The Office of Planning has posted the final version of its Southeast Blvd. planning study that was undertaken in early 2014 after Tommy Wells and ANC 6B found DDOT's initial designs for reconfiguring the stretch of road between 11th Street and Barney Circle decidedly lacking.
I wrote about OP's concepts after its public meeting back in December, and the designs in this final report are the same, still including elevating the road to the height of L Street directly to the north and the extensions of 13th, 14th, and 15th streets, along with varying approaches to including residential development in the median (or not) and including (or not) the underground bus parking so close to DDOT's heart.
The report reminds readers that the "purpose of this planning study was not to identify a single 'preferred alternative,' but rather to develop concepts that respond to the planning goals and objectives for the District and the community, which could be advanced through further study."
However, it goes on to say that OP has recommended developing a "hybrid concept," "based largely on the street network and development program described in Concept A, but incorporate pocket parks or other public open space interspersed throughout the new development parcels in ways that enhance the neighborhood and support the viability of new development."
And now that this study is finished, DDOT is undertaking its own feasibility study, "to determine the project development process and the economic viability of integrating the land use concepts that emerged from the Office of Planning’s (OP) Southeast Boulevard Planning Study with the transportation alternatives."
Once THAT is done, it will be all rolled into the Barney Circle-Southeast Blvd. Transportation Planning Study that began back in 2013.
In the meantime, of course, DDOT went ahead and built the road, opening it in late 2014.
I am admittedly giving short shrift to the final OP report, so if the fate of the road is of interest to you, be sure to read the whole thing, along with my post about it from last year.
Representatives of OP and DDOT will apparently be providing an update on all the Barney Circle-Southeast Blvd. studying tonight (Wednesday, July 8) at 7 pm at the Hill Center, 921 Pennsylvania Ave., SE, as part of ANC 6B's Transportation Committee meeting.
Comments (0)
   
 
 More About Southeast Blvd.

JDLand.com Home

Comments

No comments posted.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

Jscott280 on Albi Opening This: Fences up around parcel H. They are going to change the ingress points to N plac...
jdc on Albi Opening This: At 37 L, windows are going in and tower crane is gone. At Chiller site next door...
dcgent on Albi Opening This: UrbanTurf looks at what's coming housing wise for the area https://dc.urbanturf....
Shogungts on Albi Opening This: @Jason - not sure if that is the plan, but it would be nice. I went by there th...
Jason on Albi Opening This: Any news on Half Street between M and N? I've heard that it's being turned into ...
202_cyclist on Retail Roundup: When parking is further reduced, people can take metro to one of the two station...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
900 B/O 11TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 02/19/20
900 B/O M ST SE   BURGLARY
Burglary Two
 02/19/20
1200 B/O HALF ST SE   ROBBERY  02/18/20
UNIT B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/15/20
400 B/O M ST SE   ASSAULT WITH A DANGEROUS WEAPON  02/08/20
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/02/20
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/01/20
600 B/O VIRGINIA AVE SE   ASSAULT WITH A DANGEROUS WEAPON  01/29/20
1300 B/O 4TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/27/20
1100 B/O 8TH ST SE   BURGLARY
Burglary Two
 01/25/20
303 VIRGINIA AVE SE   ROBBERY  01/25/20

