Since January, 2003

Ad by HillAds
 (a random before-and-after moment)
December 15, 2007
November 11, 2012
2nd (Mid) at Tingey, Looking East-Southeast (see more)

The Zoning Commission shoe-horned in one last public meeting tonight before its August break, and took up a couple of Near Southeast-related items.
After having asked for revisions, clarifications, and refilings on three previous occasions, the commissioners once again had before them a first vote to approve the planned 276-unit residential project by Camden Development at 1325 South Capitol Street, across the street from the Nationals ballpark. The major sticking point in the last two meetings has been the design of the western side of the building, which is technically the "rear" of the building but will be on full display to much of Southwest because only low-rise buildings back up to the project site. Commissioner Turnbull had led the complaints in previous meetings about the need to "step up" the architecture, and while he was not jumping up and down for joy (calling the latest revisions "brutal at times"), he indicated that the plans had indeed made some progress. Commissioners Parsons and Hood agreed, and the commission voted to give first approval to the project three votes to zero, with commissioners Mitten and Jeffries not voting (having not participated in the case). The project now goes to the National Capital Planning Commission for its review, with a final vote by the Zoning Commission in the fall.
The Commission also gave its final approval to Case 07-08, which amends the zoning regulations to allow temporary surface parking lots on various blocks near the stadium. This is the case that stirred an outcry a few weeks ago when it was discovered after the commission's preliminary approval that the language specifying the parcels approved for parking included the three blocks slated for Canal Park. But with a supplemental report from the Office of Planning amending the language, and also with the report from the National Capital Planning Commission indicating its support of the amendment as long as the Canal Park boo-boo was fixed, the zoning commission approved the amended amendment three votes to zero, with commissioners Parsons and Jeffries not voting. And then they amended the original emergency amendment, too, just to make 100% sure that there were no loopholes big enough to build a parking lot on.
 
 More About parking

JDLand.com Home

Comments

Sorry, comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Tell readers about your apartment/house/item
for two weeks for $5.
Someone's looking for
what you're selling!
List it here.
Recent Comments:  
yard resident since 09 on Something Appears to: The yellow tape was for window washers
202_cyclist on Reminder: @JES: And King Ribs could open another location on the grass square. Life woul...
202_cyclist on Reminder: @JES: And King Ribs could open another location on the grass square. Life woul...
JES on Reminder: I peered in there last night, they made it look nice with the wood flooring and ...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
200 B/O VIRGINIA AVE SE   MOTOR VEHICLE THEFT /  07/10/14
900 B/O HALF ST SE   THEFT F/AUTO /  07/10/14
100 B/O M ST SE   THEFT /  07/09/14
4TH ST SE AND L ST SE   ROBBERY /  07/08/14
800 B/O POTOMAC AVE SE   THEFT /  07/07/14
300 B/O K ST SE   THEFT F/AUTO /  07/07/14
1100 B/O NEW JERSEY AVE SE   THEFT /  07/05/14
100 B/O L ST SE   THEFT F/AUTO /  07/04/14
1100 B/O 2ND PLACE SE   THEFT F/AUTO /  07/03/14
2ND PLACE SE AND I ST SE   THEFT F/AUTO /  07/02/14
70 B/O I ST SE   ROBBERY / GUN  07/02/14
200 B/O I ST SE   THEFT F/AUTO /  07/02/14
400 B/O M ST SE   MOTOR VEHICLE THEFT /  06/30/14
UNIT B/O M ST SE   THEFT F/AUTO /  06/30/14
70 B/O I ST SE   THEFT /  06/29/14
1100 B/O 1ST ST SE   THEFT F/AUTO /  06/28/14
900 B/O 4TH ST SE   THEFT /  06/28/14

