Since January, 2003
            
 (a random before-and-after moment)
January 27, 2008
May 19, 2019
Half at L, Looking Southeast (see more)

Rumored a few months ago after a liquor license application appeared in the pipeline, it's officially being announced today by Forest City Washington that the owners of Brooklyn Winery will be opening DC's first "urban winery" in a new 16,000-square-foot pavilion on the southwest corner of 4th and Water Streets SE in the Yards Park.
It will be named District Winery, and is to "feature the most popular components" of the Brooklyn version--it will be a full-service restaurant, and will also have a wine tasting area, a private events space with an open-air terrace, and, "of course, an impressive collection of wines, crafted and aged onsite." The Brooklyn operation is also apparently a quite popular venue for weddings.
The new pavilion's design will apparently be quite a wood-and-glass look that will echo the nearby Lumber Shed and the Yards Park itself. When I wrote about the rumors back in May, I included some 2009-era imaginings of what the pavilion could look like from when the Yards Park was going through its approvals process, but my understanding is that the design has evolved considerably, with District Winery's input. (No new renderings are being made available just yet, however.)
Forest City says it expects to start construction in the spring of 2016 and that the winery would open in the fall of 2017.
Comments (19)
   
 
 More About Restaurants/Nightlife

JDLand.com Home

Comments

JD says: (9/21/15 10:40 AM)
One other item in the press release is that the planned PN Hoffman condo building and its sibling Forest City apartment building at 4th and Tingey are now expected to get underway in spring 2016 as well (there had originally been "late 2015" talks).


nairobs says: (9/21/15 11:05 AM)
Is it just me or does a year and a half seem like a really long time to build a one or two story pavilion?


JD says: (9/21/15 11:07 AM)
That's to not only build it but do all the necessary work to open the winery. I'm guessing that build-out, decorating, staffing, training, etc., is not a six-week job.


walt says: (9/21/15 12:47 PM)
JD, which corner of 4th and Tingey is the planned Forest City apartment building? It seems so long that 4th street has been closed off/under construction/in a mess that I was hoping they'd cool down on construction for a while or get it all over with at once. It does look great down there, but I can't walk by without getting sick from the smell of all the port-potties for the construction workers. Yikes!


JD says: (9/21/15 12:54 PM)
The only corner left at 4th and Tingey that isn't built-out--the southeast corner, where the trapeze school is (until it moves to New Jersey and Tingey sometime in the coming months). Here's the deets on the two buildings planned: link


willinrm says: (9/21/15 1:14 PM)
This may be old news but I was clicking around and saw that Chelsea/wholefoods (aka the never ending project) building will begin leasing January 2016


JD says: (9/21/15 1:20 PM)
My approach to the Park Chelsea leasing dates is now the same as the approach to most restaurant opening dates (and the 11th Street Bridge Park estimated completion dates, for that matter): take any pronouncements as an interesting piece of potential information, but don't mark it in ink on your calendar. At some point, the dates will be right, but will it be this particular pronouncement, or the next one....? :)




202_cyclist says: (9/21/15 2:17 PM)
@JD:

Interesting--- the H Street streetcar is also supposed to be carrying passengers by January 2016.

link


Section314 says: (9/21/15 9:04 PM)
It appears construction of the replacement Trapeze school has begun.


BillP says: (9/22/15 8:42 AM)
this is kind of a bummer as this open green space was a de facto part of yards park.

i guess the BID will have to start scheduling less popular acts for the free friday concerts because the yards park proper is going to be pretty darn small when all is said and done.


JD says: (9/22/15 9:23 AM)
One thing to keep in mind is that while yes, this patch of green (and eventually the one next to it) will be gone, the footprint stops at the sidewalk and tree/bench line on the south end. The grass that steps down to the boardwalk is not going anywhere.



S.B. says: (9/22/15 12:19 PM)
So does that mean this field is now going to be gone? Doesn't that mess up the event space that they have established there?


JD says: (9/22/15 12:24 PM)
The winery footprint is the eastern-most patch of grass--until the other pavilion gets built, the patch of grass between the winery and the Lumber Shed will still be there.

But yes, this does take away that events space. But this has been planned all along, that there would be two new pavilions built on these spots.



bryan says: (9/22/15 1:49 PM)
Regarding the condo/apartment on Parcel O: Your project page says the southern end of the condo/apartment will be closed by extending water street. Are there plans for the area just south of that? ie between the new water street and the riverwalk forest section of the park.


SWag says: (9/22/15 3:25 PM)
@bryan a developer for FC told me that it would be a very low condo building going in that space. no plans yet. unless JD has the super scoop (which I wouldn't doubt for a second...)


