Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Square 696 Residential
See JDLand's Square 696 Residential Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


37 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4

I didn't really intend to go completely off-grid for a long weekend, but a road trip to and from north Florida didn't leave me much time or energy for blogging. What did I miss?
* I assume everyone's heard by now that Bruce Springsteen will be playing at Nats Park on Sept. 14. Tickets go on sale on Friday, April 27 at 10 am at tickets.com. (If I'm not showing appropriate enthusiasm, I apologize, but Springsteen just hasn't ever really done it for me. I think I was permanently scarred by everyone around me going so crazy for him when I was in college, during the whole Born in the USA era. I just hid in my room and listened to R.E.M., and U2, and the Smiths, and Squeeze, and Elvis Costello, and....)
* The Nats' current homestand continues for the rest of the week, with tonight being the first $2 Ticket Tuesday of the season. Then there's Neighborhood Night on Thursday, April 19, followed by the season's first Pups in the Park game at 1:05 pm Saturday, April 21, and Kids Opening Day at 1:35 pm Sunday, April 22.
* If you're not availing yourself of tonight's $2 Ticket Tuesday, perhaps you might want to check out the Capitol Hill Chamber of Commerce's session on real estate development in and around Capitol Hill, which will be focusing on the areas east of South Capitol and south of East Capitol, which includes Near Southeast. Tommy Wells is scheduled to be part of the lineup. It's from 7 to 9 pm at the Meader Theater (NCC's new home) at 535 8th St., SE.
* Saturday, April 21 is Lantern Making Family Day at the Yards Park, as part of the lineup of events as the Cherry Blossom Festival comes to a close. There are two sessions, at 10 am and noon, followed by a parade/procession through the park.
* It's a bit outside my boundaries, but residents and others may be interested to know that the new Anacostia Riverwalk Trail Bridge crossing the railroad tracks just north of Pennsylvania Avenue will be opening on April 24.
And, some non-event tidbits:
* Square 696, the block bounded by I, K, Half, and First owned by DRI and Jamestown and originally branded as "The Plaza on K," is apparently being relaunched as "Congressional Square," though that doesn't seem to have filtered down to any web sites just yet. It's still an 825,000-square-foot office and retail project.
* On Opening Day, I noticed a lot of cars parked in the fenced-off lot on the southeast corner of 1st and M SE that belongs to the former National Geospatial Intelligence Agency building. I asked Forest City about it, and they said that they will offer parking in that lot for certain games where big crowds are expected, but aren't planning to make it available for daily use.
* In the 700 block of Virginia Avenue, the Miles Glass building and the auto repair shop next door are no more, but at least they are now permanently enshrined as entries #168 and #169 in the Demolished Buildings Gallery. A parking lot is expected to be built for temporary use, while the National Community Church works on its plans for a larger events space on the site.
 

If you see some work being done on the block bounded by 1st, K, L, and Half in the next couple of days, don't get all excited that construction might be starting on the Plaza on K project. DRI--who bought the block for $69.4 million in 2007--tell me that they are going to be doing some leveling work to get rid of the eight-foot hill in the middle of the lot, to make it show a little nicer for prospective tenants who might be looking at the site. There will also be new fences put up.
Plans for the site currently call for buildings totaling approximately 825,000 square feet of LEED Gold office and retail. The first phase would be 300,000-sq-ft 88 K, along with 77 I, a "headquarters" space that could provide either 125,000 or 250,000 sq ft of space. There are also plans for a 10,000-sq-ft public plaza, surrounded by 14,000 sq ft of retail, along with another building (50 K) in a later phase. You can see my project page for more details, or visit the official web site. There's no timeline at this point for when the project might get underway.
Comments (0)
More posts: Square 696 Residential
 

Late night items:
* Here is the map from Wednesday's performance parking meeting, showing where the $288,000 in "non-automobile" improvements are going to be spent.
* I received a message today from Potomac Parking, the company that will be running the new surface parking lot on Half Street between I and K (the eventual home of the Plaza on K). They tell me that, once they get their lot finished and permits secured, it will be a 24-hour lot, available for monthly/daily/hourly/gameday parking, which might make it a possibility for residents looking for a place to park where they won't get a ticket and where the space (presumably) won't cost $40,000. Judging from the web site, it looks like it'll be an unmanned lot, with various technologies to handle payments. More information when I get it.
Comments (0)
More posts: parking, Square 696 Residential
 

