On April 9, the DC Zoning Commission will be entertaining Case 07-08, an emergency request to allow for changes to the Capitol Gateway Zoning Overlay to allow for the construction of temporary surface parking lots--to last no more than five years--on certain squares within Near Southeast. There is also a companion case, 03-12E/03-13E, specifically requesting a minor modification to the Capper/Carrollsburg zoning orders to allow surface parking lots on four squares within Capper--the three blocks bounded by 2nd, I, M, and 3rd (next to Canal Park) and on Square 882, the current home of the old Capper Seniors building, which is expected to be demolished this summer.
I'm not going to go into great detail, because I need to pace myself on the subject of parking or else I will pop a vein before Opening Day. But here's the gist: the city and the Nationals want to be able to build temporary surface parking to handle the estimated 3,800 cars that will need parking beyond the 1,225 spaces on the stadium site. These lots will be available as public parking during non-event times (so you DOT workers who want to drive to work should be paying close attention). This zoning request covers certain squares directly around the stadium and at Capper; apparently there will be a subsequent submission requesting similar amendments to the Southeast Federal Center Overlay to allow surface parking there as well.
As to why the Office of Planning is supporting this request, here's a quote from their report to the Zoning Commission (emphasis mine): "Although much of the parking needed to serve the Ballpark's patrons will eventually be accommodated by parking within nearby future buildings, these buildings will not yet be constructed when the Ballpark opens in 2008. While OP strongly encourages the use of mass transit and encourages the Nationals to provide meaningful incentives for the use of mass transit and other alternatives to the private automobile, OP shares their concern that a short term shortage of parking available to patrons could lead to illegal parking on streets and private property in the surrounding area, and could have an impact on the short term success of this important District facility. This proposal would help to address the short term need for an interim parking solution."
And, another OP quote (again, emphasis mine): "Normally, OP is not supportive of surface parking lots. In addition to being a poor use of the District's valuable land base, extensive surface parking lots disrupt neighborhood fabric; can be a source of crime, noise, trash, and light-spill; encourage the use of the private automobile over other less environmentally damaging forms of transportation; and contribute significantly to storm water run-off water pollution problems facing our great river systems. OP would not support surface parking on these squares as a permanent use to address currently perceived parking need."
For more background and explanation of OP's stance, I strongly suggest reading the OP report (specifically the last four pages).
And, against my better judgment, I have created a new Planning for Stadium Transportation and Parking page, pulling together the various documents that have been released recently (mainly from last month's TOPP meeting). I've also thrown together a map that is nowhere near official marking what I understand to be various possible locations for stadium parking. It will change as time goes on, and do not take it as gospel, but it does show which sites come under this zoning request, along with other possible sites. Opening Day is still a year away, and there will be much jawboning on this subject over the coming weeks and months. So, everyone take a deep breath, keep an eye on updates as more information gets released, and try not to panic too far ahead of time.
UPDATE: And with fine timing, Near Southeast's councilman Tommy Wells has just announced the creation of a new transportation task force for Near Southeast and Southwest, bringing together representatives of the government, residents, and developers to address the concerns of neighborhoods facing not only baseball, but also the coming influx of thousands of new workers and residents.

Comments (0)
 
 More About Nationals Park

JDLand.com Home

Comments

No comments posted.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2015!
 Top News
  
JD on Winery Looking to: Not necessarily. Note that I said "footprint" square footage, which didn't accou...
ZoolanderANDtheBoYz on Winery Looking to: I guess instead of building two buildings. They will end up building one big bui...
JES on Winery Looking to: Looks like we're 2 years out at best :-(
Alan on The Big Picture: Re: 50M. We were starting to wonder about this. There were only about 3 or 4 gu...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O 8TH ST SE   THEFT F/AUTO
 05/01/15
1100 B/O NEW JERSEY AVE SE   THEFT
2nd Degree
 04/26/15
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2 (Theft F/Building)
 04/25/15
   THEFT
Theft 2 (Theft F/Building)
 04/23/15
400 B/O M ST SE   THEFT
2nd Degree
 04/22/15
1000 B/O 3RD ST SE   THEFT
2nd Degree
 04/20/15
1100 B/O NEW JERSEY AVE SE   THEFT
2nd Degree
 04/12/15
1100 B/O NEW JERSEY AVE SE   THEFT
2nd Degree
 04/10/15
100 B/O L ST SE   THEFT
Theft 2 (Theft F/Building)
 04/10/15
100 B/O K ST SE   THEFT F/AUTO
 04/08/15
50 B/O M ST SE   THEFT
2nd Degree
 04/07/15
100 B/O K ST SE   THEFT F/AUTO
Theft From Auto 1
 04/04/15
400 B/O M ST SE   THEFT
Shoplifting
 04/03/15

