Since January, 2003
            
 Page Through from Before to After

With work having progressed on the expansion phase of the Virginia Avenue Tunnel, CSX is announcing that 4th Street SE between Virginia and I Street will be closed for three to five weeks, starting perhaps on Thursday, Sept. 29, so that the existing temporary bridge deck can be removed and the tunnel's roof completed in that spot. Then a new deck will be built across the next area to be excavated to work on the other half of the tunnel project, at which point the area will reopen to traffic.
UPDATE: The weather has forced a postponement of the closure until likely next week, Oct. 3-7. UPDATE 2: And the intersection did finally close on Monday, Oct 3.
This means that drivers coming south on 4th Street SE from Capitol Hill will need to detour either to 3rd Street or 7th Street in order to cross under the freeway to the promised land.
Pedestrian access along this stretch of 4th will apparently be maintained during the closure, as will the 4th Street exit from the Capitol Quarter driveway.
This is the first of these sorts of closures and detours that will need to happen along all of the north-south streets that cross Virginia Avenue as work on the first phase of the tunnel wraps up and the decks need to be reestablished a smidge to the north to cross above the existing tunnel while it is rebuilt.
At right is the estimated timeline for these other closures as shown in the Sept. 21 Coffee with Chuck presentation slides (click to embiggen). Third Street's temporary closure for this work is on deck (so to speak) for mid-to-late October, 5th in mid-to-late December, and 7th and 8th sometime in 2017. (The deck work on 11th Street will happen without any full closure.)
The slides also say that Phase II pile driving is expected to begin near 4th Street in October.
The next quarterly open house for the project is scheduled for Thursday, Oct. 20, and the next Coffee with Chuck will be on Wednesday, Nov. 16.
Comments (14)
   
 
 More About CSX/Virginia Ave. Tunnel

JDLand.com Home

Comments

walt says: (9/28/16 2:58 PM)
I wish they had completed the temporary bridge on 4th BEFORE turning westbound VA Ave into two way traffic.
Westbound VA Ave gets very backed up with traffic merging onto 395, and this is just one more block I have to fight with Virginia drivers before turning off on 3rd Street.
Or is 7th going to reopen before they close off 4th? That could improve it.

Also, for the record, I wish CSX would learn that the area is called Capitol Quarter, and NOT Capitol QuarterS. My home is not a barracks or a dorm room, thank you very much!


Ampersand says: (9/28/16 5:03 PM)
Oh gosh, the closure of 3rd St for 6-8 weeks is going to be...interesting. That will mean, what, a few hundred cars that have to find a detour? I think that's more traffic than 5th can handle, and the intersection of S Capitol and I already gets awful at rush hour. Maybe they can put up signs for a roundabout detour from I to NJ to E to 3rd.

It will be especially interested if somehow the Nats make it to the WS and are still playing when it happens....


Chaifetz10 says: (9/28/16 7:14 PM)
FYI the fence is down around the Dock 79 plaza and river walk. The water feature was on yesterday as well.


JD says: (9/28/16 10:06 PM)
I shall go check it out when it doesn't require an ark to get there.


dude says: (9/29/16 8:58 AM)
The promised land indeed!


arlancas says: (9/29/16 9:47 AM)
Any idea if 3rd is going to be an actual "closure", or simply closed to southbound traffic, as it was previously?


G Street says: (9/29/16 2:11 PM)
Which way to "the promised land"? (-:


JD says: (9/29/16 4:00 PM)
@arlancas, It does sound like it's going to be a full closure. From an e-mail from CSX today:

"Please make plans now to attend the next Virginia Avenue Tunnel project Open House event on Thursday, Oct. 20, from 5:30 to 7:30 p.m. at the Courtyard Marriott Hotel, 140 L Street, S.E. Project representatives will be available to answer questions about recent and upcoming activity.

"CSX plans to feature detailed information about the closing of 3rd Street, S.E. at Virginia Avenue, which is expected to occur in late October. [An earlier version of this message said this closing would occur in December, which was incorrect. CSX apologizes for any confusion this may have caused.] Neighbors are encouraged to attend if they have questions about how this closing will affect the neighborhood."


RMP says: (9/29/16 5:35 PM)
Anyone heard the rumor that a barber shop is coming to the (now former) leasing center in Foundry Lofts? It sounds like there's going to be more weekend pop ups in the vacant retail space at Arris as well link


snakegriffin says: (10/2/16 2:34 PM)
That comment from the other thread was right about needing more signage. I've seen two near misses where the light to cross Virginia was green and watched westbound cars fly right through without noticing the light. Only a matter of time before something bad happens there. I haven't approached from the east, is there not at least a "new traffic pattern" sign or anything?


NavyYardGuy says: (10/3/16 11:42 AM)
Bethesda Bagels to Navy Yard:

link


JD says: (10/3/16 11:45 AM)
Inside or outside the walls? ;-)

Just as a piece of general info, I don't consider PoP a primary source, so posts from him don't pass my quality test before I post news.


