Since January, 2003
            
 Sliding from Before to After

A few items of note I've come across while catching up with recently filed building permit applications:
* CHURCH OF THE BLUE CASTLE: It's been four years since the National Community Church purchased the Navy Yard Car Barn, aka the "Blue Castle," at 8th and M, and with all tenant leases now expired, an interior building permit application has been filed for creating a "worship space" for the church, along with support spaces "such as green rooms, production studio, and a kids room." Back in September, Capitol Hill Corner reported that these Phase I plans are for a 900-plus seat auditorium "which will be used for Sunday church services but will be available for rent to the community during days and nights." And, to answer the inevitable question, when I interviewed Mark Batterson about the purchase of the building, he said that he hopes "that someday the Blue Castle will just be the Castle."

* CHURCH OF THE A-1 TIRES: While developers have been trying to pitch a sliver of a residential building on the northeast corner of 1st and K since the lot changed hands in 2017, the only current movement at the site is an apparent plan to renovate the former A-1 Tires garage for a church assembly space, including a new roof and windows. Is perhaps the Waterfront Church looking to move from their Capitol Hill Tower space? We Shall See. UPDATE: I've been told that this is an expansion by the Waterfront Church, not a move.

* HARNESSING THE SUN MONSTER: If you've seen some construction activities on top of the Nats Park garages along N Street, it is the installation of "solar canopies" containing 4080 modules. (The only question remaining is, will the Sun Monster's number one victim be back this season to see these new additions?)

* WALLS COME TUMBLIN' DOWN?: After the Lerner Companies initially received approval to take the roof off of the old warehouse at 49 L but keep the lower 4 feet of brick walls, there is now a request to revise that permit to remove the wall completely "due to failing structural integrity," and to replace it with a new 8-foot chain link fence. There have been no development plans announced for this site, but one wonders if the Lerners might be thinking about some temporary parking options if indeed their 1000 South Capitol residential building is soon to get underway, which would necessitate the closure/move of Nats Parking Lot K.
Comments (6)
   
 
 More About Development News

JDLand.com Home

Comments

JD says: (1/5/19 11:00 PM)
You people could have told me that 49 L was basically already gone!



bdj says: (1/5/19 11:16 PM)
They started tearing it down like 2 months ago.


JD says: (1/5/19 11:22 PM)
I've been busy.


JD says: (1/5/19 11:24 PM)
Plus, I'm now finding out that I missed three Capper buildings in the Demolished Buildings gallery that were demolished in January 2005, which means I need to renumber, oh, 150 entries. (49 L is now #176. Or, I guess, #181, since I found other numbering boo-boos.)


jdc says: (1/7/19 9:34 AM)
I think the warehouse reached the state shown in the above photo about 3 weeks ago. Regarding the permit, I cannot understand why they just did not ask for a full raze from the beginning. It's not like 4 feet of brick walls is that attractive vs a chain fence. I guess it would have saved a bit of money...


jdc says: (1/7/19 9:35 AM)
Oh, and regarding A-1 location, I cannot imagine how much work would be needed for such a renovation. I'd think the environmental remediation alone would be rather expensive if this is just going to be a short-term church.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

CJBabyDaddy on Roundup of Some: @WestNorth: Methinks the proposed land swap involves/involved Navy Yard waterfr...
conngs0 on Roundup of Some: Cool news about the museum. It'll be interesting to see how it progresses from ...
Westnorth on Roundup of Some: Navy Museum is fundraising for a $450M new spot outside the Navy Yard gates, for...
VelocityChris on Roundup of Some: They're adding two floors to the top of the WeWork building.
GarfieldPark on Roundup of Some: Anyone know what is happening on First st outside of WeWork bldg? They are doing...
right-toe on Roundup of Some: Lots of little changes around: Sidewalk has opened up around the DDOT building,... [image]
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O HALF ST SE   ROBBERY  10/21/20
UNIT B/O K ST SE   THEFT
Theft First Degree (all Other Larceny)
 10/20/20
900 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/15/20
600 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/13/20
UNIT B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/12/20
1000 B/O 1ST ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/12/20
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/09/20
1000 B/O 8TH ST SE   ROBBERY
Armed Carjacking
 10/09/20
400 B/O M ST SE   THEFT
Theft 2nd Degree - Felony (theft From Building)
 10/07/20
900 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/01/20
1000 B/O 3RD ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/30/20
UNIT B/O K ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/29/20
1100 B/O 2ND PLACE SE   ROBBERY
Assault W/i To Commit Robbery (simple Assault)
 09/28/20
1000 B/O 4TH ST SE   ROBBERY
Carjacking
 09/26/20
1200 B/O HALF ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/22/20
600 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/21/20

Recent Issued Building Permits Archive  
1108 3RD ST SE   
10/06/20 
JULIANA DUFFY / null
E2100156 / SUPPLEMENTAL
915 5TH ST SE   
10/14/20 
RYAN DANIELS / FERNANDO A ANGULO; RYAN DANIELS
B2012669 / CONSTRUCTION
Partial floor joists replacement on first floor. replace 6 feet height wooden fence and gate. add protective coating to partial foundation wall.
1031 5TH ST SE   
09/30/20 
CLARICE GEE / null
P2009304 / SUPPLEMENTAL
150 I ST SE   
10/09/20 
SQUARE 737 LLC / JASON D DORRIS
AH2100047 / CONSTRUCTION
Construction of a new 13 story apartment building with three below grade parking levels, 1st floor retail and amenity areas; 373 units and 181 parking spaces. To include mechanical, electrical, plumbing, elevators and structural work.
   
10/15/20 
SQUARE 737 LLC / BOB BIROONAK; BOB BIROONAK
SG2000458 / CONSTRUCTION
one directional double face non illuminated sign
100 M ST SE   
09/25/20 
LHREV WASHINGTON M STREET LLC / THUY LE; NA
B2010745 / CONSTRUCTION
Suite 950 - Interior alteration. Work is to include minor change in MEP and Fire. No Structure.
139 N ST SE   
10/08/20 
null
SH2000028-EXT-1 / CONSTRUCTION
Original Permit expires 4 / 15 / 2021, 1st extension expires 10 / 15 / 2021
861 NEW JERSEY AVE SE   
10/13/20 
CXS TRANSPORTATION INC / null
P2100338 / SUPPLEMENTAL
125 O ST SE   
10/02/20 
DISTRICT OF COLUMBIA / null
M2100033 / SUPPLEMENTAL
71 POTOMAC AVE SE   
10/15/20 
RIVERFRONT HOLDINGS II, LLC / OLUSOLA PYNE
B2100519 / CONSTRUCTION
Shipping Container placement on lot for exterior use.
227 TINGEY ST SE   
09/30/20 
FC 227, LLC / BRIAN QUINN
B2011139 / CONSTRUCTION
Conversion of apartment unit to model unit.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.