Active Public Space Permits Archive  
1401 11TH ST SE    Maryland Transit Administration 
Issued
new  
 12/30/14
to
12/29/15
861 NEW JERSEY AVE SE    CSX Transportation Inc. 
Assigned
paving; excavation  
 01/09/15
to
10/09/15
1100 NEW JERSEY AVE SE    Capitol Riverfront BID 
Issued
streetfixture; new  
 08/19/14
to
08/18/15

Recent Issued Building Permits Archive  
1011 1ST ST SE   
04/20/15 
COLIN CLARK / MICHAEL BIANCO; COLIN CLARK; MITCH PERMUY
E98099105 / SUPPLEMENTAL
1277 1ST ST SE   
04/15/15 
BALLPARK RESIDENTIAL LLC / CLARK CONSTRUCTION GROUP LLC
AH1500366 / CONSTRUCTION
ON-SITE PROJECT WORK AND TRUCK DELIVERY HOURS 6:00AM - 7:00PM MONDAY THROUGH SATURDAY FOR THE PROJECT DURATION AND THE FOLLOWING HOLIDAYS: EMANCIPATION DAY 4 / 16 / 15 COLUMBUS DAY 10 / 12 / 15 VETERANS DAY 11 / 11 / 15
1331 2ND ST SE   
04/27/15 
CORMAN CONSTRUCTION
AH1500391 / CONSTRUCTION
ADDITION OF STRUCTURES TO EXISTING FOR SEWER DIVERSION
1331 4TH ST SE   
04/17/15 
CLARK CONCRETE
AH1500371 / CONSTRUCTION
AFTERHOURS TO POUR CONCRETE ON ROOF FROM 4 / 20 / 2015 TO 5 / 20 / 2015 FROM 7PM TO 7AM
   
04/21/15 
FC 1331 LLC / JAMES G HOLT
E1505081 / SUPPLEMENTAL
   
04/28/15 
FC 1331 LLC / JOHN E KELLY
E1505324 / SUPPLEMENTAL
1150 5TH ST SE   
04/15/15 
DGS DCPS / BRUCE PAIGE INDUSTRIAL SERVICES
B1506192 / CONSTRUCTION
REPLACE EXISTING INOPERABLE GENERAC GENERATOR WITH A NEW 6.7L GENERAC GENERATOR
   
04/28/15 
DISTRICT OF COLUMBIA / TYRAN D. BRANNUM
E1505319 / SUPPLEMENTAL
1007 8TH ST SE   
04/28/15 
CALLE OCHO LLC / DONALD V. ELLENBERGER
M1501749 / SUPPLEMENTAL
1015 HALF ST SE   
05/01/15 
PRUDENTIAL / KRISTINA DELGADO
B1506909 / CONSTRUCTION
INTERIOR ALTERATION TO PARTIAL 1ST FLOOR SECURITY SUITE MAILROOM AND STORAGE.
   
05/01/15 
HALF ST SE LLC / JOSEPH J FLYNN
E1505425 / SUPPLEMENTAL
82 I ST SE   
04/24/15 
GREYSTAR /RCP DEVELOPMENT / KIM MITCHELL CDKM CONSULTING LLC
SH1500031 / CONSTRUCTION
REVISION TO PERMIT #SH1400084 TO REMOVE TIE-BACKS - ALL BRACING WILL BE ENTIRELY FROM INSIDE THE EXCAVATION BY USE OF CROSS LOT AND CORNER LOT AND RACKERS IN AN EFFORT TO KEEP ALL MEASURES INSIDE THE PROPERTY LINE.
   