Recent Issued Building Permits Archive  
909 4TH ST SE   
02/12/20 
MEREDITH FASCETT / null
E2004655 / SUPPLEMENTAL
1300 4TH ST SE APT 214   
02/03/20 
null / NA NA NA
EHOP20983190 / HOME OCCUPATION
1021 5TH ST SE   
02/13/20 
KEVIN WILLIAMS / KEVIN WILLIAMS; KEVIN WILLIAMS
B2005053 / CONSTRUCTION
Apply for building permit to have final closing inspection for permit #B1602481 & B1602513 per inspector inspection report since these permits has expired.
150 I ST SE   
02/14/20 
SQUARE 737 LLC / JASON D DORRIS
AH2000818 / CONSTRUCTION
Construction of a new 13 story apartment building with three below grade parking levels, 1st floor retail, and amenity areas; 375 units and 181 parking spaces. To include mechanical, electrical, plumbing, elevators and structural work.
250 M ST SE   
02/14/20 
SQUARE 769 LLC / null
P2003901 / SUPPLEMENTAL
800 NEW JERSEY AVE SE   
01/30/20 
NEW JERSEY AT H LLC / MICHELLE GABBITAS
AH2000649 / CONSTRUCTION
Manhole rehabilitation on New Jersey, 2nd St and M St SE to repair 3 existing sewer manholes in DDOT ROW. Work will all be done through existing manholes (trenchless) and include lining, rebuilding and bypass of existing manholes.
861 NEW JERSEY AVE SE   
01/28/20 
DISTRICT OF COLUMBIA / JANE MCCRAY
AH2000647 / CONSTRUCTION
Pepco contractor, W.A.Chester, will be splicing cable on 02 / 01 / 2020 - 02 / 28 / 2020, from 9 PM - 7 AM.
1275 NEW JERSEY AVE SE 20003   
02/14/20 
BROOKFIELD PROPOERTIES / TIM GOOD
AH2000849 / CONSTRUCTION
After hours to conduct work on 1275 New Jersey Ave SE on the upcoming holiday, Presidents Day, February 17, 2020. Operations would include below grade concrete and waterproofing activities with access limited to N Street. This permit would not include extended work hours beyond the normal 7am to 7pm period.
1275 NEW JERSEY AVE SE   
01/29/20 
US GOVERNMENT / null
E2004153 / SUPPLEMENTAL
   
01/29/20 
MILLER AND LONG / WILLIAM MOORE
AH2000659 / CONSTRUCTION
Afterhours to pour concrete with pump truck from 11pm to 7am from 2 / 6 / 2020 to 3 / 6 / 2020
   
01/30/20 
UNITED STATES OF AMERICA / VINCENT J. BROWNING; VINCENT J. BROWNING
P2003449 / SUPPLEMENTAL
1-Oil / Sand interceptor
   
01/30/20 
US GOVERNMENT / null
E2004202 / SUPPLEMENTAL
   
02/07/20 
MILLER AND LONG / WILLIAM MOORE
AH2000699 / CONSTRUCTION
Afterhours to put up towercrane with mobile crane saturday 2 / 8 / 2020 and 2 / 9 / 2020 from 5am to 1159pm
1299 NEW JERSEY AVE SE   
02/18/20 
FOREST CITY SEFC LLC / STRAUCHON; SEE BELOW
BCIV1800153 / CONSTRUCTION
Phase 1A BCIV Permit Description - BCIV 1800153 - The subject BCIV permit is for the Phase IA development of Quander St SE, N Pl SE, and 1-1 / 2 St SE within the overall Forest City, Yards West (FCYW) development area which emphasizes: pedestrian-focused public realm, optimized utility corridor, fully integrated SWM design, and complete street and vision zero design. The FCYW Phase IA is comprised...
1322 PATTERSON AVE SE   
02/13/20 
JOINT BASE ANACOSTIA BOLLING - UNITED STATES NAVAL OBSERVATORY SI / TONYA HARRIS; TONYA HARRIS; TBD
BCIV2000046 / CONSTRUCTION
***FEDERAL PROPERTY*** PROJECT WILL CONSIST OF DREDGING THE EXISTING RETENTION POND AND INSPECTING AND CLEANING THE OUTLET CONTROL STRUCTURE (S1) LOCATED ON THE UNITED STATES NAVAL OBSERVATORY TO REMOVE SEDIMENT ACCUMULATION. CONTRACTOR SHALL AVOID THE CLEARING OF VEGETATION ON POND EMBANKMENTS AND SURROUNDING AREAS SO AS TO KEEP RESTORATION AND REPLANTING TO A MINIMUM.
71 POTOMAC AVE SE   
02/13/20 
MRP REALTY / JAMES VANEGAS
AH2000681 / CONSTRUCTION
Perform interior and exterior construction activities. New construction 14-story new residential multi-family building.
   
02/19/20 
RIVERFRONT HOLDINGS II, LLC / JUSTIN BISHOP; JUSTIN BISHOP
SP1900054 / CONSTRUCTION
Construct a 680 sqft concrete swimming pool inside an existing waterproofed structural box on the 14th floor. All MEP, decking and fencing work by other trades under separate permits.
227 TINGEY ST SE   
02/12/20 
GONE YARD HOTEL OWNER LLC / BOB BIROONAK; BOB BIROONAK
SG2000048 / CONSTRUCTION
one double face illuminated blade sign
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.