Still knee-deep in inauguration craziness in real life, so can't devote much time to Hood things these days. Here's some quick bullet items, which at least I've managed to Twitter over the past few days so that I'm not completely shirking my responsibilities. (Don't forget that these Tweets get displayed at the upper right of the JDLand home page, if you just want to check them every so often.)
* I've received some swell new renderings of the Plaza on K office/retail project at First and K. The official web site also now has a whole lot of detailed information as well. Transwestern announced last week that they have officially begun marketing the project, and that the two buildings along First Street--88 K and 77 I--would make up the first phase. There's also a 10,000-square-foot public plaza at First and K that would be surrounded by ground-floor retail. It also is "designed to LEED Gold standards." See the above links for additional details. No timeline for the start of the first phase--I'm guessing they're not building on spec in this environment.
* The final Connect Barracks Row report has been posted; this was the study by University of Maryland students on how to reconfigure the southern end of Eighth Street below the freeway to better connect it with its neighbors to the north.
* I mentioned the other day that none of the *hundreds* of Near Southeast bars would be taking advantage of the special Inauguration extended hours, but I was incorrect. A lot of people (like me!) probably don't know that the "Bachelor's Mill/Back Door Pub" at 1104 Eighth Street SE in the block north of the Navy Yard even exists (even though their web site lists it as "The District's oldest and largest entertainment complex exclusively dedicated to the gay and lesbian communities"), but they're on the list of approved late-hours venues.
* A resident reports that last two little buildings standing on the 1345 South Capitol footprint have been demolished in the past few days. But no word on whether this means Camden is starting to move forward on this apartment project.
* I failed again, and couldn't make the ANC 6B meeting on Tuesday night. But I'm hoping that the update on the South Capitol Street Final EIS--my main reason for going--will be done for ANC 6D next month.
* Every year I've celebrated on January 20 the anniversary of my starting to track the goings-on in Near Southeast (Jan. 20, 2003 was the first day I went out to take photos, which I then posted on my web site). The past few years I've marked it by posting my annual State of the Hood roundup. However, this year, given that the lead-up to January 20 is going to be just a touch busy, I'm guessing I'll miss my self-imposed deadline by a few days. Waaah!
Comments (0)
More posts: ANC News, 8th Street, inauguration09, Square 696 Residential
 

Before the storm clouds arrived yesterday (literally and figuratively), I got out and took an incomplete smattering of pictures along Second, New Jersey, First, Cushing, and Half. (Use those links to see all the before-and-nows of these latest shots.) These new photos are mainly of 909 New Jersey, Velocity, 55 M, the empty skyline where 1015 Half is just about to reach ground level, and the final "after" photos from the demolition of the Merritt Cab building at First and K on Square 696. The sun disappeared before I could get over to Capitol Quarter, so new photos from there will have to wait a few days, and since the afternoon remained cloudy (and busy), I didn't take an afternoon batch (i.e., no photos looking east).
And, if you haven't wandered through them for a while, the gallery of my favorite before-and-afters is a striking walk through the past few years, as the memories of the old Near Southeast start to get just a wee bit hazy.
Comments (0)
More posts: 1015 Half, 909 New Jersey, jpi, Square 696 Residential, square 697, Square 699n, Velocity Condos
 

* As I mentioned below, the garage that housed both the Merritt and Four Star cab companies started getting brought down today. They didn't get it all on Thursday, but I imagine by sundown Friday the rest will be gone. (See pictures from midmorning, though it's hard to see much in the way of a difference from First and K, since they took out the back of the building and only a smidgen of the K Street facade.)
* Only a few hours after I said that Capitol Quarter framing would start "in the next few days," lumber went up on the first house on the south side of L east of Fourth. (No pictures yet--this weekend!)
* Sometime this week the crane was put up at 1015 Half Street, so we should be seeing vertical construction before too long.
* Building permits for the external renovations to 900 M Street are now winding their way through the bureaucracy. No word yet on any retail tenants.
Comments (0)
More posts: 1015 Half, 900m, Capper, Capitol Quarter, Retail, Square 696 Residential, square 697
 