JD says: (9/22/15 3:28 PM)
{whistling, looking around}


SWag says: (9/22/15 4:01 PM)
LoL!


conngs0 says: (9/23/15 4:03 AM)
I'd just like to thank the developers for keeping this lot in such excellent condition until a suitable project came along. Although I have no doubt that the grassy space (and the one next to it) contributed slightly to the value of the land by serving as a great complement to the Yards Park, it simultaneously increased the ability of neighbors to enjoy the park too. Looking forward to trying out the new winery!


Westnorth says: (9/29/15 11:44 PM)
If I were the owner, I would've put gravel rather than grass down to avoid just this sort of confusion. Or the confusion over on Church Street NW, where the eponymous church wants to rebuild on what some *very* confused neighbors think is "their" park.

Most of the rental events I've been to this year have been over on the lawn west of the waterfall.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

jdc on Don't Call it: Parc Riverside phase 2 is really close to wrapping up exterior work, if not alre...
202_cyclist on Don't Call it: Will the 80 M Street plans go forward, irrespective of WeWork's pending implosi...
Westnorth on Don't Call it: 80 M St SE presented at ANC6D. Vertical addition will be mass timber! ANC als...
Westnorth on Don't Call it: Traffic changes for World Series home (and away!) games: https://sportscapital.d...
jdc on Don't Call it: Concrete barriers also long 1st St on the side with the currently empty expanse.
walt on Don't Call it: Re: Changes around Nats Park: Today on my way out, I noticed: 1. Installatio...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
100 B/O K ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/21/19
70 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/21/19
300 B/O M ST SE   THEFT
Theft First Degree (theft From Building)
 10/20/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 10/17/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/13/19
80 M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/11/19
100 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/10/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/10/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 10/10/19
500 B/O L ST SE   THEFT
Theft First Degree (all Other Larceny)
 10/08/19
1400 B/O 11TH ST SE   ASSAULT WITH A DANGEROUS WEAPON  10/08/19
1200 B/O VAN ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/03/19
1200 SOUTH CAPITOL ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/03/19
1100 B/O HALF ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 10/02/19
800 B/O VIRGINIA AVE SE   ROBBERY
Assault W/i To Commit Robbery (simple Assault)
 10/02/19
700 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/24/19
900 B/O 4TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/23/19
1200 B/O 1ST ST SE   ROBBERY
Assault W/i To Commit Robbery (simple Assault)
 09/23/19

Recent Issued Building Permits Archive  
1300 4TH ST SE   
10/07/19 
DFM DEVELOPMENT SERVICES, LLC / ARI BELMONTE; KONE
EN1903394 / SHOP DRAWING
Installation of (2) MRL KONE elevators in single hoistway. 15 Landings.
900 5TH ST SE   
10/08/19 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / TIMOTHY S CLEMONS; TIMOTHY S CLEMONS
M2000081 / SUPPLEMENTAL
   
10/08/19 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / RICHARD V CAREY; RICHARD V CAREY
P2000201 / SUPPLEMENTAL
   
10/15/19 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / WILLIAM B. CRIST; WILLIAM B. CRIST
E2000633 / SUPPLEMENTAL
1037 5TH ST SE   
10/18/19 
JOHN P LANG / SOLAR SOLUTION DC LLC; SOLAR SOLUTION DC LLC
SOL1901920 / CONSTRUCTION
To install 4.29 kW size of solar panels with a system height of 1.1 feet on roof of building,
4 I ST SE   
10/07/19 
CRESECENT CAPITOL VIEW MF LL / KIM MITCHELL; BEN KUNKLE
B1912371 / CONSTRUCTION
Third Party Review - Revision to Permit B1804349 (Approved Under the Velocity Program),Revision associated with additional occupiable spaces provided at the "Roof Floor" with corresponding egress, revised common space layouts and corresponding use and occupancy calculations, revisions to ground floor retail south entrance and amenity spaces at the ground level.
409 I ST SE 20003   
10/11/19 
JOSEPH KOCH / null
P2000322 / SUPPLEMENTAL
409 I ST SE   
09/27/19 
JOSEPH KOCH AND ELLEN FONG / ELIZABETH S MITCHEL; ELIZABETH S MITCHEL
B1915266 / CONSTRUCTION
Interior alteration including new kitchen, master bathroom and loft.
   
