Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Sep 06, 2012
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

Construction continues at the Boilermaker Shops, the World War I industrial building at the Yards that Forest City is adapting into a retail and office space. And today I was able to see the interior for the first time since 2007, with camera in hand, of course.
None of the tenant spaces are looking like their final versions yet, but it's still cool to check out the bones before the spaces really get going with their installations. Though I sure wish it hadn't been pouring rain, to get a better sense of how much more natural light will come into these spaces when the sun is out. Next time....
The photo gallery shows the spaces where Bluejacket Brewery (above), Buzz Bakery, Willie's Brew and Que (below left), Huey's 24-7 Diner, and Wells Dry Cleaners will be, along with the office space being built out on a new second floor that runs along much of the interior of the building (below right) and some of the as-yet unleased sections.
The photos you see here are just a smattering, so be sure to check out the whole gallery.
It's too bad that the mondo-cool Shaw 15 Ton Crane left from the building's original incarnation is up in the office space, rather than somewhere in the public areas, but hopefully the office workers will take good care of it.
There are no official opening dates for any of the tenants, though it sounds like the dry cleaners will be the first to open (yay...?). Bluejacket has previously announced they are shooting for an early 2013 opening.
For additional information, including lots of (not especially new) photos of the exterior from when the sun is actually out, see my Boilermaker Shops project page.
I also tossed in a photo of the hole in the ground where Twelve12 4th will be sprouting, to be home to apartments and Harris Teeter. I was told that they've dug as deep as they're going to go, and pile work is next on the agenda.
UPDATE: Also, I was going to grouse about why I don't take photos when the weather is bad by pointing to this batch I shot along L Street catching the homestretch progress at Capitol Quarter, but strangely enough most of the "before" shots aren't exactly under bright blue skies. Juggling a camera and an umbrella is not my cup of tea, though.
 




                  © Copyright 2026 JD.