Since January, 2003
            
 Sliding from Before to After

First, summer was hot, then it was really hot, then the Nationals were hot, then the Nationals were REALLY hot, and suddenly it's November and the JDLand camera has been crying out from neglect. But I took care of that this weekend (oh boy, did I), and wanted to catch up on the latest downward digging and upward construction.
Let's start by peeking through some fences to look at the digging portion, where excavation is now underway at New Jersey/Canal and N/Tingey on the first office building to come to the Yards, which will be the headquarters for Chemonics International. (Yes, it's the project that chased the Trapeze School down to 5th Street.) The other two digging locations are Lerner's residential building at 1000 South Capitol and the CSX East site on New Jersey Avenue just south of the freeway, where a hotel and 800 units of residential will be coming. In order:
Next, we have three buildings that are above ground but not yet topped out. We'll start with the reconstruction of the Capper Seniors building at 5th and Virginia, which started just a smidge more than one year after the fire. With the pad not needing to be redone and the concrete-encased stairwells still standing, it isn't taking long for the wood-based construction to look familiar. (It is an odd thing to be watching the same building go up twice, 14 years apart--the first photo below was taken on Nov. 28, 2005, then after the fire in Sept. 2018 and March 2019, and now ).
The other skeletons are the new headquarters of the District Department of Transportation at 3rd and M Streets, which at this time of year can only been seen in sunlight for about one hour, from the west.. A few blocks away, on L Street between South Capitol and Half, the neighborhood's first "sliver" residential building (condos!) at 37 L is now a few floors away from its roof.
Beyond that we have a mere, oh, 12 additional projects that are topped out but not finished. Three of them are getting their faces put on (DC Crossing, Meridian on First, and One Hill South Two):
The rest have long since stopped looking particularly different while they plod toward completion, but there are updated photos on their project pages if you wish to see some. And yes, I'm looking at you, Thompson hotel and Estate apartments, Parc Riverside Phase 2, NAB HQ, Avidian, The Kelvin, Envy, the Garrett, and the Maren.
Now I'll turn my attention finally getting caught up on sliders. Wheeeee!
Comments (9)
   
 
 More About Development News

JDLand.com Home

Comments

202_cyclist says: (11/8/19 10:03 AM)
Thank you for the update. Construction has also started at 716 L Street, the residential development next to the Brig.


GaryRKarr says: (11/8/19 12:54 PM)
Meanwhile, ESPN's Bradford Doolittle writes that during the playoffs he "Iwent to Washington, D.C., where a sterile new urbanist neighborhood is sprouting up around Nationals Park like an invasive species." (Not sure how he knows about the fertility of so many here.) link


202_cyclist says: (11/8/19 1:49 PM)
We can have an honest debate about some of the architecture in the neighborhood but does Mr. Doolittle prefer vacant lots and warehouses instead? If it is a sterile neighborhood, why are their many visitors every single day, including the days when there are no Nats games, going to the many restaurants in the neighborhood and our two great parks?


dcgent says: (11/8/19 2:18 PM)
And another restaurant is on the way, per Tom Sietsema of the Post--FOOD FLASH: The co-executive chefs at one of Washington’s most sought-after reservations tell me they’re parting ways with the restaurant they helped open two years ago. Which is another way of announcing that Gerald Addison and Chris Morgan are leaving their live fire show at Maydan on Nov. 19.


“It’s bittersweet,” says Addison. “There’s no good time to leave a restaurant,” says Morgan. “Our love for Middle Eastern food will never change.” But even before they partnered with Rose Previte to create Maydan, the chefs knew they wanted to eventually open a place of their own, and now that they have a location in the Navy Yard, the time seems right.


Both 31, the chefs can’t go into a lot of details just now. But their next act, under 100 seats, will be “completely different,” says Morgan. So no live fire. “Not every restaurant can do that.”



Clue No. 1: Their next restaurant will be "something the city doesn't have," says Morgan. Clue No. 2: The food will be something they’ve never done before in a professional setting but have experimented with on their own, adds Addison.


The forthcoming restaurant is expected to launch next spring and find the two chefs working side by side, like now, but more involved in business matters and service steps than they are now.


bdj says: (11/8/19 5:47 PM)
Now that is exciting!! Love when big name chefs come to the neighborhood.


RMP says: (11/9/19 8:39 PM)
Petalpalooza 2020 coming to the neighborhood. link


ValveetaChz says: (11/10/19 8:15 AM)
I just heard on the news that El Tamarindo is coming to the neighborhood near Nationals Park. Please let this be true. I love their pupusas!!!