Active Public Space Permits Archive  
1011 1ST ST SE    Pepco Holdings Inc 
Issued
excavation; new  
 06/26/14
to
08/26/14
1331 2ND ST SE    Carlton Ray 
Assigned
paving; streetfixture; excavation  
 02/10/14
to
02/09/15
804 3RD ST SE    Maximiliano Villagra 
Issued
streetfixture; new  
 08/05/14
to
08/06/14
904 3RD ST SE    Janel Fitzhugh 
Issued
streetfixture; new  
 07/01/14
to
08/14/14
908 3RD ST SE    Rachel Frankel 
Issued
streetfixture; new  
 07/24/14
to
09/21/14
1026 3RD ST SE    Wash Gas & Light Co. 
Issued
excavation; new  
 06/26/14
to
09/04/14
1331 4TH ST SE    Forest City Forest City 
Issued
excavation; new  
 01/10/14
to
02/10/15
913 5TH ST SE    Wash Gas & Light Co. 
Issued
excavation; new  
 06/26/14
to
08/28/14
1100 - 1199 BLOCK 1ST ST SE    tom cash 
Issued
excavation; new  
 06/27/14
to
08/25/14
410 M ST SE    Pepco Holdings Inc 
Issued
excavation; new  
 07/11/14
to
09/08/14
800 NEW JERSEY AVE SE    Pepco Holdings Inc 
Issued
excavation; new  
 06/20/14
to
08/22/14
880 NEW JERSEY AVE SE    WASHINGTON GAS 
Issued
excavation; new  
 06/17/14
to
08/17/14
    WASHINGTON GAS 
Issued
excavation; new  
 07/28/14
to
09/26/14
1105 NEW JERSEY AVE SE    Wash Gas & Light Co. 
Issued
excavation; new  
 06/13/14
to
08/11/14
301 TINGEY ST SE    Potbelly Sandwich Works LLC 
Issued
new  
 03/21/12
to
11/27/14

Recent Issued Building Permits Archive  
1025 1ST ST SE   
07/26/14 
NA NA NA
EHOP1490737 / HOME OCCUPATION
1100 1ST ST SE   
07/15/14 
NA NA NA
EHOP1490710 / HOME OCCUPATION
1212 4TH ST SE   
07/11/14 
FC 1212 LLC /
P1406926 / SUPPLEMENTAL
   
07/14/14 
MIKE LENARD / BHAR; W. SAKIE BHAR
SG1400363 / CONSTRUCTION
INSTALL ONE SET OF BUILDING SIGN ON TO EXISTING BUILDING
1331 4TH ST SE   
07/09/14 
UNITED STATES OF AMERICA / RONALD C. CAYTON
E1406628 / SUPPLEMENTAL
1103 9TH ST SE   
07/25/14 
ICP PARTNERS POTOMAC 810 LLC / TALBERT DOWLING
E1407537 / SUPPLEMENTAL
1220 12TH ST SE   
07/16/14 
FAIRBANKS MORSE ENGINE / EVAN O'BRIEN/ D MCKEEVER SERVICES
B1409041 / CONSTRUCTION
INTERIOR ALTERATION TO EXISTING 2578 SF OFFICE SPACE. AFFECTED AREA LESS THAN 1000 SF TO CREATE DEMISING WALL AND MINOR ALTERATIONS TO PARTITION PLAN IN CONFERENCE AREA. MECHANICAL AND ELECTRICAL WORK INCLUDED.
326 L ST SE   
07/17/14 
NA NA NA
EHOP1490715 / HOME OCCUPATION
55 M ST SE   
07/16/14 
HINES GLOBAL REIT 55 M STREET LLC / TYRAN D. BRANNUM
E1407255 / SUPPLEMENTAL
20 M ST SE   
07/17/14 
SOUTHEAST REALTY LLC / JOHN GIUSEPPE-RAMCO
TL1400132 / CONSTRUCTION
FIRST TIME TENANT BUILDOUT FOR FAST FOOD ESTABLISHMENT - SUBWAY SANDWICH SHOP SEATING 41 AS SHOWN ON THE ATTACHED ARCH. MECH. PLUMB. ELECT AND FIRE PROTECTION DWGS. INTERIOR WORK ONLY.
55 M ST SE   
07/15/14 
HINES
B1409693 / CONSTRUCTION
INSTALL 6 AUTOMATIC DOOR OPERATORS LOCATED AT THE ELEVATOR LOBBIES BETWEEN THE 4TH-7TH FLOORS
901 M ST SE   
07/15/14 
CARLTON RAY
AH1400584 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
1201 M ST SE   
07/15/14 
CARLTON RAY
AH1400585 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
800 NEW JERSEY AVE SE   
07/14/14 
NEW JERSEY AT H LLC / COLIN CLARK
B1409654 / CONSTRUCTION
REVISION TO PERMIT #SH1400039 FOR A OWNERSHIP CHANGE
1000 NEW JERSEY AVE SE   
07/11/14 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / RICHARD G. FINFROCK
P1406902 / SUPPLEMENTAL
   
