Since January, 2003
            
 Page Through from Before to After

The fate of Forest City's planned movie theater, residential, and retail project on the east side of 1st Street near Nats Park has remained stalled while DC Water works to find a suitable spot to relocate some (but not all) of its activities.
There has been no public news of a new site, but the DC government has announced that there will be a public meeting on Nov. 20 at 6:30 pm "to receive public comments on the proposed surplus" of a portion of the DC Water site, which presumably includes all or some of the footprint of the Forest City planned development.
The meeting announcement also contains this string of caveats:
"Because DC Water will continue to occupy the Property while pre-development is ongoing, declaration of the Property as surplus will be conditioned on (i) DC Water receiving rights to occupy suitable relocation/replacement property(ies), (ii) available funding for activities necessary to allow DC Water to relocate to and operate on such relocation/replacement property(ies) and (iii) approval by an independent engineer procured by DC Water of an operational plan during and after relocation."
The meeting is at the Boilermaker Shops at 3rd and Tingey, in Unit 140 (the empty space next to Nando's). In addition, written public comments will be accepted until Nov. 25.
If you're just joining us, it was a smidge over two years ago that news first started bubbling up that Forest City was looking to bring a "high-quality theater operator" to a six-acre portion of the DC Water site. In November 2012 the potential operator was revealed to be Showplace Icon, and in 2013 the plans for the entire site went through the Zoning PUD fun factory, and were approved late in the year.
The first phase of the project, which received Stage 2 PUD approvals from the Zoning Comission, will be the movie theater, a two-story 16-screen offering, built above a four-story parking structure, located at a new intersection of N Place SE and the to-be-built 1 1/2 Place.
The rest of the project envisions two residential buildings totaling 600 units, built along 1st Street directly across from the ballpark. with the facade of the existing red brick building at the corner of 1st and N Place preserved and incorporated into one of the buildings. Potomac Avenue would be extended eastward to the new 1 1/2 Place, and Diamond Teague Park would be expanded northward. There would also be a minimum 40,000 square feet of retail.
But all of this has to wait until DC Water can find a suitable new home for some of the operations that currently live at 125 O Street SE.
It's also worth noting with each post on this project that DC Water will not be departing the site completely--the beautiful historic Main Pumping Station building will keep right on pumping, as will the less-beautiful and less-historic O Street Pumping station. In addition, earlier this year DC Water solicited bids for the design of a new headquarters building, which would bring the agency's HQ from Blue Plains to a space on top of the O Street station.
Comments (1)
   
 
 More About DC Water (WASA)

JDLand.com Home

Comments

JD says: (11/5/14 12:05 PM)
By the way, on another development subject, we had some discussion recently about progress on the Homewood Suites at 50 M. I had mentioned that I was sure that they had filed for a shoring/sheeting/excavation permit, but that I wasn't seeing it. There was indeed a glitch in the permit application database, and that application is now visible again (though not yet approved). And in the last week or two a Foundation permit has been applied for. So....

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

CJBabyDaddy on Roundup of Some: @WestNorth: Methinks the proposed land swap involves/involved Navy Yard waterfr...
conngs0 on Roundup of Some: Cool news about the museum. It'll be interesting to see how it progresses from ...
Westnorth on Roundup of Some: Navy Museum is fundraising for a $450M new spot outside the Navy Yard gates, for...
VelocityChris on Roundup of Some: They're adding two floors to the top of the WeWork building.
GarfieldPark on Roundup of Some: Anyone know what is happening on First st outside of WeWork bldg? They are doing...
right-toe on Roundup of Some: Lots of little changes around: Sidewalk has opened up around the DDOT building,... [image]
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O HALF ST SE   ROBBERY  10/21/20
UNIT B/O K ST SE   THEFT
Theft First Degree (all Other Larceny)
 10/20/20
900 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/15/20
600 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/13/20
UNIT B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/12/20
1000 B/O 1ST ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/12/20
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/09/20
1000 B/O 8TH ST SE   ROBBERY
Armed Carjacking
 10/09/20
400 B/O M ST SE   THEFT
Theft 2nd Degree - Felony (theft From Building)
 10/07/20
900 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/01/20
1000 B/O 3RD ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/30/20
UNIT B/O K ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/29/20
1100 B/O 2ND PLACE SE   ROBBERY
Assault W/i To Commit Robbery (simple Assault)
 09/28/20
1000 B/O 4TH ST SE   ROBBERY
Carjacking
 09/26/20
1200 B/O HALF ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/22/20
600 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/21/20

Recent Issued Building Permits Archive  
1108 3RD ST SE   
10/06/20 
JULIANA DUFFY / null
E2100156 / SUPPLEMENTAL
915 5TH ST SE   
10/14/20 
RYAN DANIELS / FERNANDO A ANGULO; RYAN DANIELS
B2012669 / CONSTRUCTION
Partial floor joists replacement on first floor. replace 6 feet height wooden fence and gate. add protective coating to partial foundation wall.
1031 5TH ST SE   
09/30/20 
CLARICE GEE / null
P2009304 / SUPPLEMENTAL
150 I ST SE   
10/09/20 
SQUARE 737 LLC / JASON D DORRIS
AH2100047 / CONSTRUCTION
Construction of a new 13 story apartment building with three below grade parking levels, 1st floor retail and amenity areas; 373 units and 181 parking spaces. To include mechanical, electrical, plumbing, elevators and structural work.
   
10/15/20 
SQUARE 737 LLC / BOB BIROONAK; BOB BIROONAK
SG2000458 / CONSTRUCTION
one directional double face non illuminated sign
100 M ST SE   
09/25/20 
LHREV WASHINGTON M STREET LLC / THUY LE; NA
B2010745 / CONSTRUCTION
Suite 950 - Interior alteration. Work is to include minor change in MEP and Fire. No Structure.
139 N ST SE   
10/08/20 
null
SH2000028-EXT-1 / CONSTRUCTION
Original Permit expires 4 / 15 / 2021, 1st extension expires 10 / 15 / 2021
861 NEW JERSEY AVE SE   
10/13/20 
CXS TRANSPORTATION INC / null
P2100338 / SUPPLEMENTAL
125 O ST SE   
10/02/20 
DISTRICT OF COLUMBIA / null
M2100033 / SUPPLEMENTAL
71 POTOMAC AVE SE   
10/15/20 
RIVERFRONT HOLDINGS II, LLC / OLUSOLA PYNE
B2100519 / CONSTRUCTION
Shipping Container placement on lot for exterior use.
227 TINGEY ST SE   
09/30/20 
FC 227, LLC / BRIAN QUINN
B2011139 / CONSTRUCTION
Conversion of apartment unit to model unit.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.