On Thursday night the Zoning Commission had another hearing on Case 06-41, Camden Development's 276-unit residential project at 1325 South Capitol Street. It's been a long trek for this project, having been caught in limbo as the Capitol Gateway Overlay was expanded to include their location and as the city's Inclusionary Zoning law came into being, and so they were back for another hearing because it was decided that in order to properly handle the case it needed to be resubmitted as a Planned Unit Development--I can't bear to try to get anymore specific than that, so here's the transcript from the March ZC hearing on the matter. The submitted plan last night was basically same as at their February hearing (here's the transcript).
Commissioner Turnbull led the questioning, and he seemed exasperated by the western facade of the project, expressing much concern it since will be facing the low-rise residential neighborhood in Southwest; even though the developer had added some additional articulation since the last hearing, he considered it "bland" and remarked that it's not just the back of a building, because it's very visible to the surrounding neighborhood. Turnbull also asked for information on where the affordable housing units will be in the building, wanting to make sure they wouldn't only be on the west side of the building; the developers responded that they are spread throughout floors 1-6 on three sides of the building. Turnbull also took issue with the non-green design of the roof, but the developers explained that they had to put the air conditioning mechanics on the roof to lessen the noise impact on the neighbors. The other two commissioners present, Hood and Parsons, expressed their strong support for all of the issues brought up by Turnbull.
Joel Lawson of the Office of Planning testified in support of the project, mentioning that the landscaped courtyard in the back will be a "nice feature" for neighbors; he said that additional articulation of the rear of the building would be fine, but that OP was happy with the current massing. It was also noted that ANC 6D supports the project as well. And the wife of one neighbor who had originally wanted to testify in opposition to the project announced they were now supporting it, after the ANC negotiated a deal for the neighors at 2, 4, 6, and 8 O Street to be able to lease parking spaces in the project's garage for 50% off the market rate.
The commission asked for documentation on the affordable-housing unit layout and some additional work on the rear side of the building; the submittal, response, and draft order process is to be completed by June 21, with a vote to be scheduled soon afterward.
 

See All Current News Items

Comments

Sorry, comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2014!

Tell readers about your
apartment/house/item
for two weeks for $5.
Someone's looking for
what you're selling!
List it here.
Recent Comments:  
JD on Grosvenor Looking for: My methods are proprietary. :-) (JES, fixed your link)
smokie on Grosvenor Looking for: @ JES, annoying they can't get the name right; to be fair, I...
JES on Grosvenor Looking for: This is a pet peeve, but when are people going to stop listi...
JES on Grosvenor Looking for: "a stadium seating outdoor theater with a view of the b...
Latest News
  
For past mile markers in the neighborhood's evolution,
see my Near Southeast DC Timeline.

 
Thousands and thousands of photos showing the neighborhood changing. More than 150 buildings no longer with us. All the news, since 2003. Photos from various archives showing the neighborhood in the more distant past. Maps from the early 1900s. Overhead Photo Comparisons: 1949, 1988, 2002-2008. All Blog Entries, 2003 - Present Major Events, 1799 - Present A series of blog entries looking at the neighborhood's history.
Near Southeast's Rearview Mirror
Today in (Recent) Near Southeast History


City Government Data for Near Southeast
Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
100 B/O L ST SE   THEFT F/AUTO /  04/05/14
1500 B/O SOUTH CAPITOL ST   THEFT /  04/04/14
330 B/O K ST SE   THEFT /  04/04/14
16 B/O M ST SE   THEFT /  04/04/14
700 B/O L ST SE   THEFT /  04/03/14