07/11/14 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / BRANDON K VIERNES
M1402531 / SUPPLEMENTAL
   
07/22/14 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / DONALD R. MCGLYNN
E1407426 / SUPPLEMENTAL
1236 SOUTH CAPITOL ST SE   
07/11/14 
1244 SOUTH CAPITOL RESIDENTIAL LLC / GEOCAPITOL ENGINEERING LLC
SB1400340 / CONSTRUCTION
WE PROPOSE DRILLING THREE SIX-INCH DIAMETER GEOTECHNICAL TEST BORINGS USING THE HOLLOW STEM AUGER METHOD TO EVALUATE THE SUBSURFACE CONDITIONS. THE PROPOSED TEST BORING DEPTHS WILL BE 80 FEET BELOW THE EXISTING GROUND SURFACE. DRILLING EQUIPMENT WILL BE DECONTAMINATED BETWEEN EACH HOLE TO AVOID CROSS CONTAMINATION THROUGHOUT THE SITE. UPON COMPLETION THE GEOTECHNICAL TEST BORINGS WILL BE BACKFILLE...
1244 SOUTH CAPITOL ST SE   
07/11/14 
1244 SOUTH CAPITOL RESIDENTIAL LLC / GEOCAPITOL ENGINEERING LLC
SB1400341 / CONSTRUCTION
WE PROPOSE DRILLING TWO SIX-INCH DIAMETER GEOTECHNICAL TEST BORINGS USING THE HOLLOW STEM AUGER METHOD TO EVALUATE THE SUBSURFACE CONDITIONS. THE PROPOSED TEST BORING DEPTHS WILL BE 80 FEET BELOW THE EXISTING GROUND SURFACE. DRILLING EQUIPMENT WILL BE DECONTAMINATED BETWEEN EACH HOLE TO AVOID CROSS CONTAMINATION THROUGHOUT THE SITE. UPON COMPLETION THE GEOTECHNICAL TEST BORINGS WILL BE BACKFILLED ...
300 TINGEY ST SE   
07/23/14 
CM-YARDS LLC / DWIGHT SMITH
B1408815 / CONSTRUCTION
INSTALL OUTSIDE SEATING SUMMER GARDEN.
201 TINGEY ST SE   
07/11/14 
JBG COMPANIES / GEORGE DELGADO
B1409541 / CONSTRUCTION
ONE DAY SPECIAL EVENT FOR BMW SHOW--150 OCCUPANTS EXTERNAL GENERATOR RESTROOMS AND LIGHTING BAY DOORS TO REMAIN OPEN DURING FUNCTION
   
07/22/14 
JBG/SEFC 170 LLC / MICHAEL B. BELL
E1407422 / SUPPLEMENTAL
300 TINGEY ST SE   
07/08/14 
FVI 2020 / STEPHEN ADAMS; FVI 2020; STEPHEN ADAMS
E14277468 / SUPPLEMENTAL
   
07/10/14 
FORREST CITY AT THE YARDS / CRIS FLACK
TL1400123 / CONSTRUCTION
REVISION TO B1402734 FOR REVISIONS TO MECHANICAL AND ELECTRICAL SYSTEMS.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




Blog/Home
Project Directory
Photo Archive
Event Photos
 
Nats Park
Food Map
What's New
History

 
Demolished Buildings
Historic Photos
Satellite Images
Timeline
 
About JDLand
Message JD
Advertise
Photo Use
 
     © Copyright 2014 JD.