With thanks to reader J. for the tip, I can report that the cab garage on the northwest corner of First and K is getting demolished today. This is where the DRI/Transwestern Plaza on K may be getting underway this fall. (I'm posting this from my cell, so links will have to wait 'til later.) UPDATED with a link and a tiny before and after photos above. I've also added it as #153 in the Demolished Buildings gallery.
Comments (0)
More posts: 225 Virginia/Old Post Plant/200 I, Square 696 Residential
 

During two looooong photo treks today I found a new fence draping on First Street between I and K, advertising the three-building office-and-retail project on Square 696, now dubbed The Plaza on K. It indicates, as I was gleaning a few weeks ago, that DRI/Transwestern are indeed planning to move forward with 88 K, the first phase of the project, later this year, with delivery in mid-2010. There's now an official ThePlazaonK.com web site, for those of you looking to lease office or retail space.
Thankfully the nice sunny day allowed me to snag really good photos of the two renderings on the fence sign, which are shown above but which you can see in non-micro version on my Plaza on K page (scroll down a tad to see them--you have to be looking pretty close to realize they're not digital files). Both renderings show the planned 8,000-sq-ft public plaza on K Street just west of First Street. The project page also has lots of photos showing how much Square 696's "neighbors" have changed in the past few years.
Now we're just waiting to see when the old cab garage at First and K gets demolished....
(And--lots more photo updates coming over the next few days, so keep checking back.)
Comments (0)
More posts: Retail, Square 696 Residential
 

A raze permit has been filed for the now-vacant white one-story garage on the northwest corner of First and K, where DRI Development is planning to build the first phase of its three-building 825,000-sq-ft Square 696 office/retail project, a 300,000-sq-ft building that is expected to begin construction later this year. This garage was, until the end of February, home to both Four Star Cab and Merritt Cab, both of which relocated when their leases expired.
A peek into CoStar (link may not work right, and CoStar doesn't allow direct links to listings for plebes like me) shows lease listings for both 50 K Street and 90 K Street, each also labeled "The Plaza on K," which I imagine also is referencing the 8,000-sq-ft public plaza planned for K Street at First Street. 90 K appears to be the first building planned for the site, listed at 300,000 total square feet and 12 stories, with a "year built" date of 2010. Its sibling 50 K is listed at 285,000 sq ft and 12 stories, with no "built" date (though both listings have an April 2010 occupancy date in their detail pages). See my Square 696 page for a rendering of the project, plus a site map and photos of the block in its current incarnation.
Comments (0)
More posts: Square 696 Residential
 

The sunlight wasn't fabulous when I ventured out yesterday, but I still took a pretty complete set of photos along First Street between I and N. With 909 New Jersey now peeking up above ground level, and Velocity racing upwards, the skyline is morphing yet again. And of course work continues on Onyx and 100 M (both due to be completed this summer). As I've mentioned a few times lately, the streetscape improvements to First Street have made the stretch from I Street southward pretty much unrecognizable from what it was a year or so ago (or even three months ago).
While you can look at the complete set of photos I took yesterday, I'd suggest taking a little extra time and looking at these new shots by intersection, where you can see the photos paired with their "befores": check out First and I, First and K, First and L, First and M, and First and N (above); and there's also some updates at Half and N by the ballpark Center Field Gate and New Jersey and I thrown in as well. Click on the See All Photos of This Angle wherever you see it to see the photos between the Before and the After (or, more precisely, the "During").
Soon I'll post some additional photos from yesterday of portions of The Yards, which is now more accessible thanks to the new parking lots. And if the sun ever comes out again, I'll venture along Half Street and other locations that need updating.
Comments (0)
More posts: 100 M, 909 New Jersey, jpi, Onyx, Square 743N, Square 696 Residential, Square 699n, Velocity Condos
 
37 Posts:
Go to Page: 1 | 2 | 3 | 4