Since January, 2003
            
 Page Through from Before to After

Today was a bonanza of Near Southeast alley closing requests, as four pending bills received their public hearings in front of the city council "Committee of the Whole" (i.e., Chairman Cropp, the only council member in attendance).
The first was B16-0799, alley closings and new street designations as part of the Capitol Quarter/Capper Carrollsburg project. Nothing really new in the testimony, except that it has been requested that the bill be considered by the council on an emergency basis, in order to help speed the process of getting the project underway. Ms. Cropp called the project "very, very exciting" and seemed particularly enthused by the mixed-income aspect of the project, noting that the city's past creation of "economic ghettos" hasn't worked out well.
Next up was B16-0888, which seeks to reopen H and I streets between 2nd and New Jersey, and to close alleys and streets within those two blocks; I was not aware until today that a portion of this land is actually federal land (Reservation 17A), which is part of the land transfer bill currently pending before Congress. The northern block (Square 737, north of I) is where William C. Smith is planning a mixed-use project, which in their testimony they broke out as two office buildings totalling 600,000 sq ft, two apartment buildings totalling 600 units (with a 10% affordable housing component), 1100 parking spaces, and 80,000-100,000 sq ft of retail space. They mentioned that back when they first bought the land in 1999 they got a letter of intent from Whole Foods to include a grocery store in this location, but then Whole Foods came down and saw that at that point there wasn't a whole lot of development going on, they pulled out; but Smith is still very interested in getting a grocery store in this development. They anticipate beginning work on this project in 2008 and completing it in 2011. As for Square 739 (where the DPW trash transfer station currently resides), it is actually part of the Capper/Carrollsburg redevelopment, and plans are for a 322-unit apartment building with 115 affordable units, and also ground-floor retail. They don't anticipate beginning work on the building for at least another 4 to 5 years. Ms. Cropp did express some concerns about where the DPW vehicles will be relocated to, given the lack of industrial land left in the city.
After lunch was B16-0879, Monument Realty's request for alley closings on Square 701 between Cushing, Half, M, and N (in the block just north of the ballpark) as part of their "Ballpark Phase I" project, which also includes the expansion of the Navy Yard Metro station at Half Street, which Monument is responsible for as part of their purchase of the WMATA land on the southwest corner of Half and M. New news from the hearing is that there will also be a hotel in addition to the previously announced 275,000-sq-ft office building at Half and M and the 350-unit residential building (mix of rental and condo, with up to 20% affordable housing) at Half and N--Monument is working with W Aloft to develop a 200-key boutique hotel on Half Street. The entire project will have 700 parking spaces, and Monument is planning to begin construction in January 2007 so that these three levels of underground parking (as well as perhaps some of the 50,000 sq ft of planned ground floor retail) can be completed by Opening Day 2008; they will then continue work on the upper floors to have the entire project completed in 2009. UPDATE: I should also note that as part of their plans, Monument will be extending Cushing Place approximately 80 feet, so that it will run through to N Street
Finally came B16-0880, another request from Monument Realty, this time for alley closings on the west side of Square 700, just across Half Street from the Phase I project in the previous alley closing hearing. They are still negotiating with WMATA to attempt to purchase the bus depot land on Square 700, but in the meantime are moving forward with a 115,000-sq-ft/100 unit residential project on the northwest corner of Half and N, on the site of the Good N Plenty carryout (whose lease expires today, it was mentioned). This project will have 12,000 sq ft of ground-floor retail, which, given its location directly across from the stadium plaza entrance, will be quite a prime location. Ms. Cropp was concerned that the project will only have two levels/74 spaces of underground parking (you got the feeling that parking is very much on her mind these days!). There was no stated timeframe for this project, except to say "after Square 701." And of course by then they'll have probably secured the bus depot.
For all of these bills, the next step I believe is getting them on the council consent calendar, for votes to be taken.
Is that enough information? Can I stop now? :-)
UPDATE: These hearings are all available via DC Cable 13's on-demand video offerings.
Comments (0)
   
