEMENTAL
   
10/16/14 
FC 1212 LLC / ARK SIGN SERVICES INC.; NONE
SG1500034 / CONSTRUCTION
INSTALL ONE WALL MOUNTED ILLUMINATED SIGN.
1103 9TH ST SE   
10/10/14 
ICP PARTNERS POTOMAC 810 LLC / HARRY RIDGEWAY
P1500293 / SUPPLEMENTAL
1220 12TH ST SE   
10/10/14 
WASHINGTON GAS LIGHT CO /
P1500284 / SUPPLEMENTAL
41 L ST SE   
10/24/14 
BILL CUMMINGS POC FOR WMATA MRP REALTY/CAS RIEGLER / EOIN DURCAN POC FOR SCHNABEL ENGINEERING
SB1400457 / CONSTRUCTION
TEMPORARY GEOTECHNICAL SOIL BORINGS NUMBER OF BORINGS: 3 DEPTH OF BORINGS: 60 FT DRILLING METHOD: 3.25 INCH HOLLOW STEM AUGER HOLE DIAMETER: 5 INCHES WELL ABANDONMENT PROCEDURE: TREMIE GROUTING WITH BENTONITE GROUT
80 M ST SE   
10/10/14 
VEIC / GEORGE DELGADO
B1411521 / CONSTRUCTION
INTERIOR ALTERATION TO SUITE 310 AS REQUIRED FOR EXPANSION. WORK TO INCLUDE ELECTRICAL MECHANICAL AND PLUMBING
20 M ST SE   
10/17/14 
SOUTHEAST REALTY LLC / DAMON ELLIS; .
SG1400457 / CONSTRUCTION
INSTALLATION OF NEW NON ELECTRIC SIGN 10FT L 1FT 8IN H 3IN W
100 M ST SE   
10/10/14 
SQUARE 743 INC /
P1500281 / SUPPLEMENTAL
   
10/15/14 
NORTHWOOD INVESTERS LLC / STANLEY HUBBARD; NORTHWOOD INVESTERS LLC; STANLEY HUBBARD
E14516088 / SUPPLEMENTAL
   
10/17/14 
WASHINGTON D.C. / GARY MCVEY; WASHINGTON D.C.; GARY MCVEY
E50257566 / SUPPLEMENTAL
901 M ST SE   
10/16/14 
CARLTON RAY
AH1500035 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
1201 M ST SE   
10/14/14 
COMCAST CABLE / MICHAEL SONESEN
AH1500018 / CONSTRUCTION
PLACING INNERDUCT IN EXISTING VERIZON MANHOLES. OCTOBER 9 2014 ? NOVEMBER 9. 2014. 7PM ? 2AM WEEKNIGHTS ? SATURDAYS
   
10/16/14 
CARLTON RAY
AH1500034 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
1000 NEW JERSEY AVE SE   
10/14/14 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / RICHARD G. FINFROCK
P1500331 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE   
10/10/14 
DONOHOE DEVELOPMENT COMPANY / HERB LAWHORN
SB1400488 / CONSTRUCTION
A HOLLOW STEM AUGER WILL INSTALL 10 TEMPORARY DEWATERING WELLS BY ADVANCING A 12 INCH OUTER DIAMETER / 8 1 / 4 INCH INNER DIAMETER BORE HOLE TO A DEPTH OF 70 FEET BGS. AT DEPTH A 4 INCH PVC FLUSH JOINT THREADED WELL ASSEMBLY WILL BE SET AND SELECT FILTER PLACED. INTO EACH WELL WILL BE INSTALLED 2 HP TURBINE SUBMERSIBLE PUMPS. EFFLUENT WILL BE DIRECTED THROUGH A COMMON MANIFOLD TO A BAFFLED SETTLIN...
   
10/16/14 
GALLERY CAPITOL RIVERFRONT / THOMAS P MCGUIRE
E1500402 / SUPPLEMENTAL
300 TINGEY ST SE   
10/15/14 
FC BOILERMAKER LLC / BIRKHEAD ELECTRIC INC.; ERIN ANCHOR SIGN INC
SG1500023 / CONSTRUCTION
2-COMMERCIAL SIGN INSTALLATION
301 WATER ST SE   
10/23/14 
FOREST CITY
B1408021 / CONSTRUCTION
REVISION TO B1305741 EXTERIOR SEATING LOAD FROM 188 TO 345 EXTERIOR SEATING CONSIDER AS SUMMER GARDEN ON PRIVATE PROPERTY PER GSA / DC GOV EASMENT.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
CUSHING PL   09/11/14
$ 9,000,000
HALF STREET RESIDENTIAL PJV LLC
 
HALF ST   09/11/14
$ 12,500,000
HALF STREET RESIDENTIAL PJV LLC
 
N ST   09/11/14
$ 12,500,000
HALF STREET RESIDENTIAL PJV LLC
 
CUSHING PL   09/11/14
$ 9,000,000
HALF STREET RESIDENTIAL PJV LLC
 
N ST   09/11/14
$ 12,500,000
HALF STREET RESIDENTIAL PJV LLC
 
N ST   09/11/14
$ 12,500,000
HALF STREET RESIDENTIAL PJV LLC
 
HALF ST   09/11/14
$ 12,500,000
MR BP RESIDENTIAL #1A LLC
 
N ST   09/11/14
$ 12,500,000
MR BP RESIDENTIAL #1A LLC
 
0025 POTOMAC AV   08/08/14
$ 78,486,500
RIVERFRONT HOLDINGS I LLC
 


Project Directory




Blog/Home
Project Directory
Photo Archive
Event Photos
 
Nats Park
Food Map
What's New
History

 
Demolished Buildings
Historic Photos
Satellite Images
Timeline
 
About JDLand
Message JD
Advertise
Photo Use
 
     © Copyright 2014 JD.