Since January, 2003
            
 (a random before-and-after moment)
January 19, 2003
January 22, 2018
2nd (West) at L, Looking South (see more)

WMATA's Planning, Development, and Real Estate subcommittee has recommended to the full board that NJA Associates LLC (a subsidiary of Donohoe) be picked to purchase and develop the 5,612-sq-ft east entrance of the Navy Yard Metro station at New Jersey and M. Donohoe already owns 16,406 sq ft directly adjoining this property, and has received zoning approvals for its plans to build the 1111 New Jersey Avenue office building on the site; however, they would apparently expand the building's design to 206,000 sq ft with the new land acquisition, or go up to as much as 220,000 sq ft if the Zoning Commmission approves. And since the building would front M Street with this expanded configuration, it would also need to go through a Capitol Gateway Overlay Review to make sure it conforms with the design requirements now expected of M Street buildings.
The full WMATA board will consider approval of the plan to begin negotiating this sale at this Thursday's meeting; you can see a rendering of Donohoe's pre-expansion design on my 1111 NJ page, and also feel free to look at the Joint Development Solicitation from last fall that started this process. (And, anticipating your questions: no, there's been no movement that I've heard or seen on the sale of the Chiller Plant site on the southwest corner of Half and L.)
UPDATE: Of course, the west side of the Navy Yard station is already getting developed and expanded, as work continues on 55 M Street, the office building that will fill the northern portion of Monument's Half Street development.
Comments (0)
   
 
 More About Metro/WMATA

JDLand.com Home

Comments

Sorry, comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

202_cyclist on Tidbit Roundup: Bom dia! We recently returned from a vacation in Portugal where the beers were ...
RMP on Tidbit Roundup: Ice Cream Jubilee is making a 100-foot long Sundae on July 21st. https://www.eve...
RMP on Tidbit Roundup: Opening night at Schilling was overall very good. They have some kinks to work o...
jdc on Tidbit Roundup: I saw the pricing - seems extraordinarily high, even if the food is very good.
CJBabyDaddy on Tidbit Roundup: Dined at Shilling tonight. If the oysters, gnocchi, soft shell crab and corn ca...
Ampersand on Tidbit Roundup: Last Friday my girlfriend and I were walking past Shilling on our way to Conte's...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
100 B/O H ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/14/19
300 B/O TINGEY ST SE   ASSAULT WITH A DANGEROUS WEAPON  07/14/19
900 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 07/09/19
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/09/19
1100 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 07/08/19
300 B/O K ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/05/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 07/03/19
1200 B/O VAN ST SE   THEFT
Theft First Degree (all Other Larceny)
 07/02/19
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/02/19
54 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/28/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/24/19
300 B/O K ST SE   HOMICIDE
Murder I
 06/22/19
50 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/21/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/21/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/20/19
100 B/O H ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 06/19/19
400 B/O M ST SE   THEFT
Shoplifting
 06/19/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 06/18/19
400 B/O M ST SE   THEFT
Shoplifting
 06/17/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 06/16/19
50 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/16/19

Recent Issued Building Permits Archive  
1100 2ND PL SE   
06/25/19 
SQUARE 769N OWNER LLC / THANOS VOREAS
EG1903573 / POST CARD
1212 4TH ST SE   
06/27/19 
FC 1212 LLC / MARK J. RHOTON
E1908902 / SUPPLEMENTAL
1000 5TH ST SE   
07/10/19 
JW ELECTRIC SERVICE / null
E1909222 / SUPPLEMENTAL
   
07/03/19 
UNITED STATES OF AMERICA / TANYA HILL; ALI NAIM
B1911904 / CONSTRUCTION
INSTALL NEW PARTITION AND DOOR IN EXISTING CLASSROOM TO MAKE TWO CLASSROOMS.
100 M ST SE   
06/19/19 
PARSONS / KENNY MERINO; NA
B1908795 / CONSTRUCTION
Interior Demolition and Renovation to 684 Sq Ft of work in order to reduce suite space.
   
07/12/19 
SQUARE 743 INC / KIM MITCHELL
D1900787 / CONSTRUCTION
INTERIOR DEMOLITION WITHIN AN OFFICE SPACE ON THE 9TH FLOOR (MULTI-TENANT FLOOR) IN AN EXISTING OFFICE BUILDING
250 M ST SE   
06/26/19 
BAKER DC LLC / CHRISTINE LONG
AH1901008 / CONSTRUCTION
An after hours permit is respectfully requested from 3AM to 7AM daily
139 N ST SE 20024   
07/12/19 
UNITED STATES OF AMERICA / PAUL E WARREN; PAUL E WARREN
E1909292 / SUPPLEMENTAL
640 SOUTH CAPITOL ST SE   
07/12/19 
CONSOLIDATED RAIL CORPORATION / HARIF BALOGUN; GEOCAPITAL ENGINEERING LLC GEOCAPITAL ENGINEERING
SB1900354 / CONSTRUCTION
We propose drilling six (6), six-inch diameter geotechnical test borings (B-1 to B-6) using the hollow stem auger method to evaluate the subsurface conditions. The proposed test boring depths will be 85 feet below the existing ground surface. If a confining unit is encountered, outer casing will be installed which will extend 10 feet into the top of the confining unit or to the top of bedrock.
300 TINGEY ST SE 170   
07/09/19 
FC BOILERMAKER LLC / GERALD ROPER
B1814633 / CONSTRUCTION
INTERIOR DEMOLITION AND RENOVATION ONLY. DEMOLITION TO INCLUDE REMOVAL OF EXISTING PARTITIONS, KITCHEN EQUIPMENT, AND FINISHES. NEW WORK TO INCLUDE NEW PARTITIONS, MILLWORK, FINISHES, KITCHEN EQUIPMENT (INCLUDING 1 NEW HOOD), AS WELL AS MINOR INTERIOR-ONLY MECHANICAL AND ELECTRICAL MODIFICATIONS. HVAC EQUIPMENT ON EXISTING OUTDOOR MECHANICAL MEZZANINE TO REMAIN. NO MODIFICATIONS TO EXISTING HISTO...
300 TINGEY ST SE   
06/26/19 
FC BOILERMAKER LLC / ADAM C. MARSON
M1903231 / SUPPLEMENTAL
   
07/12/19 
FC BOILERMAKER LLC / DOMINIC E TOTARO; DOMINIC E TOTARO
M1903450 / SUPPLEMENTAL
355 WATER ST SE   
07/10/19 
UNITED STATES OF AMERICA / JOHANNA DELONY
TN1900122 / CONSTRUCTION
Sterne Kessler Crab Feast--1 40'x 100' tent, with 372' of white picket fencing; no generators.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.