Since January, 2003
            
 Page Through from Before to After

In the midst of the big push on to try to get open in time for July's MLB All-Star Game, a hard-hat was slapped on my head and I got a quick looksee at the huge space that will become Mission at Navy Yard, the Mexican restaurant coming to the northeast corner of Van and N in the 1221 Van apartment building.
While it does not yet quite look like the rendering, the huge space that will be the first restaurant on N Street SE immediately across from Nats Park (or, more accurately, one of the garages) is certainly taking shape. If you look closely at the rendering, you can see that Mission will occupy the corner space on both the first and second floor, but the bulk of the restaurant--including what it is heralding as DC's largest bar--runs the length of the second story, from Van to South Capitol.
There are actually four separate bar areas, plus outdoor seating on two floors, a private event space, and lots of the large roll-up garage-type windows to bring the outdoors in.
Owner Fritz Brogan told me that there will be happy hours seven days a week, and that while of course the hope is to make Mission a destination for the huge ballpark crowds that descend 81-plus times a year, the restaurant is also planning to cater to residents during the days and nights when Nats Park is dormant.
As to whether they will actually make it across the finish line by All-Star time, We Shall See, but one way or the other, I imagine that there will be considerable excitement for Mission's opening, whenever it is.
Here are some photos, showing the second-floor space and That Bar, plus a few positioning shots to give a feel for where the restaurant is/will be, in case you aren't envisioning it.
As an aside, if you had told me in March 2008 that it would be July 2018 before any sort of retail opened on N Street, I would have called you mad. Mad!! But delayed is not denied.
Comments (13)
   
 
 More About Restaurants/Nightlife

JDLand.com Home

Comments

202_cyclist says: (6/12/18 1:53 PM)
Thank you for the update. I’m looking forward to the Mission.

Related to this, what is the status of the JD Land happy hr?


Chaifetz10 says: (6/12/18 4:32 PM)
My wife and I moved back to the Midwest last April, but I'll be returning to Navy Yard for the All Star Game and All Star Week. It's just crazy to see some of these places almost completed and/or rising from what we remember to be empty lots or giant holes.

Thank you for the updates! We certainly miss DC (but not the cost of living!)


dude says: (6/13/18 8:24 AM)
I hope it's good food.


jdc says: (6/13/18 8:27 AM)
They are installing the new paver sidewalk outside the Metro entrance on half Street. It is continuing the pattern that already exists along M Street.


RMP says: (6/13/18 9:06 AM)
I don't understand enough about the restaurant buildout / permitting process, but given what I've seen elsewhere, it seems impossible to think they will make it by the ASG. I hope they prove me wrong, but when Chloe, for example, was at this point it was many months more before they finally opened.

Also what happened to Schilling Canning? They haven't even started buildout yet so they're going to miss the entire summer season.


202_cyclist says: (6/13/18 10:40 AM)
I'm just glad it is any team but the Phillies on the rendering of the Mission.


conngs0 says: (6/13/18 3:44 PM)
RMP, I share your skepticism on the prospect of Mission opening in time for the All-Star Game. One of the few restaurants (perhaps the only one?) that followed through on a fairly ambitious timetable, however, was Gordon Biersch. Perhaps there's a chance that Mission, which is also more of a pre-packaged product unlike some of the other establishments in the neighborhood, has a shot at making the All-Star Game. If not, I'll look forward to trying it later in the summer!


sameter says: (6/14/18 9:45 AM)
opening the restaurant is going to be based solely off of capital, getting permits on time, and passing inspection. you could make it happen, but at a cost, and depending how deep their pockets are, its possible. but opening a new restaurant on all star weekend seems like suicide dooming it to poor execution during peoples first impressions. training new staff and such in face of such adversity would be very difficult.


JD says: (6/14/18 9:47 AM)
I imagine they'd be heavily staffed with veterans from the other Mission.

I think permits are the real question mark, not the actually getting the work done. As @sameter says, that just takes money.


geneticlyperfct says: (6/14/18 12:11 PM)
FWIW: Mission Navy Yard applied for a permit to stay open early for World Cup games (June 14 - July 15): link


RMP says: (6/14/18 12:54 PM)
Wait, why is Chloe on the World Cup permit list? Do they even have a TV? Of all the places in the neighborhood I never would have imagined Chloe would be the one on the list.


Westnorth says: (6/15/18 2:46 PM)
I hope Brogan isn't related to infamous Elon Musk hanger-on Brogan BamBrogan; if so, construction will continue indefinitely...


202_cyclist says: (6/17/18 9:03 AM)
FOUND: keys for a Mini Cooper.

