Since January, 2003
            
 Page Through from Before to After

I finally got my lazy self over to 11th Street with my camera this past weekend, and got quite the view of the soon-to-arrive Southeast Blvd., the reconstituted road between Barney Circle and 11th Street that runs along the path of the old sunken east end of the Southeast Freeway.
A kind official, taking a wild guess at who that old lady shooting photos of construction might possibly be, guided me in for a quick peek over the crest of the hill, eastward toward Barney Circle:
The new road will be two lanes in each direction, separated by a fair amount of non-road area, as you can see. At the new signalized intersection with 11th Street, the lanes align with the new ramps to and from the Southeast Freeway. Here's what the approach to 11th Street looked like in 2012, when the freeway still ran beneath 11th, along with the similar-but-higher-up view now. (Click to enlarge, and use the massive freeway pylons and flyover to orient yourself, especially in terms of the vertical change.)
As I have written about previously, there has been a fair amount of consternation over this road, both in terms of what some people feel is a rush to get it reopened along with much unhappiness when DDOT unveiled its initial concepts for the road's long-term design. The Office of Planning has since been working on a new set of designs to better meet a goal of reintegrating this area with the surrounding neighborhood, and last week there was a public meeting to go over these concepts, seen below and laid out in detail in the presentation slides.
When comparing these concepts to the road about to open, you can see that the general layout of the traffic lanes and available space are the same, though Concept B has just one lane in each direction just one new two-lane boulevard heading eastward while A and C have two lanes in each direction (UPDATED to fix how B is characterized). (And bike lanes! There are bike lanes!) However, all three would build up the boulevard so that it would become level with L Street, and would then allow 13th, 14th, and 15th streets to intersect with the boulevard for both vehicular and pedestrian traffic.
At right is a side view showing the proposed elevation for Concept A, running from L Street at left over to the train tracks and then down to the river.The CSX train tracks that run to the right of the road's footprints prevent further connection of these streets to M Street and the river, but there could be pedestrian bridges built to bring people across the tracks. (Note that all three concepts show the position of the planned 1333 M Street residential project just south of the boulevard.)
Two of the designs call for development within the huge median, either of low-rise multi-family buildings or townhouses or some combination thereof (at right is a rendering of the Concept A vision). The third design leaves it as a wide-open park space. And two of the three plans show the parking beneath the boulevard for buses that seems to be a requirement from DDOT's point of view.
I'm not going to go into great detail about what was said at the meeting--you can browse the presentation slides and read Capitol Hill Corner's report, which includes the many concerns of nearby residents, especially the ones who don't have much interest in connecting L, 13th, 14th, and 15th to this road.
At this stage, these truly are just concepts. There would next need to be a feasibility study/traffic flow analysis done by DDOT, an undertaking that has no timetable. There is also the issue of this land having been turned over to the city by the feds with the requirement that it be used for "transportation purposes," which raises questions about whether plopping residential buildings in the middle of it all would be an issue.
In the meantime, the new version of this road should open early in 2015.
Here's one more before-and-almost-after, looking eastward from down in the depths back in 2012 (left) and then an expanded version of the current view. Use the apartment building and retaining wall at left to orient. The embankment in the median in the "before" photo is the remnant of the ramps from the old 11th Street Bridges to and from RFK.
Comments (6)
   
 
 More About Traffic Issues

JDLand.com Home

Comments

E. Masquinongy says: (12/17/14 10:31 AM)
Awesome writeup, JD. Many thanks.


JD says: (12/17/14 10:48 AM)
Shoot, I meant to include a photo I took on Sunday from 12th and M, where you can see the difference in elevation between the new SE Blvd and the train tracks. This is the tiny version--I'll dig out a larger cropped version tonight:

link


Gamble Rogers says: (12/17/14 11:59 AM)
Totally agree with E. Masquinongy -- thanks for the great summary and links, JD. It's too bad that DDOT quietly moved ahead with plans for the freeway reopening without first completing the planning process. If DDOT started the process when they closed the old SE Freeway, the contractor could be building it now.

Any word on whether Charles Allen is interested in this issue? Based on DDOT's track record, I doubt this will move unless Allen keeps the pressure on.


JD says: (12/17/14 12:02 PM)
I said this on Twitter a little while ago--I wouldn't be surprised if this has a hard time moving forward until some developer eyes that big chunk of available land in the median and gets interested in building on it. Then people will be astonished at how fast it moves. :-)



202_cyclist says: (12/17/14 3:38 PM)
I support Concepts A and B because DC desperately needs more housing. Additionally, both Concepts A and B would help improve the feasibility of the 11th Street pedestrian bridge proposal by having more residents and activity nearby, rather than having the bridge isolated as it is now.

There are so many different moving parts to this. How would redeveloping the RFK site affect this? If done proprerly, we can have a really great section of waterfront from the Wharf development in Southwest all of the way to RFK and Kingman Island.


E. Masquinongy says: (12/18/14 10:02 AM)
All three plans show the rehabilitation of Barney Circle, reconnecting it to L Street (I think that is what it is) behind Congressional Cemetery. The new circle will interrupt straight-shot Pennsylvania Avenue that cuts through there now.