Active Public Space Permits Archive  
1011 1ST ST SE    COLIN CLARK 
Pending
excavation; new  
 03/03/14
to
05/01/14
    COLIN CLARK 
Approved (Pending Payment)
paving; landscaping; new  
 04/23/14
to
06/27/14
1331 2ND ST SE    Carlton Ray 
Assigned
paving; streetfixture; excavation  
 02/10/14
to
02/09/15
1201 M ST SE    Michael Manoski 
Pending Document
excavation  
 05/06/13
to
05/05/14
1333 M ST SE    WASHINGTON GAS 
Assigned
excavation  
 05/01/13
to
04/30/14
1111 NEW JERSEY AVE SE    NJA Associates LLC 
Assigned
paving; streetfixture; landscaping; excavation; new  
 06/03/13
to
06/02/14
301 TINGEY ST SE    Chuchart Kampirapang 
Assigned
 
 06/07/13
to
06/06/14
    Potbelly Sandwich Works LLC 
Issued
new  
 03/21/12
to
11/27/14

Recent Issued Building Permits Archive  
1011 1ST ST SE   
04/09/14 
MILLER?LONG
AH1400386 / CONSTRUCTION
AFTERHOURS TO TAKE DOWN TOWER CRANE WITH 200 TON CRANE SAT ? SUN 4 / 12 / 2014 AND 4 / 13 / 2014 FROM 5AM TO 9PM
   
04/21/14 
TOLL DC LP / DELAWARE ELEVATOR INC
EN1401543 / SHOP DRAWING
TYPE OF ELEVATOR : ONE (1) MRL / STEEL / FRONT OF BLGD / PASSENGER. (VELOCITY RIVER PARK / PLASE 2 / CAR A)
1381 1ST ST SE   
04/07/14 
DISTRICT OF COLUMBIA /
SB1400233 / CONSTRUCTION
INSTALLATION OF 3 GEO SOIL BORINGS TO A DEPTH OF 30FT 4' DIAMETER USING GEOPROBE 3 OUT OF 3 ARE TMMW
1212 4TH ST SE   
04/09/14 
GSA GSA / BRIAN FREW; GSA GSA; JOSEPH RICHARDS
E37554102 / SUPPLEMENTAL
1000 5TH ST SE   
04/04/14 
DC HOUSING AUTHORITY / KIM MITCHELL CDKM CONSULTING LLC
B1404942 / CONSTRUCTION
TEMPORARY CONSTRUCTION TRAILER TEMPORARY CONSTRUCTION FENCE AROUND THE PERIMETER OF THE PROPERTY AND TWO PORTA POTTIES AND TO INCREASE TO A TOTAL OF 4 PORTA POTTIES AT THE PEAK OF CONSTRUCTION. TRAILERS WILL BE ON BLOCKED ON TEMPORARY CMU BLOCKS - POWERED FROM TEMPORARY SERVICE BY PEPCO TRAILERS WILL BE EQUIPPED WITH RESTROOM SYSTEM THAT WILL BE SERVICED - NO PLUMBING LINES AS THEY ARE SELF CONTAINED
   
04/11/14 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KIM MITCHELL CDKM CONSULTING LLC
SH1400015 / CONSTRUCTION
SHEETING ? SHORING FOR NEW COMMUNITY CENTER
1220 12TH ST SE   
04/15/14 
WASHINGTON GAS LIGHT CO / STEPHEN R. HOLMAN
P1404623 / SUPPLEMENTAL
1015 HALF ST SE   
04/09/14 
HALF ST SE LLC / SAM HOLLEN RAMCO OF DC INC.
B1405731 / CONSTRUCTION
INTERIOR RENOVATION FOR 1ST FLOOR SERVICE CORRIDOR. PARTITIONS DOORS MECHANICAL ELECTRICAL AND LIFE SAFETY.
75 I ST SE   
04/07/14 
DRI DEVELOPMENT SERVICES LLC / JOSE S ALVARADO; DRI DEVELOPMENT LLC; JOSE S ALVARADO
E16994763 / SUPPLEMENTAL
   