10/15/19 
SCOTT A FAULK TRUSTEE / FRED LATIMORE
E2000620 / SUPPLEMENTAL
100 M ST SE 200   
10/09/19 
SQUARE 743 INC / ;
P2000249 / SUPPLEMENTAL
100 M ST SE 7TH FL   
09/26/19 
SQUARE 743 INC / ;
P1909869 / SUPPLEMENTAL
100 M ST SE 7TH FLOOR   
10/03/19 
3NW 100 M STREET LLC / DANNY L COLEY; DANNY L COLEY
E2000146 / SUPPLEMENTAL
100 M ST SE   
09/25/19 
SQUARE 743 INC / NAVID PARTOVI; NAVID PARTOVI
M1904391 / SUPPLEMENTAL
   
09/27/19 
SQUARE 743 INC / MIGUEL A. MOROTE; MIGUEL A. MOROTE
E1912028 / SUPPLEMENTAL
   
10/21/19 
SQUARE 743 INC / JOHN C. BLOCK; JOHN C. BLOCK
E2000895 / SUPPLEMENTAL
   
10/21/19 
SQUARE 743 INC / null
E2000932 / SUPPLEMENTAL
250 M ST SE   
09/26/19 
SQUARE 769 LLC / JEFFREY D WOLF
AH1901292 / CONSTRUCTION
After Hours permit is respectfully requested from 3 am to 7 am daily.
   
10/03/19 
SQUARE 769 LLC / STEVEN CHEN
AH2000003 / CONSTRUCTION
Work Onsite Only - Columbus Day
300 M ST SE   
10/01/19 
FEDERAL CENTE LP C/O CHARLES E SMITH / DANI B RADOYE; TBD
B1908440 / CONSTRUCTION
interior build out new tenant into existing space to include installation of cabinetry, flooring, wall base, ceiling system, and light fixtures, hvac system and distribution / difusers, electrical panel / equipment, accessible restrooms,drinking fountain and service sink. First 1st floor only.
   
10/17/19 
FEDERAL CENTER LP / SUKWON KIM; SUKWON KIM; NA
SG1900286 / CONSTRUCTION
To install a set of illuminated LED channel letters on raceway onto wall
139 N ST SE 19714   
10/01/19 
DISTRICT OF COLUMBIA / MIKE BOONE
AH1901332 / CONSTRUCTION
PEPCO-WO#1588714505-ALLEN / EFF / PATRICK-CREWS WILL BE CHANGING A TRANSFORMER.
861 NEW JERSEY AVE SE   
10/09/19 
GRAYSTAR GP 11,LLC / KIM MITCHELL; NA TBD
SH1900078 / CONSTRUCTION
Phase 2 - Excavation and support of excavation within 50' of DC Water Trunk Sewer line include pile installations
1275 NEW JERSEY AVE SE 20003   
10/14/19 
BROOKFIELD PROPERTIES / null
P2000362 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE STE# 102A   
10/17/19 
SQUARE 742 LLC / STEPHEN TAYLOR; CHRIS PADBERG
B1913851 / CONSTRUCTION
Convert 'office' tenant space to 'The UPS Store'. Interior work only. minimum work done. 990 sq ft. No plumbing. Change diffusers and ceiling tiles. Install UPS furniture and add a few outlets.
1100 NEW JERSEY AVE SE   
09/26/19 
SQUARE 742 LLC / ;
P1909863 / SUPPLEMENTAL
   
10/01/19 
SQUARE 742 LLC / SUKWON KIM; SUKWON KIM; JJ ELECTRIC SERVICE, INC
SG1900513 / CONSTRUCTION
To install a set of LED channel letters "SUBWAY"
   
10/17/19 
SQUARE 742 LLC / WILLIAM SNODDY; TBD
B1915102 / CONSTRUCTION
Revision to previous permit number B1911194 Expansion of Tenant's Current suite into Adjacent Suite has already been "white boxed". Expansion space to consist only of workstation and Offices. Some Minor Demolition will occur in tenant existng suite in order to rework existing tenant entry and enlarge tenant reception. addition of storage closet will be added in place of existing corridor.
   
10/17/19 
SQUARE 742 LLC / WILLIAM SNODDY; CHRIS CONDON
B1913780 / CONSTRUCTION
Tenant Finish Out. Existing Conditions to be Demolished and New Space Built to Landlord Standards to Include new Ceiling grid lighting and Finishes **LEVEL 2 ALTERATION
   
10/21/19 
SQUARE 742 LLC / STEPHEN TAYLOR; NA TBD
B2000682 / CONSTRUCTION
Revision to existing issued permit #B1913851: Furniture layout revision, mailboxes changed location. Electrical outlets relocated per furniture changes.
1275 NEW JERSEY AVE SE   
10/03/19 
UNITED STATES OF AMERICA / JUSTIN BELLOW;
SH1900050 / CONSTRUCTION
Sheeting and shoring for new building
301 TINGEY ST SE C-1   
10/03/19 
SEFC 160, LLC / JEFF NOLD
AH2000017 / CONSTRUCTION
CCTV Inspection of sewer system. on 3rd Street SE btween Tingey St. & Water St.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.