Since January, 2003
            
 (a random before-and-after moment)
November 11, 2004
June 25, 2009
4th at L, Looking Northeast (see more)

Today there is demolition being done on the two-story Capper buildings on the block bounded by 3rd, L, 2nd and K. It's the second-to-last remaining block of Capper structures (along with those one block to the north), and one would think these shouldn't take that long to demolish (famous last words). The three blocks between I and M and 2nd and 3rd that face the school bus lots/Canal Park site will eventually be home to three mixed-income apartment buildings totalling 550 units--a six-story 147-unit building between I and K, an 11-story 295-unit tower between K and L, and a 10-story 107-unit building south of L, on the north end of the block that will also be home to the 250 M Street office building. There has been no timeline announced for when construction on any of these three apartment buildings would begin.
Comments (0)
   
 
 More About Capper
 All posts: Capper

JDLand.com Home

Comments

Sorry, comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Top News
  

JD on Cosmopolitan Nail Lounge: I think the only thing missing in the okay-it's-really-a-neighborhood-now lineup...
dude on Cosmopolitan Nail Lounge: Everyone else is going to be so pretty in this neighborhood I will no longer fit...
snakegriffin on Cosmopolitan Nail Lounge: If it's anything like our experience with Philz opening shortly after we moved i...

Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/13/17
1100 B/O 8TH ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 01/08/17
100 B/O K ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 01/06/17
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/02/17
700 B/O M ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 12/30/16
400 B/O M ST SE   THEFT
Theft First Degree (shoplifting)
 12/26/16
1100 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle) - Highway/ Road/ Alley/ Street/ Sidewalk
 12/20/16
70 B/O I ST SE   THEFT FROM AUTO
Theft (theft Of Motor Vehicle Parts Or Accessories)
 12/19/16
500 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/18/16
1000 B/O 7TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/18/16
900 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/17/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/16/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree - Felony (theft From Building)
 12/15/16

Recent Issued Building Permits Archive  
1100 2ND PL SE   
12/28/16 
LIDIA BARDI SQUARE 769N OWNER, LLC / LIDIA BARDI SQUARE 769N OWNER, LLC; GEORGE KING MORETRENCH AMERICAN CORPORATION
SB1700048 / CONSTRUCTION
Drill and construct three 6 inch diameter dewatering wells within 12 inch boreholes to 70 feet below existing grade via mud rotary drilling methods. Drill and construction 2 - 2 inch diameter observation wells within in 8 inch boreholes to 60 feet below existing grade via mud rotary drilling methods. All drill spoils will be contained, tested and disposed of per DOEE regulations.
2 I ST SE   
12/27/16 
MCDONALDS CORPORATION / MCDONALDS CORPORATION; ECS MID-ATLANTIC LLC
SB1700081 / CONSTRUCTION
ECS proposes the installation of six soil borings to a maximum depth of 30 feet below ground surface. Each boring will be completed with a Geoprobe drill rig and grounted following installation using a DOEE approved grount mix.
28 K ST SE   
12/28/16 
23 LLC / RELATED COMPANIES; ACCUPERMIT LLC; ACCUPERMIT LLC
SG1700100 / CONSTRUCTION
Sign / mural to be on west elevation of new commercial building at 28 K Street SE. Temporary only for 12 months.
100 M ST SE   
12/28/16 
SQUARE 743 INC / null
E1702426 / SUPPLEMENTAL
1200 NEW JERSEY AVE SE 20024   
12/30/16 
JBG/FEDERAL CENTER LLC / CARL E HAGER
E1702487 / SUPPLEMENTAL
   
01/04/17 
JBG/FEDERAL CENTER LLC / null
P1702555 / SUPPLEMENTAL
1244 SOUTH CAPITOL ST SE   
01/05/17 
EXTREME STEEL CRANE AND RIGGING
AH1700321 / CONSTRUCTION
PLACE CRANE ON S. CAPITOL STREET TO PUT TOWER CRANE UP.
385 WATER ST SE 20003   
12/28/16 
FC 385 WATER LLC / STEPHEN J. EXELBERT
P1702437 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2017 JD.