04/07/14 
DRI DEVELOPMENT SERVICES LLC / JOSE S ALVARADO; DRI DEVELOPMENT LLC; JOSE S ALVARADO
E10943636 / SUPPLEMENTAL
409 I ST SE   
04/07/14 
SCOTT A FAULK TRUSTEE / RALPH THREATT
E1404619 / SUPPLEMENTAL
309 K ST SE   
04/06/14 
GERRITT LANG
PC61450444 / POST CARD
REPLACEMENT OF NOT MORE THAN 1 GAS APPLIANCE ON A RESIDENTIAL COMMERCIAL OR INDUSTRIAL PROJECT.
306 L ST SE   
04/17/14 
MICHAEL THOMPSON
B1311538 / CONSTRUCTION
1.CRAWL SPACE FOUNDATION REPAIR CRAWL SPACE UNDERPINNING AND EXCAVATION 2. ADD CONCRETE SLAB AND EGRESS WINDOW. 3. UPGRADE EXISTING ELECTRICAL PLUMBING AND MOVE MECHANICAL CLOSET
601 L ST SE   
04/21/14 
DC HOUSING AUTHORITY / ANGEL REYNOLDS
SH1400035 / CONSTRUCTION
TEMPORARY SHEETING AND SHORING REQUIRED TO ALLOW CONSTRUCTION PF NEW BUILDING AT 601 L ST SE.
50 M ST SE   
04/17/14 
KEN FINKELSTEIN ENGLEWOOD LLC / DAVID BOOKBINDE ECS MID-ATLANTIC LLC
SB1400244 / CONSTRUCTION
A TOTAL OF 6 BORINGS WILL BE ADVANCED ACROSS THE PROPERTY WITH A GEOPROBE DRILL RIG TO A DEPTH OF 25 FEET BELOW SURFACE GRADE. THE DIAMETER OF THE BOREHOLE WILL BE 2.25 INCHES. SOIL WILL BE SCREENED THROUGHOUT THE DEPTH OF EACH BORING AND EACH 5-FOOT COMPOSITE SAMPLE WILL BE ANALYZED. GROUNDWATER WILL BE COLLECTED FROM TEMPORARY WELLS IN THREE BORINGS IF ENCOUNTERED. ALL BORINGS WILL BE GROUTED WITH APPROVED BENTONITE SLURRY UPON COMPLETION. SEE WORKPLAN FOR ADDITIONAL DETAILS.
901 M ST SE   
04/14/14 
CARLTON RAY / DANIEL SCHAALE
AH1400397 / CONSTRUCTION
EXCAVATION IN ROADWAY
1201 M ST SE   
04/14/14 
CARLTON RAY / DANIEL SCHAALE
AH1400396 / CONSTRUCTION
EXCAVATION IN ROADWAY
   
04/14/14 
SAMUEL PAXTON
PC81065987 / POST CARD
REPLACEMENT OF NOT MORE THAN 1 PLUMBING FIXTURE ON A RESIDENTIAL COMMERCIAL OR INDUSTRIAL PROJECT.
86 N ST SE   
04/17/14 
BELFAST VALLEY CONTRACTORS / KIM MITCHELL CDKM CONSULTING LLC
TC1400011 / CONSTRUCTION
ERECT TEMPORARY TOWER CRANE AT 1ST AND N ST SE
1000 NEW JERSEY AVE SE   
04/14/14 
PHILIP BROWN
PC47087282 / POST CARD
REPLACEMENT OF NOT MORE THAN 1 GAS APPLIANCE ON A RESIDENTIAL COMMERCIAL OR INDUSTRIAL PROJECT.
1500 SOUTH CAPITOL ST SE   
04/07/14 
WASHINGTON NATIONALS STADIUM LLC / FRED GRIFFITH; WASHINGTON NATIONALS STADIUM LLC; JAY LIVESAY
E53144683 / SUPPLEMENTAL
301 TINGEY ST SE   
04/11/14 
NA NA NA
EHOP1490466 / HOME OCCUPATION
   
