Since January, 2003
            
 Page Through from Before to After

It's now official that the decommissioned USS Barry is in its final weeks at the Washington Navy Yard, with the Navy having announced that the ship is expected to be towed on May 7 down the Anacostia to the Potomac and then up to Philadelphia's "Inactive Ship Maintenance Office." It will then be dismantled and recycled for parts.
If you are wanting to wave farewell, be prepared to set your alarm--it's expected to start around 6 am. It will also require that the Douglass Bridge's span be raised rotated for it to pass through.
It was over a year ago that it was announced that the Barry would be leaving, with the Navy citing the ship's deteriorating condition along with the expectation of construction of a new fixed span Douglass Bridge leaving the Barry locked up river if it weren't moved beforehand.
(Would have been nice to get a credit for my photo of the Barry that the CNIC story used! Though now it's been replaced with a non-JDLand photo.)
Comments (7)
   
 
 More About Navy Yard
 All posts: Navy Yard

JDLand.com Home

Comments

JES says: (4/11/16 10:02 PM)
I hate this so much. If it's just gonna be scrapped, who cares that they'd never be able to tow it out? Leave it for show.


Chris says: (4/12/16 1:00 AM)
You mean that the bridge's span will be rotated, not raised, right?


JD says: (4/12/16 9:45 AM)
Thanks, Chris, fixed.


conngs0 says: (4/12/16 9:48 AM)
I agree that this is a little sad. There's undoubtedly potential to spiff up the USS Barry to the point where it would be a fun element in the revitalized Anacostia waterfront area. However, I concede that I have no idea how many resources would have to be allocated to accomplish that (I gather the renovations and maintenance to the ship itself as well as the docks would be quite extensive). I'm definitely glad I got a few chances to explore the ship though. Despite not being the most historically significant ship in the U.S. fleet, it served during some very historically significant times. Who knows, maybe the Douglass Bridge won't rotate properly (I can't imagine they open it up a lot) and they'll have to keep the USS Barry where it is!

JD, I hope that this post is a sign that you're on the mend. Perhaps the upcoming sunny weather is just the ticket to completely recover and take a few more photos!


JD says: (4/12/16 9:53 AM)
Thanks, @conngs0. I'm rid of the strep (which was ghastly) but now have a lingering cold w/chest congestion that the piles of penicillin for the strep do nothing for. This was the only post I could imagine spitting out with the least amount of energy. :)



Edna says: (4/12/16 4:18 PM)
Did they change the photo on the press release?


JD says: (4/12/16 4:23 PM)
Ah, yes, I see they did.

Official organizations need to learn that I *will* see it if they use one of my photos, and *will* call them out publicly.


Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

GarfieldPark on Roundup of Some: Wagtime has now turned into Dogtopia? New owners or what?
CJBabyDaddy on Roundup of Some: To my fellow New FDMB arch geeks: As of COB Friday, August 7, nine of the twelv...
CJBabyDaddy on Roundup of Some: La Famosa (1st floor of the Bower) targeting a late August or early September op...
GarfieldPark on Roundup of Some: Target date of Wed Aug 12th for I ST CVS. Can't come soon enough!
JES on Roundup of Some: It looks like punch bowl isn't completely dead, as they're reopening some locati...
JD on Roundup of Some: Wow, no, hadn't seen that. But it is a really good reminder that any expectat...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/04/20
1000 B/O 8TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/02/20
1100 B/O 2ND PLACE SE   BURGLARY
Burglary Two
 07/31/20
100 B/O I ST SE   THEFT
Theft First Degree (all Other Larceny)
 07/30/20
100 B/O O ST SE   ASSAULT WITH A DANGEROUS WEAPON  07/28/20
400 B/O M ST SE   THEFT
Shoplifting
 07/24/20
100 B/O M ST SE   BURGLARY
Burglary Two
 07/20/20
UNIT B/O N ST SE   ASSAULT WITH A DANGEROUS WEAPON  07/20/20
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (theft From Building)
 07/13/20
900 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/09/20
1500 B/O 1ST ST SE   SEX ABUSE
Assault W/intent To Commit First Degree Sexual Abuse (force) (rape)
 07/08/20

Recent Issued Building Permits Archive  
1300 4TH ST SE 1001   
07/22/20 
LA FAMOSA / null
E2009613 / SUPPLEMENTAL
1300 4TH ST SE 130   
07/24/20 
TOM AN / KIMOY LALLEMENT
A2005055 / CONSTRUCTION
New sail shade awning at exterior private space of La Famosa restaurant (Permit #TL2000028)
900 5TH ST SE   
07/13/20 
null
B1906215-EXT-1 / CONSTRUCTION
1ST EXTENSION TO B1906215, EXTENSIOIN WILL EXPIRE ON 03 / 01 / 2020. ORIGINAL SCOPE: Reconstruction of 4-story residential building, the Arthur Capper Senior Center, damaged by fire.
1150 5TH ST SE   
07/16/20 
DISTRICT OF COLUMBIA / null
P2007453 / SUPPLEMENTAL
   
07/22/20 
DISTRICT OF COLUMBIA / null
E2009571 / SUPPLEMENTAL
10 I ST SE   
07/27/20 
CAPITOL HILL RACQUET CLUB / ANDREW ARNOLD; NA
SB2000413 / CONSTRUCTION
We propose drilling two (2), six-inch diameter geotechnical test borings (B-7 and B-8) using the hollow stem auger method to evaluate the subsurface conditions. The proposed test boring depths will be 85 feet below the existing ground surface. If a confining unit is encountered, outer casing will be installed which will extend 10 feet into the top of the confining unit or to the top of bedrock. Up...
423 L ST SE   
07/24/20 
JOHN P LANG / MARGO RICKS
SOL2001665 / CONSTRUCTION
To install 4.56 kW size of solar panels with a system height of 1.1 feet on roof of building.
250 M ST SE   
07/21/20 
SQUARE 769 LLC / null
E2009527 / SUPPLEMENTAL
300 M ST SE   
07/27/20 
FEDERAL CENTER LP / null
E2009758 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
07/23/20 
GREYSTAR GP LLC / null
M2003144 / SUPPLEMENTAL
1105 NEW JERSEY AVE SE   
07/23/20 
GALLERY CAPITAL RIVERFRONT PROPERTY LLC / null
E2009620 / SUPPLEMENTAL
1200 NEW JERSEY AVE SE 20590   
07/14/20 
JBG/FEDERAL CENTER LLC / SAM HOLLEN
B2006851 / CONSTRUCTION
INTERIOR RENOVATION TO 1ST FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MECHANICAL, ELECTRICAL AND LIFE SAFETY. NO PLUMBING. NO STRUCTURAL. 1700 SQUARE FEET. GSA / DOT
1275 NEW JERSEY AVE SE   
07/13/20 
FC 1275 NJ, LLC / PARKER HARRELL
SB2000382 / CONSTRUCTION
We are abandoning 14 gravel packed dewatering wells and one piezometer. All pumps and associated hardware will be removed from the wells. Each well casing will then be removed of perforated. We will then tremie each borehole using a bentonite slurry (two pounds bentonite powder to one gallon water).
1033 O ST SE 20374   
07/13/20 
UNITED STATES OF AMERICA / STANELY CARPENTER; JILL S CUTLER
BCIV2000111 / CONSTRUCTION
Install a safety shower and eye-wash station with a concrete base at the hazardous waste storage area near Building 166 at the Washington Navy Yard.
79 POTOMAC AVE SE 505   
07/15/20 
null / NA NA NA
EHOP20993669 / HOME OCCUPATION
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.