05/01/15 
CSX TRANSPORTATION INC / KIM MITCHELL
FD1500026 / CONSTRUCTION
FOUNDATION TO GRADE WORK FOR NEW 13-STORY RESIDENTIAL PROJECT AT EYE STREET AND NEW JERSEY AVE SE
41 L ST SE   
04/30/15 
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY C/O MRP REALTY / JOHN DIEHL C/O ECC INC.
SB1500258 / CONSTRUCTION
DUE DILIGENCE INVESTIGATION: INSTALLATION OF FIVE 3-INCH DIAMETER GEOPROBE SOIL BORINGS EXTENDING TO DEPTHS OF 25 FEET BELOW GRADE. BORINGS WILL BE ABANDONED ON THE SAME DAY AS DRILLING VIA TREMIGROUT APPLICATION OF BENTONITE SLURRY CONSISTING OF TWO POUNDS OF BENTONITE POWDER TO ONE GALLON OF WATER.
55 M ST SE   
04/14/15 
HINES GLOBAL REIT / JOHN GIUSEPPE-RAMCO
TL1500090 / CONSTRUCTION
FIRST TIME TENANT CONSTRUCTION FOR NEW OFFICE SPACE ON THE 9TH FLOOR FINCANTIERI MARINE GROUP AS SHOWN ON THE ATTACHED THIRD PARTY REVIEWED AND APPROVED MECH. PLUMB. ELECT. FIRE PROTECTION AND ARCH. PLANS BY KTA GROUP. INTERIOR WORK ONLY. NO CHANGE IN USE.
   
04/15/15 
HINES GLOBAL REIT / JOHN GIUSEPPE-RAMCO
TL1500077 / CONSTRUCTION
TENANT LAYOUT TO CONSTRUCTION NEWTHIRD FLOOR OFFICE SPACE FOR GREAT MINDS AS SHOWN ON THE ATTACHED THIRD PARTY REVIEWED AND APPROVED MECH. PLUMB. ELECT. FIRE PROTECTION AND ARCH. DWGS. BY KTA. INTERIOR WORK ONLY NO STRUCTURAL WORK INVOLVED.
   
04/17/15 
HINES GLOBAL REIT 55 M STREET LLC /
P1505068 / SUPPLEMENTAL
   
04/22/15 
HINES GLOBAL REIT 55 M STREET LLC / JOSEPH SAFFER
P1505229 / SUPPLEMENTAL
80 M ST SE   
04/20/15 
WELLS REIT II 80 M STREET LLC / JOHN GIUSEPPE-RAMCO
B1503697 / CONSTRUCTION
RENOVATIONS TO EXISTING 5TH FLOOR OFFICE SPACE FOR TASC PHASE I AS SHOWN ON THE ATTACHED THIRD PARTY REVIEWED AND APPROVED MECH. PLUMB. ELECT. FIRE PROTECTION DEMOLITION AND ARCH. DWGS. BY KTA. INTERIOR WORK ONLY. NO STRUCTURAL WORK INVOLVED. NO CHANGE IN USE.
   
04/22/15 
WELLS REIT II 80 M STREET LLC /
P1505220 / SUPPLEMENTAL
50 M ST SE   
05/01/15 
KCG 50 M LLC
SH1500032 / CONSTRUCTION
REVISION TO SH1400087 TO CHANGE SHEETING / SHORING DESIGN AND TO CHANGE THE CONTRACTOR.
55 M ST SE   
04/23/15 
HINES GLOBAL REIT 55 M STREET LLC / BERNARD D SASSER
E1505192 / SUPPLEMENTAL
80 M ST SE   
04/21/15 
WELLS REIT II 80 M STREET LLC / RONNIE E WRIGHT
E1505080 / SUPPLEMENTAL
   
