|
| ||||||||||||||||||||





icon. Some highlights (click through to the pages for more details on each project):
* I posted a fair number of photos (plus some new renderings) of the Foundry Lofts at Third and Tingey, where the new top two floors are starting to be framed. You can also see how the a portion of the new Water Street just south of the Foundry has been paved, and curbs have been installed; ditto with the new portion of Third Street that will run alongside the building down to the park.
* I made my first close-up visit to the Factory 202 building at Fifth and M (the old Gun Assembly Building), and got a few new images like the one at right. (Look for the "Pistol Range" photo for added entertainment.) This building is expected to be condos, delivering in 2011.
* I added a lot of new images to the Later Phases page, where you can see a good close-up of the little Building 74 next to Factory 202, which will eventually be townhouses. You'll also see more of the infrastructure work going on, including curb cuts already in place at Fourth and Tingey (even though the southern part of Fourth doesn't exist there yet). There's also a new red brick wall going in along the boundary with the Navy Yard, where a new block of Fifth Street will be built.
icon to see other photos from the past few years from the same location.|
Comments (0)
|
|
Comments (0)
More posts:
|


