 
 More About staddis

JDLand.com Home

Comments

Sorry, comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

FstSE on Roundup of Some: @king of Arabistan: this is the greystar site currently under construction acros...
king of arabistan on Roundup of Some: So those buildings are planned for the parcel north of DC Water HQ? I guess no m...
bdj on Roundup of Some: It's a connection to Ore 82, I think JD posted about this 6-12 months ago.
202_cyclist on Roundup of Some: FstSE— thank you for posting. It isn’t quite th observation deck at the Willis ...
FstSE on Roundup of Some: Umm.. have we seen this yet? [image]
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O 3RD ST SE   ROBBERY  11/21/20
1200 B/O 1ST ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/19/20
UNIT B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 11/18/20
1000 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/12/20
1100 B/O 2ND PLACE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 11/12/20
1000 B/O 8TH ST SE   THEFT
Theft First Degree (theft From Building)
 11/12/20
1000 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft Of Motor Vehicle Parts Or Accessories)
 11/10/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/05/20
300 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/05/20
900 B/O 4TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/01/20
UNIT B/O I ST SE   THEFT
Theft First Degree (shoplifting)
 10/31/20
900 B/O HALF ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/29/20
300 B/O TINGEY ST SE   ROBBERY
Carjacking
 10/29/20
1300 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/28/20
1000 B/O HALF ST SE   THEFT
Theft First Degree (all Other Larceny)
 10/27/20
300 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/23/20

Recent Issued Building Permits Archive  
1200 1ST ST SE   
11/04/20 
PEPCO / DONNA G GRAHAM
AH2100169 / CONSTRUCTION
WO #16029084 / 02 - 1200 1ST ST SE - PEPCO / WA CHESTER TO REMOVE AND INSTALL CABLES MONDAY THROUGH SATURDAYS FROM 9PM TO 6AM STARTING 11 / 5 / 20 TO 12 / 5 / 20
1018 3RD ST SE   
11/10/20 
DAVID A LEINER / null
E2101357 / SUPPLEMENTAL
1020 3RD ST SE   
10/30/20 
MAYIAK LLC / null
E2101037 / SUPPLEMENTAL
1300 4TH ST SE 1001   
11/03/20 
YAAN REAL ESTATE LP / null
P2100950 / SUPPLEMENTAL
1300 4TH ST SE RU-1   
11/19/20 
AP BOWER RETAIL LLC / null
E2101650 / SUPPLEMENTAL
1057 5TH ST SE   
11/05/20 
PAM HARDER / null
E2101183 / SUPPLEMENTAL
1150 5TH ST SE   
10/28/20 
DISTRICT OF COLUMBIA / null
E2100958 / SUPPLEMENTAL
82 I ST SE   
11/12/20 
STARRY / null
E2101432 / SUPPLEMENTAL
330 K ST SE   
11/09/20 
MINDY J SHAW / CASEY CHARKHABI; NA
B2008664 / CONSTRUCTION
Adding a bathroom on the first floor
   
11/10/20 
JINGSONG XIA / null
P2101107 / SUPPLEMENTAL
100 M ST SE   
10/26/20 
NW 100 M STREET LLC / null
E2100822 / SUPPLEMENTAL
   
11/12/20 
LHREV WASHINGTON M ST LLC / null
P2101170 / SUPPLEMENTAL
   
11/12/20 
SQUARE 743 INC / ;
P2101121 / SUPPLEMENTAL
139 N ST SE   
11/10/20 
BROOKFIELD DEVELOPMENT / JUSTIN BELLOW; BROOKFIELD DEVELOPMENT
B2004436 / CONSTRUCTION
NEW CONSTRUCTION 10-STORY PLUS PENTHOUSE APARTMENT BUILDING WITH 379 UNITS. PROPOSED GROSS FLOOR AREA: 225,000 SF. SH2000028 issued
1275 NEW JERSEY AVE SE   
10/27/20 
BROOKFIELD PROPERTIES / TIM GOOD
AH2100124 / CONSTRUCTION
After hours to conduct work on 1275 New Jersey Ave SE on the upcoming holiday, Veterans Day, November 11th, 2020. Operations would include exterior fa¿ade activities such as: exterior framing, glass and glazing, and brick as well as interior mechanical, electrical and plumbing rough-in activities with access limited to N Street. This permit would not include extended work hours beyond the normal...
   
11/04/20 
USA / null
E2101168 / SUPPLEMENTAL
   
11/09/20 
BROOKFIELD PROPERTIES / TIM GOOD
BP2100588 / POST CARD
125 O ST SE   
10/27/20 
DISTRICT OF COLUMBIA / null
M2100294 / SUPPLEMENTAL
71 POTOMAC AVE SE APT 1208   
11/02/20 
null / NA NA NA
EHOP20957167 / HOME OCCUPATION
71 POTOMAC AVE SE   
11/04/20 
RIVERFRONT HOLDINGS II, LLC / null
M2100380 / SUPPLEMENTAL
   
11/04/20 
RIVERFRONT HOLDINGS II, LLC / null
P2100978 / SUPPLEMENTAL
   
11/09/20 
MRP REALTY / null
E2101319 / SUPPLEMENTAL
227 TINGEY ST SE   
11/18/20 
FC 227 LLC / null
E2101630 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.