Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Sep 01, 2006
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


6 Blog Posts

Monument Realty has added to it's web site an "Upcoming Projects" page, listing "Ballpark District - Phase 1." This is the project on the east side of Half Street between M and N we've been hearing about, but it's nice to see it "confirmed" on their web site. It's described as 275,000 sq ft of office space (which would be at M Street, above the Navy Yard Metro station) and 450 condos (down toward N Street and the stadium). The site says "more details to come by Spring Training 2007." No word yet on the outcome of the bidding for the WMATA land.
 

The Washington Blade reports that Wet and Edge, the nightclubs at Half and L, will be closing on Sept. 23. This is part of the clearing of the tenants on this entire block (Square 699N, bounded by Half, 1st, K, and L), to begin making way for a mixed-use project by Bethesda developer Ron Cohen. It appears all tenants on the block will be out by the end of September (Club 55 is the only other tenant on the block still operating, with rumors a few weeks back that it will be closing Sept. 12). I've been unsuccessful in finding out any more details on what exactly Cohen is planning for the site, beyond what was mentioned when he bought the block for $55 million in Sept. 2005; his company's web site makes no mention of the project (boo!).
 

They haven't been posted on the Naval Historical Center's calendar yet, but I've received the list of lectures, concerts, and other activities being offered at the Navy Yard in September, and have added them to my Neighborhood Events Calendar.
More posts: Navy Yard
 

The latest issue of the bi-weekly Voice of the Hill is now posted on their web site (a big ole' PDF), with a big Voters Guide in advance of the Sept. 12 DC Primary, with question-and-answer tables comparing the stands of the candidates for Mayor, Council Chair, Council-at-Large, and Ward 6 (where Near Southeast is located). There's also on page 36 a nice piece about the history of the Navy Yard, mentioning that the Latrobe Gate at 8th and M is celebrating it's bicentennial this year, with a ceremony on the boards for sometime in mid-September. The Commandant's Office (Building 1) was rededicated in August after it's renovation.
More posts: Navy Yard
 

No news yet on the fate of the Herb Miller/Garages Wrapped With Development Goodness plan to solve the issue of parking at the new baseball stadium (despite the Sept. 1 date when the financing was supposed to be in place having now arrived), but the Post editorial page weighs in on the lonely plight of CEO Gandhi trying to make sure that the DC taxpayers' interests don't strike out.
 

The agenda for the September ANC 6D meeting has been released; items of Near Southeast interest include a vote on the request for alley closings on the east side of Square 701 and also a presentation on changes in the Florida Rock PUD in advance of it's Sept. 18 zoning hearing. (Perhaps the Square 737/739 alley closing will get added to the agenda as well, it was supposed to be referred back to the full commission from the Development Committee for this meeting.) The meeting is on Sept. 11 at 7 pm at 65 I Street SW.
 




                  © Copyright 2026 JD.