04/21/15 
NOT AVAILABLE NOT AVAILABLE / NEIL NUTWELL; NOT AVAILABLE NOT AVAILABLE; NEIL NUTWELL
P84507258 / SUPPLEMENTAL
   
04/21/15 
UNKNOWN UNKNOWN / PATRICK BARRON; UNKNOWN UNKNOWN; ROBIN MALLEY
E38207212 / SUPPLEMENTAL
   
04/22/15 
WELLS REIT 80 M STREET LIC / FRED MILLER; WELLS REIT 80 M STREET LIC; DOMINIC TOTARO
AR62521964 / SUPPLEMENTAL
   
04/23/15 
TASC TASC / KEVIN HOOVER; TASC TASC; KEVIN HOOVER
E43277941 / SUPPLEMENTAL
100 M ST SE   
04/28/15 
SQUARE 743 INC / DAVID RAINE; SQUARE 743 INC; DAVID RAINE
P38575591 / SUPPLEMENTAL
300 M ST SE   
04/21/15 
NA NA NA
EHOP1290001 / HOME OCCUPATION
800 NEW JERSEY AVE SE   
04/27/15 
BAKER DC LLC / CHRISTINE LONG
AH1500376 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 7:00PM THRU 7:00AM MONDAY THRU SUNDAY
1000 NEW JERSEY AVE SE   
04/13/15 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / BRIAN DENNIS
P1504947 / SUPPLEMENTAL
1500 SOUTH CAPITOL ST SE   
04/15/15 
WASHINGTON NATIONALS STADIUM LLC / JOHN GIUSEPPE-RAMCO
B1506296 / CONSTRUCTION
REVISION TO BLDG. PERMIT B1503799 NEW TEAM STORE AT NATIONALS PARK AS PER THE ATTACHED THIRD PARTY REVIEWED AND APPROVED REVISED MECH. PLUMB. ELECT. FIRE PROTECTION AND ARCH. PLANS BY ECS MID ATLANTIC LLC. ORIGINAL APPROVED PLAN SET ATTACHED ALONG WITH WRITTEN DESCRIPTION OF CHANGES MADE.
   
04/17/15 
WASHINGTON NATIONAL STADIUM LLC / DOMINIC E TOTARO
M1501639 / SUPPLEMENTAL
   
04/17/15 
WASHINGTON NATIONALS STADIUM / STEPHEN J. EXELBERT
P1505092 / SUPPLEMENTAL
   
04/22/15 
WASHINGTON NATL STADIUM / JAMES W. SCHIFFHAUER
E1505137 / SUPPLEMENTAL
   
04/28/15 
JOHN GIUSEPPE / DONALD VEALS; JOHN GIUSEPPE; DONALD VEALS
E55177883 / SUPPLEMENTAL
355 WATER ST SE   
04/29/15 
TOUR DE FAT / PAUL GRUBER
TN1500105 / CONSTRUCTION
SPECIAL EVENT TOUR DE FAT 1 36X24 STAGE 1 16X24 STAGE 6 20X20 TENT 35 10X10 TENTS 1 20X20 HEXAGON CABARET TENT YARD PARK ALL TENT TO BE INSIDE THE PARK (42 TENTS)
1409 WATER ST SE   
04/28/15 
D.C. WATER /
B1507009 / CONSTRUCTION
TO INCLUDE A TEMPORARY WOOD POLE WHICH WILL BE THERE FOR 5 YEARS WHICH IS THE ESTIMATED TIME IT WILL TAKE TO COMPLETE THE ANACOSTIA RIVER TUNNEL PROJECT.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
1022 - 1109 M ST SE   03/27/15
$ 5,000,000
WASHINGTON HUMANE SOCIETY
 
9TH ST SE   03/03/15
$ 3,730,000
818 POTOMAC AVENUE SE LLC
 
POTOMAC AV SE   03/03/15
$ 3,730,000
818 POTOMAC AVENUE SE LLC
 
POTOMAC AV SE   03/03/15
$ 3,730,000
818 POTOMAC AVENUE SE LLC
 
POTOMAC AV SE   03/03/15
$ 3,730,000
818 POTOMAC AVENUE SE LLC
 
1103 9TH ST SE   03/03/15
$ 3,730,000
818 POTOMAC AVENUE SE LLC
 
1105 9TH ST SE   03/03/15
$ 3,730,000
818 POTOMAC AVENUE SE LLC
 
816 POTOMAC AVE SE   03/03/15
$ 3,730,000
818 POTOMAC AVENUE SE LLC
 
0819R L ST SE   03/03/15
$ 3,730,000
818 POTOMAC AVENUE SE LLC
 
1201 HALF ST SE   02/19/15
$ 9,000,000
WEST HALF RESIDENTIAL II LLC
 
N ST SE   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
0038 N ST SE   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
0036 N ST SE   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
R N ST SE   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
0030 N ST SE   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
0032 N ST SE   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
N ST SE   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
1275 HALF ST   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
HALF ST   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
M ST   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
1ST ST SE   02/10/15
$ 1,913,472
BALLPARK HOTEL LLC
 
1ST ST SE   02/10/15
$ 1,913,472
BALLPARK HOTEL LLC
 
1ST ST SE   02/10/15
$ 1,913,472
BALLPARK HOTEL LLC
 
1ST ST SE   02/10/15
$ 6,600,000
BALLPARK RESIDENTIAL LLC
 
1ST ST SE   02/10/15
$ 6,600,000
BALLPARK RESIDENTIAL LLC
 
1ST ST SE   02/10/15
$ 6,600,000
BALLPARK RESIDENTIAL LLC
 
1ST ST SE   02/10/15
$ 6,600,000
BALLPARK RESIDENTIAL LLC
 


Project Directory




     © Copyright 2015 JD.