My wife and I found a pair of keys this morning for Mini Cooper at the corner of 5th and G St, SE. If you can identify them, I will be glad to return them.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

CJBabyDaddy on Roundup of Some: @king of arabistan: Keep movie theater hope alive!
Jscott280 on Roundup of Some: Wow - that is very impressive!!
dcgent on Roundup of Some: Plans for large surface parking lot left on Buzzard point announced https://dc....
bdj on Roundup of Some: has Basebowl the other night and it was delicious. Great addition to the neighbo...
FstSE on Roundup of Some: @king of Arabistan: this is the greystar site currently under construction acros...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1100 B/O NEW JERSEY AVE SE   BURGLARY
Burglary Two
 11/26/20
UNIT B/O M ST SE   ROBBERY  11/25/20
1000 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/24/20
UNIT B/O I ST SE   ROBBERY
Carjacking
 11/23/20
200 B/O M ST SE   ASSAULT WITH A DANGEROUS WEAPON  11/22/20
UNIT B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/22/20
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/22/20
1000 B/O 3RD ST SE   ROBBERY  11/21/20
1200 B/O 1ST ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/19/20
UNIT B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 11/18/20
1000 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/12/20
1100 B/O 2ND PLACE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 11/12/20
1000 B/O 8TH ST SE   THEFT
Theft First Degree (theft From Building)
 11/12/20
1000 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft Of Motor Vehicle Parts Or Accessories)
 11/10/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/05/20
300 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/05/20
900 B/O 4TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/01/20
UNIT B/O I ST SE   THEFT
Theft First Degree (shoplifting)
 10/31/20
900 B/O HALF ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/29/20
300 B/O TINGEY ST SE   ROBBERY
Carjacking
 10/29/20
1300 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/28/20

Recent Issued Building Permits Archive  
1200 1ST ST SE   
11/04/20 
PEPCO / DONNA G GRAHAM
AH2100169 / CONSTRUCTION
WO #16029084 / 02 - 1200 1ST ST SE - PEPCO / WA CHESTER TO REMOVE AND INSTALL CABLES MONDAY THROUGH SATURDAYS FROM 9PM TO 6AM STARTING 11 / 5 / 20 TO 12 / 5 / 20
1018 3RD ST SE   
11/10/20 
DAVID A LEINER / null
E2101357 / SUPPLEMENTAL
1300 4TH ST SE 1001   
11/03/20 
YAAN REAL ESTATE LP / null
P2100950 / SUPPLEMENTAL
1300 4TH ST SE RU-1   
11/19/20 
AP BOWER RETAIL LLC / null
E2101650 / SUPPLEMENTAL
1057 5TH ST SE   
11/05/20 
PAM HARDER / null
E2101183 / SUPPLEMENTAL
82 I ST SE   
11/12/20 
STARRY / null
E2101432 / SUPPLEMENTAL
330 K ST SE   
11/09/20 
MINDY J SHAW / CASEY CHARKHABI; NA
B2008664 / CONSTRUCTION
Adding a bathroom on the first floor
   
11/10/20 
JINGSONG XIA / null
P2101107 / SUPPLEMENTAL
100 M ST SE   
11/12/20 
LHREV WASHINGTON M ST LLC / null
P2101170 / SUPPLEMENTAL
   
11/12/20 
SQUARE 743 INC / ;
P2101121 / SUPPLEMENTAL
139 N ST SE   
11/10/20 
BROOKFIELD DEVELOPMENT / JUSTIN BELLOW; BROOKFIELD DEVELOPMENT
B2004436 / CONSTRUCTION
NEW CONSTRUCTION 10-STORY PLUS PENTHOUSE APARTMENT BUILDING WITH 379 UNITS. PROPOSED GROSS FLOOR AREA: 225,000 SF. SH2000028 issued
1275 NEW JERSEY AVE SE   
11/04/20 
USA / null
E2101168 / SUPPLEMENTAL
   
11/09/20 
BROOKFIELD PROPERTIES / TIM GOOD
BP2100588 / POST CARD
71 POTOMAC AVE SE APT 1208   
11/02/20 
null / NA NA NA
EHOP20957167 / HOME OCCUPATION
71 POTOMAC AVE SE   
11/04/20 
RIVERFRONT HOLDINGS II, LLC / null
M2100380 / SUPPLEMENTAL
   
11/04/20 
RIVERFRONT HOLDINGS II, LLC / null
P2100978 / SUPPLEMENTAL
   
11/09/20 
MRP REALTY / null
E2101319 / SUPPLEMENTAL
227 TINGEY ST SE   
11/18/20 
FC 227 LLC / null
E2101630 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.