Since January, 2003
            
 Page Through from Before to After

Time for my quarterly {ahem} update on all of the construction projects you are picking your way past when you walk/drive/bike around the Hood:
I'll start with the new openings and the coming soons, with both Due South Dockside and Morini Piccolo now operating (softly) on the Yards Park boardwalk, and Cava in the Homewood Suites at Half and M in Any Second Now territory:
As for buildings getting their faces on, I present Skanska's 99 M office building and the new DC Water headquarters:
There's also now two new arrivals above ground, as PN Hoffman's condo project The Bower has at last made its debut at 4th and Tingey, as has the DC Housing Authority's as-yet unnamed mixed-income rental building at 2nd and L, both of which are shot from the south instead of the intersection because it's now the time of year when anything shot to the south-southeast, south or south-southwest will look terrible, no matter what time of day:
Next on the assembly line, two more residential projects projects are likely to be making their above-ground debuts before the end of the year: JBG's West Half project directly north of Nats Park, and the McDonalds-slaying 2 I Street project:
Other holes in the ground I won't highlight this time around include the Bower's sibling rental project at 4th and Water, Toll Brother's Parc Riverside Phase II at Half and L, the Jair Lynch residential project at the Half Street Hole, and the combo project at South Capitol and M for the new National Association of Broadcasters headquarters and its next-door residential project labeled 10 Van.
Also, WC Smith has cleared the lot at 2nd and I to make way for the beginning of work on the Garrett, the third and final apartment building that makes up "The Collective" on that block. Plus, fences are up along 3rd Street for the next project in the Yards lineup, the 270-unit apartment building currently known as "Parcel L2." (Great, I have to update my Highlighted Projects map again.)
Just to make sure all ends of the construction spectrum are represented, one hole is even starting to get covered over, and that's in the 200 and 300 blocks of Virginia Avenue, where the Virginia Avenue Tunnel work is far enough along that you can actually start to imagine a street appearing again in those blocks in the coming months:
Finally, I'll close with a shot of a tearing down rather than a building up, and that's the pile of debris formerly known as 37 L Street SE--just in time to mark the 40th anniversary of the Cinema Follies fire, on Oct. 24, 1977.
So, while the neighborhood is taking a back seat these days to all of the excitement surrounding the opening of the Wharf down the road, there is still a fair amount happening. (And hopefully the neighborhood blogger will someday get back in the groove. Still riding the rollercoaster of my new not-yet-ready-to-call-it-normal.)
Comments (20)
   
 
 More About Development News

JDLand.com Home

Comments

Marc says: (10/23/17 5:28 PM)
Thanks for the updates and photos! Excited about Cava. Have you heard anything about Whole Foods? Has ANYONE? Is it delayed until the Garrett is done or something? Until Amazon re-configures their grocery store vision? I'm sure these get asked a lot, but maybe I missed something. Thanks again!
Marc


JD says: (10/23/17 5:32 PM)
I promise everyone, no matter how bad at this I have become, that the second I have Whole Foods need, I will post it. As of now, there is nothing official.


Marc says: (10/23/17 5:36 PM)
Thank you for the quick reply! I really appreciate your blog.


202_cyclist says: (10/23/17 6:00 PM)
Thank you for the updates-- appreciated. Is lower Barrack's Row outside the boundary of JD Land?


202_cyclist says: (10/23/17 6:01 PM)
Also, I think we need to add 1221 Van to the list of projects that seem like they are taking forevr.


202_cyclist says: (10/23/17 6:01 PM)
*forever.


RMP says: (10/23/17 6:28 PM)
Thanks for the great new pics! It's quite unfortunate timing that the two boardwalk places opened at the very end of patio season. I imagine they are going to be absolutely hopping on Friday nights next summer.

I was just wondering what's going on with 1221 Van. I'm curious which floorplans are going to have the ballpark views and what they're going to ask for them.


JD says: (10/23/17 6:31 PM)
I meant to mention that 1221 Van is at it's due date for starting leasing, but no word that I've heard.

Lower 8th is part of my purview, but in addition to everything else I have a suspected labral tear in my hip and so the notion of walking over there too was untenable. Just pack me up for the home.



JD says: (10/23/17 6:32 PM)
(So, yes, 801 Virginia should have been included in my rundown.)


GG says: (10/23/17 6:32 PM)
Apologize if this has already been pointed out but what is up with them keeping part of an old building in the new DC water building? It looks like it isn’t part of the historic pumping station, and they haven’t taken much care to keep it from being damaged while building around it. Any ideas?


JD says: (10/23/17 6:36 PM)
It's a pumping station too, and still operational. I think they'll be able to look down into it from the new building.


GG says: (10/23/17 6:39 PM)
Ah. Interesting. I thought only the nice looking one next door was being kept. Makes sense to surround it then.


knavyard says: (10/24/17 9:11 AM)
According to their website, Cava is supposed to open this weekend!


CMG says: (10/24/17 12:07 PM)
What about the chipotle?


G Street says: (10/24/17 4:31 PM)
Great update = as always


Snacks says: (10/25/17 10:20 AM)
Re: Whole Foods - I took a tour of the Park Chelsea around June and was told the plan (at that time) was for the ownership group of those buildings to hand over the space to Whole Foods around January 18 for them to begin building out the space. Based on the current timelines and now being owned by Amazon, who knows if that's going to stick.

I don't think they can hand the building over until the Agora is more complete as they need access to all the space (roads, sidewalks, building exteriors) and trying to have 2 different work crews on site would be very awkward. Not to mention the distinct possibility Amazon may finish building it quicker and it'd be done before the Agora.

Seriously, do they have more than 6 people working on the Agora??



