Since January, 2003
            
 Sliding from Before to After

I was a bit skeptical when I got the heads up that construction "had started" on the 321-unit first phase apartment building at the old Florida Rock site (which I guess we're eventually going to have to start calling The Riverfront). Even with a ceremonial groundbreaking coming in a few weeks, the twists and turns on this project over the past decade left me scarred enough to want to really see some movement before I believed it could finally be happening.
So let's compare the site as seen back in June, and then yesterday (click to enlarge, as always):
Or, heck, let's go from an ugly day in December 2005 to June 2014 to November 2014 to what it should look like when built:
(And now you know why I try to always wait for the most glorious of sunny days to take photos. Also, thank heavens for the Teague pier vantage point, allowing me to shoot northward-facing photos instead of just ones from Potomac Avenue.)
Ground was definitely being moved on Saturday, as you can see in these not-really-full-of-action action photos:
Construction of this first phase is expected to take about two years. And it should include a plaza and ground-floor retail alongside Diamond Teague Park. You can actually see in the pattern of the digging in the photo at top right the building footprint versus the plaza footprint--the project was required to keep the view from the ballpark's grand staircase out to the river.
Comments (2)
   
 
 More About Florida Rock

JDLand.com Home

Comments

G Street says: (11/18/14 4:13 PM)
Hard hats + cranes = A new and improved JDLand


DAK4Blizzard says: (11/20/14 1:09 PM)
It took until the middle of the next decade, but the digging has begun! Hopefully those postponement scars will heal. Hats off to JD for the photos. I'm sure you've been eagerly waiting to do a complete timeline for this site. Finally, that process can truly begin.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

CJBabyDaddy on Inching from Quarantining: Serious workplace accident on the ground this morning at the Chemonics construct...
MJM on Inching from Quarantining: Welcome to the neighborhood Pivot Physical Therapy. Its located behind Sprint (w...
VelocityChris on Inching from Quarantining: How quickly Juice Laundry and Whaley's were replaced bodes well!
conngs0 on Inching from Quarantining: 202, I couldn't agree more re the GNC. It's tough though - retail seems to need...
202_cyclist on Inching from Quarantining: The GNC on Tingey Street is closing. I am sorry for the employees who are losin...
tmich93 on Inching from Quarantining: CVS on the corner of I and Half seems like it's nearly completely stocked. I'd a...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O 1ST ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/25/20
1200 B/O SOUTH CAPITOL ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 06/23/20
1200 B/O NEW JERSEY AVE SE   ASSAULT WITH A DANGEROUS WEAPON
Assault W/i To Kill
 06/20/20
1000 B/O 3RD PLACE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/20
800 B/O SOUTH CAPITOL ST SE   ASSAULT WITH A DANGEROUS WEAPON  06/14/20
400 B/O M ST SE   THEFT
Shoplifting
 06/12/20
1000 B/O M ST SE   ROBBERY
Unarmed Carjacking
 06/09/20
UNIT B/O M ST SE   ASSAULT WITH A DANGEROUS WEAPON  06/07/20
1200 B/O 1ST ST SE   BURGLARY
Burglary Two
 06/03/20
200 B/O M ST SE   BURGLARY
Burglary Two
 05/30/20
900 B/O 1ST ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/27/20

Recent Issued Building Permits Archive  
150 I ST SE   
06/09/20 
SQUARE 737, LLC C/O WC SMITH / MIMI TRIGGER; MIMI TRIGGER
SP1900051 / CONSTRUCTION
Installation of (2) prefabricated hot tubs on the roof.
300 M ST SE   
06/02/20 
FEDERAL CENTER LP / null
P2006421 / SUPPLEMENTAL
   
06/02/20 
FEDERAL CENTER LP / null
M2002616 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
06/10/20 
CXS TRANSPORTATION INC / ;
P2006604 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
06/10/20 
SQUARE 742 LLC, C/O SPAULDING & SLYE/STE 100, / PAUL WHITLEY
AN1900284 / CONSTRUCTION
PROJECT CONSISTS OF: REMOVING: (2) EXISTING EQUIPMENT CABINETS, (3) EXISTING ANTENNA'S, (1) EXISTING RRU'S AND ANCILLARY EQUIPMENT / CABLE AND INSTALLING: (6) PROPOSED ANTENNA'S, (3) PROPOSED RRU'S, AND(2) PROPOSED EQUIPMENT CABINETS ON AN EXISTING TELECOM FACILITY
1105 NEW JERSEY AVE SE   
06/03/20 
KRISTA ASHSHAHEED / null
E2008140 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE   
06/03/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / ;
P2006475 / SUPPLEMENTAL
1275 NEW JERSEY AVE SE   
06/02/20 
UNITED STATES OF AMERICA / ;
P2006429 / SUPPLEMENTAL
125 O ST SE   
06/05/20 
DISTRICT OF COLUMBIA / BILL SAUNDERS; TBD
B2006271 / CONSTRUCTION
BFPE International will furnish the fire alarm equipment, shop drawings, product data and calculations for the new fire alarm devices being installed at DCWater Main Pumping Station, Washington, DC 20032. This project will be a one for one replacement of panels, addressable and notification devices.
   
06/09/20 
DISTRICT OF COLUMBIA / null
E2008311 / SUPPLEMENTAL
227 TINGEY ST SE   
06/04/20 
UNION INVESTMENT REAL ESTATE GMBH / null
E2008212 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.