202_cyclist says: (10/3/16 1:43 PM)
I hope Prince of Petworth is correct with Bethesda Bagels.

Following up on Chaifetz10's observation about Dock 79 and the Riverwalk, this area was indeed open this weekend and looks to be a very pleasant space.

Also, checking back at the predictions for the Nationals 2016 regular season record, I am glad I guessed wrong. brothbart looks to be the lucky winner. link

Finally, this is prime JD Land happy hour weather. There are coupons on the back of the Harris Teeter receipts for the Brig, so we should put them to good use.


RMP says: (10/4/16 8:19 AM)
Saturday is shaping up to be really interesting in the neighborhood. The All Things Go concert starts at noon on Parcel A and appears to go all night. link

I wonder how exactly that will work and if the restricted area will spill over onto Parcel H/I like they do with Snallygaster and other events, or if they'll keep H/I as parking for the NLDS. Either way, anyone getting off Metro at NJ won't be able to cut through Parcel A as they're probably used to doing.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

CJBabyDaddy on Roundup of Some: @WestNorth: Methinks the proposed land swap involves/involved Navy Yard waterfr...
conngs0 on Roundup of Some: Cool news about the museum. It'll be interesting to see how it progresses from ...
Westnorth on Roundup of Some: Navy Museum is fundraising for a $450M new spot outside the Navy Yard gates, for...
VelocityChris on Roundup of Some: They're adding two floors to the top of the WeWork building.
GarfieldPark on Roundup of Some: Anyone know what is happening on First st outside of WeWork bldg? They are doing...
right-toe on Roundup of Some: Lots of little changes around: Sidewalk has opened up around the DDOT building,... [image]
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O HALF ST SE   ROBBERY  10/21/20
UNIT B/O K ST SE   THEFT
Theft First Degree (all Other Larceny)
 10/20/20
900 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/15/20
600 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/13/20
UNIT B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/12/20
1000 B/O 1ST ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/12/20
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/09/20
1000 B/O 8TH ST SE   ROBBERY
Armed Carjacking
 10/09/20
400 B/O M ST SE   THEFT
Theft 2nd Degree - Felony (theft From Building)
 10/07/20
900 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/01/20
1000 B/O 3RD ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/30/20
UNIT B/O K ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/29/20
1100 B/O 2ND PLACE SE   ROBBERY
Assault W/i To Commit Robbery (simple Assault)
 09/28/20
1000 B/O 4TH ST SE   ROBBERY
Carjacking
 09/26/20
1200 B/O HALF ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/22/20
600 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/21/20

Recent Issued Building Permits Archive  
1108 3RD ST SE   
10/06/20 
JULIANA DUFFY / null
E2100156 / SUPPLEMENTAL
915 5TH ST SE   
10/14/20 
RYAN DANIELS / FERNANDO A ANGULO; RYAN DANIELS
B2012669 / CONSTRUCTION
Partial floor joists replacement on first floor. replace 6 feet height wooden fence and gate. add protective coating to partial foundation wall.
1031 5TH ST SE   
09/30/20 
CLARICE GEE / null
P2009304 / SUPPLEMENTAL
150 I ST SE   
10/09/20 
SQUARE 737 LLC / JASON D DORRIS
AH2100047 / CONSTRUCTION
Construction of a new 13 story apartment building with three below grade parking levels, 1st floor retail and amenity areas; 373 units and 181 parking spaces. To include mechanical, electrical, plumbing, elevators and structural work.
   
10/15/20 
SQUARE 737 LLC / BOB BIROONAK; BOB BIROONAK
SG2000458 / CONSTRUCTION
one directional double face non illuminated sign
100 M ST SE   
09/25/20 
LHREV WASHINGTON M STREET LLC / THUY LE; NA
B2010745 / CONSTRUCTION
Suite 950 - Interior alteration. Work is to include minor change in MEP and Fire. No Structure.
139 N ST SE   
10/08/20 
null
SH2000028-EXT-1 / CONSTRUCTION
Original Permit expires 4 / 15 / 2021, 1st extension expires 10 / 15 / 2021
861 NEW JERSEY AVE SE   
10/13/20 
CXS TRANSPORTATION INC / null
P2100338 / SUPPLEMENTAL
125 O ST SE   
10/02/20 
DISTRICT OF COLUMBIA / null
M2100033 / SUPPLEMENTAL
71 POTOMAC AVE SE   
10/15/20 
RIVERFRONT HOLDINGS II, LLC / OLUSOLA PYNE
B2100519 / CONSTRUCTION
Shipping Container placement on lot for exterior use.
227 TINGEY ST SE   
09/30/20 
FC 227, LLC / BRIAN QUINN
B2011139 / CONSTRUCTION
Conversion of apartment unit to model unit.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.