RMP says: (10/25/17 11:05 AM)
I don't know what the deal is with WCS but at least they're consistent about being super slow and behind schedule. Before Park Chelsea opened, I called the phone number on their website and the voicemail said "we look forward to welcoming our first residents in July!". This was in January, mind you. They were 6 months behind and hadn't even bothered to update their voicemail. Nobody ever called me back either.


jdc says: (10/25/17 3:03 PM)
Excavation and foundation work at Parc phase II going full steam ahead. They also pushed out the fencing to block sidewalks on south and west side - only north side sidewalk is still available.


202_cyclist says: (11/2/17 11:34 AM)
It looks like there has been significant construction activity for the hotel being built next to the Yards park.


JD says: (11/2/17 11:35 AM)
To be more accurate, the residential building is right next to the park--the hotel will be up at Tingey Street.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

JD on I'm Dreaming of: A long time ago, in a neighborhood not so far away, Huey's 24-7 Diner was in the...
bdj on I'm Dreaming of: DC crossing (the place being built on 1st between K and I) has some pretty massi...
CJBabyDaddy on I'm Dreaming of: Two things everybody might agree on: A popular 24-hour diner somewhere in the ‘...
VelocityChris on I'm Dreaming of: Agreed JES, 24 hour diner would be perfect! To add another decent DC diner, Ari'...
CJBabyDaddy on I'm Dreaming of: @RMP: If anyone’s organizing a GoFundMe for more of those awesome crosswalk-blo...
JES on I'm Dreaming of: an "urban style" IHOP or waffle house down here would be awesome, main...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
No records added or modified in the past two weeks.

Recent Issued Building Permits Archive  
1402 1ST ST SE   
11/25/19 
UNITED STATES OF AMERICA / DAVID C POSTLEWAITE
SB1900412 / CONSTRUCTION
Parcel G2:WSP will complete four borings up to the deepest potential subgrade elevation (approx. 32 ft. bgs). The proposed boring locations would be in the four quadrants of Parcel G2 to check for spatial variability in contaminant concentrations. WSP will collect and analyze three soil samples from each boring from depths corresponding to potential subgrade elevations (i.e. 10-12 ft. bgs, 20-22 ...
1212 4TH ST SE   
11/25/19 
FC 1212 LLC / TAMIKA STATON; OTIS
ER2000409 / SHOP DRAWING
Replace governor car #2 - Part #: TBA20641H6 Replace hoist belts #1 and #4 - Part #: SB0003119
1300 4TH ST SE   
12/06/19 
ASANA PARTNERS / S.A. COMUNALE; S.A. COMUNALE
P2001954 / SUPPLEMENTAL
1346 4TH ST SE   
12/06/19 
KAITLYNN MATTEO / W. SAKIE - BHAR; W. SAKIE - BHAR; NA
SG2000117 / CONSTRUCTION
Install one set of non illuminated sign on to existing store front building
   
12/12/19 
FC 1346 HOLDCO I L L C / ;
P2002122 / SUPPLEMENTAL
82 I ST SE   
12/13/19 
GDVC EYE STREET LLC / ALYSSA CARRABIS; IRON FISH CONSTRUCTION IRON FISH CONSTRUCTION
B2002764 / CONSTRUCTION
SCOPE OF WORK: CONSTRUCTION OF A NEW 120 SQSF CLOSET SPACE WITHIN AN EXISTING PARKING GARAGE. NO CHANGE IN EGRESS OR PATH OF TRAVEL. MAINTAIN UNOBSTRUCTED PATH OF EGRESS AS REQUIRED BY CODE THROUGH CONSTRUCTION.
408 L ST SE   
12/11/19 
JOSEPH LEBLANC / KYLE YOST
SOL2000412 / CONSTRUCTION
rooftop solar pv system, less than 4' above roof
   
12/13/19 
JOSEPH F LEBLANC / null
E2002722 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
11/26/19 
GREYSTAR GP I I, LLC / KIM MITCHELL; KIM MITCHELL
FD1900040 / CONSTRUCTION
TWO BELOW GRADE PRKING LEVELS, CONCRETE FOUNDATION WALLS, SLAB ON GRADE, COLUMNS ELEVATED DECKS UP TO GRADE WITH UNDERGROUND UTILITIES (MECHANICAL, PLUMBING, ELECTRICAL)
   
12/05/19 
MIKE ALLEN / JANE MCCRAY
AH2000244 / CONSTRUCTION
WO# 1611441 - Mike Allen / P. Helgeson. Pepco to install network transformer
   
12/12/19 
CXS PROPERTIES GROUP / CHARLES C. BAKER; CHARLES C. BAKER
P2002143 / SUPPLEMENTAL
125 O ST SE   
11/25/19 
DISTRICT OF COLUMBIA / DAVID C POSTLEWAITE
SB1900411 / CONSTRUCTION
WSP will complete three borings up to the deepest potential subgrade elevation (approx. 32 ft. bgs). WSP assumes that borings will not be installed inside the fleet maintenance facility due to access restrictions imposed by DC Water. The proposed boring locations form an ‘L’ shape around the eastern and southern sides of the fleet maintenance facility. WSP will collect and analyze three soil samp...
71 POTOMAC AVE SE   
12/06/19 
MPR REALTY / BOB BIROONAK; BOB BIROONAK; ART DISPLAY CO
SG2000099 / CONSTRUCTION
One building name MAREN Two set of address numbers all signs are non-illuminated
227 TINGEY ST SE   
12/02/19 
FC 227 LLC / KAYLA SHATTUCK; BROOKFIELD PROPERTIES MANAGEMENT LLC.
RW1900122 / CONSTRUCTION
Construction of new retaining wall located between Canal Street St and Third Street, SE.
300 TINGEY ST SE   
12/04/19 
FC BOILERMAKER LLC / ROBERT S. WATTS; ROBERT S. WATTS
E2002289 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.