Since January, 2003
            
 Sliding from Before to After

Near the northeastern edge of the footprint of the Yards, on the southeast corner of 5th and M, stands the old Gun Assembly / Broadside Mount Shop building, also known as Building 202, built in 1941 and waiting its turn as the next historic building in the neighborhood to be "adaptively reused."
When plans to redevelop the old Southeast Federal Center into The Yards were unveiled, Building 202 was included in the lineup of the project's first phase, and was said to be on the boards to be redeveloped by PN Hoffman as a 270ish-unit condo building. But other than some very basic renderings and a few tentative dates that quietly came and went, the building has remain untouched.
But perhaps that is about to change, as the Washington Business Journal is reporting that "numerous developers have approached Forest City about buying and redeveloping" the 215,000-square-foot building, prompting the decision to now actually market the site for sale, with offers due on Oct. 15. ("Price not disclosed.")
(This second image of Building 202 was taken from the roof of the old Capper Seniors building in late 2007, shortly before its demolition and long before Twelve12 and its Harris Teeter arose next to 202.)
The building is described as having potential "as an industrial loft-style office space, a boutique hotel, high quality condominium units or cultural use." The sales flyer also mentions the central atrium that "extends the full height of the building" and that 202 is part of the Washington Navy Yard Historic District, which means that any buyer will have quite the steeplechase of approvals to get before doing anything to the building. (One would also imagine that Forest City would want any future plans for the building to fit in with the rest of the tableau at the Yards.)
As for PN Hoffman, the developer did not forsake the Yards--the company purchased the "Parcel O" site at 4th and Tingey last year and is moving forward with a 130ish-unit condo building on that site, with a new Forest City rental building planned immediately to its south. Both buildings are expected to begin construction early in 2016, and in fact just today a reader alerted me to a new sign on the lot announcing "Condo Sales Spring 2016/PN Hoffman."
Comments (5)
   
 
 More About Development News

JDLand.com Home

Comments

JES says: (10/6/15 9:36 AM)
I shudder at the asking price if they indeed turn this into condos. At the same time, it'd be nice to have it useful again!


Blue says: (10/7/15 12:14 AM)
Neighborhood needs a whirlyball court.


202_cyclist says: (10/7/15 5:46 AM)
Significant lower Barrack's Row development for VA Ave SE:

link


JD says: (10/7/15 9:10 AM)
Maybe the third time is the charm on that one.

link


snakegriffin says: (10/7/15 7:55 PM)
Great to see news of condos! How do these things typically work in presales? Is it just an earnest money deposit, or do you actually mortgage and buy while construction takes place? Heard it's never good to do presales because often the developer will change a lot of things during construction, but the demand has to be pretty high for these and we don't want to miss out!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

sharksfansd on Meet the New: Kilwins opened up yesterday across from Nats Park. Didn't wind up going in, but ...
dcgent on Meet the New: I don't have a WBJ subscription but fyi Felice Development buys big Southeast de...
rpb on Meet the New: Taxi garage at New Jersey & L is being demolished today. Guessing the old Ea...
JD on Meet the New: Emmy Squared Pizza opening Friday at 5 pm at its space at 4th and Tingey, sez @t...
Andres4Mayor on Meet the New: Varnish Lane nail salon coming to the former GNC space.
Andres4Mayor on Meet the New: AT&T store now open in the former Capital One Bank space. Just a Verizon sto...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
No records added or modified in the past two weeks.

Recent Issued Building Permits Archive  
1300 4TH ST SE 1001   
02/22/21 
AP BOWER RETAIL LLC / null
E2104231 / SUPPLEMENTAL
1346 4TH ST SE APT 1M   
02/06/21 
null / NA NA NA
EHOP21945129 / HOME OCCUPATION
1331 4TH ST SE R-2   
02/08/21 
FC 1331 LLC / FC 1331 LLC
BP2101814 / POST CARD
10 I ST SE   
02/16/21 
CAPITOL HILL RACQUET CLUB / NA; VICTORIA STEINHOFF
SB2100112 / CONSTRUCTION
Installation of up to six (6) 3-inch diameter direct-push Geoprobe borings to depths of up to 30 feet below grade as part of an environmental assessment.
555 L ST SE   
01/29/21 
UNITED STATES OF AMERICA / RENNE WELL; RICK HARLAN SCHNEIDER
B2102004 / CONSTRUCTION
DGS PROJECT REHABILITATION+RESTORATION OF THE HISTORIC LINCOIN FIELDHOUSE
861 NEW JERSEY AVE SE 20003   
02/23/21 
809-853 NEW JERSEY AVE ACQUISITION LLC / SUSANA VAZQUEZ
AH2100728 / CONSTRUCTION
Dismantling of tower crane.
809 NEW JERSEY AVE SE   
02/11/21 
GREYSTAR GP LLC 809-853 NEW JERSEY AVENUE ACQUISITION LLC / null
E2103926 / SUPPLEMENTAL
853 NEW JERSEY AVE SE   
02/11/21 
GREYSTAR GP LLC / null
E2103924 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
02/05/21 
GS CSX HOTEL OWNER LLC / null
E2103762 / SUPPLEMENTAL
1275 NEW JERSEY AVE SE   
02/02/21 
FC 1275 NJ LLC / null
E2103662 / SUPPLEMENTAL
   
02/11/21 
FC 1275 NJ LLC / null
P2103445 / SUPPLEMENTAL
848 SOUTH CAPITOL ST SE   
02/16/21 
CXS TRANSPORTATION INC / VICTORIA STEINHOFF; TBD
SB2100111 / CONSTRUCTION
Installation of up to six (6) 3-inch diameter direct-push Geoprobe borings to depths of up to 30 feet below grade as part of an environmental assessment.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2021 JD.