Brett M says: (11/12/19 3:53 PM)
It's disappointing to see the new Capper Seniors Center being reconstructed with the wood frame. Hopefully this time they'll maintain the fire alarm system in working order.


conngs0 says: (11/13/19 6:06 PM)
Brett M, I echo your disappointment on the structure of the new Capper Senior Center, but if essentially rebuilding the same building is necessary to get residents back sooner, then so be it. I agree the key is the maintenance of the building. Obviously hiring a competent management company would be a good start (wouldn't it be a kick in the teeth if Edgewood is brought back?). But really the responsibility rests on DCHA to hold accountable whatever management company it hires and also enforce its own rules regarding access to its facilities. I'm hopeful but not terribly optimistic.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

RMP on Super Tuesday Tidbits: The Willow space is cleared out :(
MarkinDC on Super Tuesday Tidbits: This article has some great info for helping out our neighborhood restaurants an...
CJBabyDaddy on Super Tuesday Tidbits: @RMP: I’m stacking up gift cards so I can celebrate by binging at a couple of m...
AGH on Super Tuesday Tidbits: Just got notice that the new retail on N street will be: Kilwins (Chocolate, Fud...
Jscott280 on Super Tuesday Tidbits: Kilwins(ice cream), chicken + whiskey and taphouse 99 coming to N street.
RMP on Super Tuesday Tidbits: Does anyone else feel like they are spending more money on restaurants right now...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/23/20
1500 B/O SOUTH CAPITOL ST SE   THEFT
Shoplifting
 03/11/20
200 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/09/20
1000 B/O 1ST ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 03/08/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 03/06/20
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 03/05/20
1200 B/O 1ST ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/01/20
1100 B/O 1ST ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/27/20

Recent Issued Building Permits Archive  
1300 4TH ST SE 1001   
03/16/20 
LA FAMOSA LLC / null
P2004796 / SUPPLEMENTAL
   
03/20/20 
LA FAMOSA LLC / null
E2005975 / SUPPLEMENTAL
1300 4TH ST SE 1006   
03/16/20 
LA FAMOSA LLC / null
M2001859 / SUPPLEMENTAL
1300 4TH ST SE RU-1   
03/04/20 
AP BOWER RETAIL LLC / DAVID T FONTANA; BACON CONSTRUCTION COMPANY BACON CONSTRUCTION COM
TL2000065 / CONSTRUCTION
First time tenant layout on 1,196 SF of 1st floor retail shell for restaurant, Jeni Ice Cream, with 10 seats
   
03/06/20 
AP BOWER RETAIL LLC / null
E2005415 / SUPPLEMENTAL
   
03/11/20 
AP BOWER RETAIL LLC / DOMINIC E TOTARO; DOMINIC E TOTARO
M2001793 / SUPPLEMENTAL
1300 4TH ST SE   
03/13/20 
LA FAMOSA LLC / KIMOY LALLEMENT; POTOMAC CONSTRUCTION SERVICES
TL2000028 / CONSTRUCTION
New tenant layout for commercial kitchen, two restrooms, point of sale bar, and dining seating, new lighting and mechanical zones. 2,338 sf INDOOR OCCUPANCY: 84 PERSONS WITH 59 SEATS OUTDOOR OCCUPANCY: 38 PERSONS WITH 38 SEATS TOTAL MAX OCCUPANCY: 122
900 5TH ST SE   
03/03/20 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / CHRISTOPHER LAKATOSH; CHRISTOPHER LAKATOSH
E2005256 / SUPPLEMENTAL
   
03/24/20 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KAYLA TRICE; DELAWARE
EN2001608 / SHOP DRAWING
Install 3 new hydraulic passenger elevators
2 I ST SE   
03/09/20 
CRESCENT CAPITOL VIEW MF LLC / BOB BIROONAK; BOB BIROONAK; BOB BIROONAK
SG2000223 / CONSTRUCTION
one non illuminated sign
200 I ST SE   
03/17/20 
DISTRICT OF COLUMBIA / LEIA TERRELL
B2006382 / CONSTRUCTION
Tenant Alterations of existing office doors and wall. Including relocation of existing electrical, and mechanical terminals. NO CHANGE OF EGRESS, USE OF OCCUPANCY, NO EXTERIOR LAND DISTURBANCE, NO BASE BUILDING STRUCTURAL WORK.
139 N ST SE   
03/16/20 
PARCEL I FC ROWAN / MIGUEL RIOS; GRIFFIN DEWATERING, LLC
SB2000152 / CONSTRUCTION
Type of proposed System: Deep well dewatering system consisting of 16 wells around the perimeter of the shored excavation and 2 wells within the excavation in a mutually agreed layout. • Installation Method: Wells will be drilled up to 70’ deep, utilizing Griffin’s hollow stem auger drilling rig to drill up to a 10.25” I.D. borehole. Deep wells come complete with screen, casing, riser pipe and a s...
861 NEW JERSEY AVE SE   
03/03/20 
809-853 NEW JERSEY AVENUE ACQUISITION LLC / ERICKA CLARK
AH2000987 / CONSTRUCTION
Tower crane erection must be performed in 1 day due to weather constraints. All work performed onsite. Noise reduction procedure in place.
1275 NEW JERSEY AVE SE   
03/06/20 
MILLER AND LONG / WILLIAM MOORE
AH2001001 / CONSTRUCTION
After hours to pour concrete with pump truck saturday 3 / 7 and sunday 3 / 8 from 9PM-4AM.
1299 NEW JERSEY AVE SE   
03/13/20 
FOREST CITY SEFC LLC / SARAH J. NAPIER
BCIV2000067 / CONSTRUCTION
Revisions to BCIV1800153. This submission is for approval stamps only. No change in work.
71 POTOMAC AVE SE   
03/27/20 
MRP RESIDENTIAL / KAYLA SHATTUCK; KAYLA SHATTUCK; PARADIGM CONTRACTORS LLC
BCIV2000036 / CONSTRUCTION
This permit is for site civil work at 71 Potomac Avenue SE including stormwater management and erosion & sediment control. See plans for more details.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.