04/11/14 
NA NA NA
EHOP1490467 / HOME OCCUPATION
301 WATER ST SE   
04/04/14 
FC LUMBER SHED LLC / RICHARD V CAREY
P1404549 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Projects Underway
Twelve12/Yards
Park Chelsea
Southeast Blvd.
River Parc
  
Nationals Park
Visiting Nats Park
What's New Around the 'Hood
Food Options Map
Parking/Transportation
Ballpark Construction Photos
Stadium Event Photos
In the Pipeline
Hampton Inn
1111 New Jersey
800 NJ/Whole Foods
Lofts at Capitol Quarter
Ballpark Square
New Douglass Bridge
Yards at DC Water
Virginia Ave. Tunnel
99 M St.
Monument/Half Street
Community Center
Capper Apartments
250 M Street
Florida Rock
909 Half Street
Congressional Square
1000 South Capitol
SC1100
New Marine Barracks
Factory 202/Yards
Nat'l Comm. Church
Completed
Lumber Shed ('13)
Boilermaker Shops ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts/Yards ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 NJ Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
Nationals Park ('08)
70/100 I ('08)
Seniors Bldg Dem. ('07)
400 M ('07)
SoCap Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Overviews
Capper/Carrollsburg
Ballpark District
New Jersey Ave.
M Street
South Capitol St.
WASA
The Yards
Lower 8th Street
East M Street
Boathouse Row


Links of Interest

JDLand.com Wins 2008 Knight-Batten Citizen Media Award
As part of the Knight-Batten Awards for Innovations in Journalism, JDLand was given the 2008 Citizen Media Award. Read all about it.

Capitol Riverfront Business Improvement District
Covering Near Southeast & Buzzard Point.

Studies/Initiatives/Government Documents:
11th Street Bridges EIS
South Capitol St. Bridge EIS
South Capitol Gateway Corridor/Anacostia Access Study
Anacostia Riverwalk Trail
NCPC's New Vision for South Capitol Street (2005 Update)
Anacostia Waterfront Initiative (2005)
Near Southeast Draft Urban Design Framework (2003)
Urban Land Institute South Capitol Street Corridor Report (2003)
Neighborhood Strategic Action Plan (2002)
DC Streetcars (may run down M Street SE someday)

Capitol Gateway and Southeast Federal Center Zoning Overlays
Two documents that spell out in extreme detail exactly what the requirements are for developments along South Capitol, M, in the Ballpark District, and at "The Yards". Read also my short explanatory treatise on these two overlays.

Pre-Redevelopment Media Overviews:
A Transformed Neighborhood Awaits Stadium (WP, 8/15/05)
      includes huge map of development plans
The Morphing of a Forgotten Neighborhood (WP, 9/2/2004)
      A brilliant take on the neighborhood!
Betting Big on Near Southeast (WP, 7/15/04)
Hope for the Waterfront (WBJ, 01)
Seeking a Better View On the Waterfront (WP, 3/8/98)
 

DC Government
Mayor's Office
Planning/Economic Development
   Office of Planning
DC Consumer & Regulatory Agency
DC Office of Zoning
DC Municipal Regulations | Zoning
DC Dept. of Transportation

DC City Council
Tommy Wells

ANCs: 6D | 6B
David Garber (6D07)
Kirsten Oldenburg (6B04)
Police: MPD-1D | PSA 105

Other Organizations
National Capital Planning Commission
Earth Conservation Corps
Capitol Hill Restoration Society
Barracks Row Main Street
Marines Community Integrated Master Plan
 

 

News Publications
The Hill Rag
The Southwester

Other DC Neighborhood/City Blogs
SW DC - The Little Quadrant That Could
The Hill is Home
Congress Heights on the Rise
Greater Greater Washington
WashCycle
Penn Quarter Living
Frozen Tropics
The Triangle
14th and You
The 42
Beyond DC
Richard Layman
 




Top of Page | Contact JD | Advertise on JDLand
Near Southeast RSS Feed

© Copyright 2014 JD.
All photos © Copyright JD - See information on photo uses, licensing and purchasing.