Is that really going to happen? Pennsylvania is a major commuter route that backs up pretty bad; I cannot imagine DDOT will do anything to make it worse.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

JNB on Hallo, Douglass Bridge: Hallelujah!!!!!!! https://www.facebook.com/edwardANC/photos/a.322002718410934/...
JD on Wednesday Tidbits: It's the Garrett.
202_cyclist on Wednesday Tidbits: JD-- I saw this in your listing of building permits. Is the the Garrett or is it...
202_cyclist on Wednesday Tidbits: JD-- any update on the movie theater?
AGH on Wednesday Tidbits: That is a bummer although not entirely unexpected. Now I will aim and cross fing...
jdc on Hallo, Douglass Bridge: Awesome, thanks JNB. I had not realized that request had been approved to go for...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1255 1ST ST SE   THEFT
Theft 2nd Degree (theft From Building)
 01/19/20
400 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 01/17/20
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/14/20
1100 B/O 1ST ST SE   BURGLARY
Burglary One
 01/12/20
100 B/O L ST SE   ROBBERY  01/08/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/08/20
1100 B/O 2ND PLACE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/06/20
40 N ST SE   ROBBERY  01/05/20
1100 B/O 9TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/03/20
139 N ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 01/02/20
100 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/02/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/31/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/30/19
UNIT B/O M ST SE   BURGLARY
Burglary Two
 12/30/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/29/19
UNIT B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/28/19
500 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/28/19
700 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 12/28/19
UNIT B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/27/19
300 B/O VIRGINIA AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/27/19
1220 HALF ST SE   BURGLARY
Burglary Two
 12/27/19
300 B/O WATER ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/26/19
900 B/O NEW JERSEY AVE SE   BURGLARY
Burglary Two
 12/25/19
2 I ST SE   THEFT
Theft 2nd Degree (all Other Larceny) - Highway/ Road/ Alley/ Street/ Sidewalk
 12/24/19

Recent Issued Building Permits Archive  
909 4TH ST SE   
12/30/19 
MEREDITH FASCETT / KYLE YOST
SOL2000550 / CONSTRUCTION
rooftop solar pv system, less than 4' above roof
1300 4TH ST SE 912   
01/07/20 
DEBORAH J ISRAEL / DORIS A MINOR; DORIS A MINOR
B2003615 / CONSTRUCTION
REPLACE KITCHEN CABINETS
900 5TH ST SE   
01/10/20 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / WILLIAM ANDERSON; WILLIAM ANDERSON
P2002846 / SUPPLEMENTAL
   
01/17/20 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / WILLIAM B. CRIST; WILLIAM B. CRIST
E2003759 / SUPPLEMENTAL
82 I ST SE   
01/15/20 
GDVC EYE ST LLC / MARK G. MILLS; MARK G. MILLS
E2003664 / SUPPLEMENTAL
150 I ST SE   
01/16/20 
SQUARE 737 LLC / JASON D DORRIS
AH2000499 / CONSTRUCTION
Construction of a new 13 story apartment building with three below grade parking levels, 1st floor retail and amenity areas; 375 units and 181 parking spaces. To include mechanical, electrical, plumbing, elevators and structural work.
415 I ST SE   
01/10/20 
MEGHAN E RILEY / DAEHO PARK; DAEHO PARK
P2002836 / SUPPLEMENTAL
300 M ST SE   
01/03/20 
FEDERAL CENTER LP / null
E2003217 / SUPPLEMENTAL
111 N ST SE   
01/17/20 
ALAN OWINGS / CRAIG KUBICZ
BCIV1900068 / CONSTRUCTION
The proposed construction on Parcel H consists of a new curb cut off of N Place, a guard house, and resurfacing of the eastern portion of the parking lot. The two existing storm inlets in the parking lot will be removed and replaced by a bioretention facility. DOEE SWMP No. 6343: N Place and First Street SE
861 NEW JERSEY AVE SE   
12/31/19 
CONSOLIDATED RAIL CORPQ / null
E2003162 / SUPPLEMENTAL
   
12/31/19 
DISTRICT OF COLUMBIA / JANE MCCRAY
AH2000399 / CONSTRUCTION
Pepco will be splicing cable at 861 New Jersey Avenue, SE, from 9PM to 7AM, Monday thru Friday.
   
01/03/20 
CSX TRANSPORTATION INC / SUSANA VAZQUEZ; JOHN MORIARTY & ASSOCIATES OF VIRGINIA LLC
TC2000014 / CONSTRUCTION
Tower Crane
1100 NEW JERSEY AVE SE 1ST FL   
01/06/20 
SQUARE 742 LLC / JAMES W. LASHER; JAMES W. LASHER
E2003296 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
12/30/19 
SQUARE 742 LLC / RYAN FITZGERALD; NEXIUS SOLUTIONS, INC.
AN2000023 / CONSTRUCTION
AT&T proposes to replace (3) existing antennas with (3) new antennas and install (3) new antennas.
   
01/02/20 
SQUARE 742 LLC C/O WCSMITH / PATRICIA J STAUB; CDH CONSTRUCTION INC
B2001972 / CONSTRUCTION
Provide Landlord Work (warm white shell) for Tenant buildout of 1827 SF.
   
01/07/20 
SQUARE 742 LLC / ;
P2002715 / SUPPLEMENTAL
   
01/08/20 
SQUARE 742 LLC / null
P2002765 / SUPPLEMENTAL
1275 NEW JERSEY AVE SE   
01/03/20 
MILLER AND LONG / WILLIAM MOORE; MILLER LONG
TC2000016 / CONSTRUCTION
towercrane for jobsite use 1 / 25 / 2020 to 1 / 25 / 2021
71 POTOMAC AVE SE   
01/15/20 
RIVERFRONT HOLDINGS I, LLC / null
E2003671 / SUPPLEMENTAL
   
01/17/20 
MRP REALTY / JAMES VANEGAS
AH2000410 / CONSTRUCTION
Perform interior and exterior construction activities. New construction 14-story new residential multi-family building. **No loud equipment is to be used until 9am on this day.
355 WATER ST SE   
12/30/19 
UNITED STATES OF AMERICA / KELSI EVANS
TN2000035 / CONSTRUCTION
1 40' x 80 tent
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.