Since January, 2003
            
 Sliding from Before to After

A few tidbits to throw your way, but first let's start off with one of my favorite photos, taken eight years ago yesterday while standing at 1st and M. You can see more shots from Sept. 17, 2006 in the archive.
* UNLEASHED BY PETCO: It was rumored back in May, and there's still been no official announcement from Forest City, but a building permit issued last week seems to be the final confirmation that Unleashed by Petco is coming to the Boilermaker Shops.
* CSX: The Post reports that "It could be a few weeks before the Federal Highway Administration releases a decision on the proposed expansion of the Virginia Avenue Tunnel in Southeast Washington." The "Record of Decision" hasn't yet been finalized. In the meantime, the Committee of 100 has let it be known that any decision short of an indefinite delay will result in a lawsuit. (Shocker!)
* HALF STREET: WBJ talks to new Half Street poobah Jair Lynch about his group's plans for the Half Street hole, now that they've bought it from Monument Realty. "While the project is expected to remain a mix of residential, retail and hotel, Lynch said he is now considering condos in addition to apartments, tweaking unit sizes, adding green features and amenities and bringing in a 'completely different retail mix.'" (Longtime area observers note that in Monument's original plans, the two residential buildings at the south end of the block were planned to be condos and apartments. And of course it's easy to "change" the retail mix when there isn't any to begin with.) They hope to get underway by 2016, WBJ says.
* MLB LATE NIGHT WITH METRO: WTOP: "Although the Washington Nationals have clinched the NL East, the team has not reached a deal with Metro to keep trains running past midnight during home playoff games." The Metro policy is that the Nationals would have to pay at $29,500 deposit to stay open an extra hour during the week; some of you may remember that back in 2012, the Nats did not step forward to pay, so Livingsocial offered to foot the bill.
Comments (6)
   
 
 More Recent News

JDLand.com Home

Comments

Westnorth says: (9/18/14 1:38 PM)
Still interesting to see that they're changing up the retail layouts. Sounds like they plan fewer sports bars and perhaps more space for soft goods. None of their retail footprints were large enough to house even 20,000-foot "junior anchors," even though there's big box interest in the South Capitol corridor.


JES says: (9/18/14 3:06 PM)
If the Nats clinch the 1 seed in the NL (go nats!), MLB will actually have very little to worry about because of how the schedule falls. The NLDS first two home games would be on a Friday and Saturday (with Game 5 if necessary on a Thursday), the NLCS games would fall on two Sat/Sun weekends with the 3 games at the lower seed during the week. And because of the stupid All Star Game determining home field in the World Series, the three NL games are a Fri through Sun. So home games for the top NL seed for over half of the NL playoffs would be on Fridays and Saturdays: link


JD says: (9/18/14 3:10 PM)
I think that's how it ended up working out last time, that despite all the sturm und drang it ended up never being needed.


JES says: (9/18/14 3:34 PM)
Well, last time, we made a bit of a hasty exit..... who knows how the latter rounds would have played out.


Edna says: (9/19/14 9:44 AM)
Well said, JD, on Jair Lynch. What a bunch of developer nonsense-talk!


Chococar says: (9/19/14 11:10 PM)
I see the obstructionists are still trying to block the CSX tunnel. The narrow old tunnel that is there now, is an accident waiting to happen. This all politics. The lamest excuses are being made to stop this project. In 3 years it will be finished and the residents can live in peace, again. The longer this is held up, the pain will just be felt further down the road.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

jdc on Roundup of Some: Being able to walk to Silver Diner is nice. I miss my routine of taking the morn...
JES on Roundup of Some: omg i would kill for a silver diner...
conngs0 on Roundup of Some: sharksfansd, I agree the Peet's closure is a shame as it was a solid option. No...
sharksfansd on Roundup of Some: Such a bummer about Peet's, as it was my go to instead of the other large coffee...
GG on Roundup of Some: So what’s the story with the CVS at Half and I? It’s looked fully stocked and r...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
100 B/O I ST SE   THEFT
Theft First Degree (all Other Larceny)
 07/30/20
100 B/O O ST SE   ASSAULT WITH A DANGEROUS WEAPON  07/28/20
400 B/O M ST SE   THEFT
Shoplifting
 07/24/20
100 B/O M ST SE   BURGLARY
Burglary Two
 07/20/20
UNIT B/O N ST SE   ASSAULT WITH A DANGEROUS WEAPON  07/20/20
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (theft From Building)
 07/13/20
900 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/09/20
1500 B/O 1ST ST SE   SEX ABUSE
Assault W/intent To Commit First Degree Sexual Abuse (force) (rape)
 07/08/20
400 B/O K ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/06/20
1200 B/O HALF ST SE   THEFT
Theft First Degree (all Other Larceny)
 07/05/20
100 B/O H ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/03/20
100 B/O O ST SE   ROBBERY  07/03/20

Recent Issued Building Permits Archive  
1300 4TH ST SE 1001   
07/22/20 
LA FAMOSA / null
E2009613 / SUPPLEMENTAL
1300 4TH ST SE 130   
07/24/20 
TOM AN / KIMOY LALLEMENT
A2005055 / CONSTRUCTION
New sail shade awning at exterior private space of La Famosa restaurant (Permit #TL2000028)
900 5TH ST SE   
07/13/20 
null
B1906215-EXT-1 / CONSTRUCTION
1ST EXTENSION TO B1906215, EXTENSIOIN WILL EXPIRE ON 03 / 01 / 2020. ORIGINAL SCOPE: Reconstruction of 4-story residential building, the Arthur Capper Senior Center, damaged by fire.
1150 5TH ST SE   
07/08/20 
DISTRICT OF COLUMBIA / CASEY STRINGER; NA
B2008863 / CONSTRUCTION
DGS PROJECT Minor interior classroom renovations at existing school
   
07/16/20 
DISTRICT OF COLUMBIA / null
P2007453 / SUPPLEMENTAL
   
07/22/20 
DISTRICT OF COLUMBIA / null
E2009571 / SUPPLEMENTAL
10 I ST SE   
07/27/20 
CAPITOL HILL RACQUET CLUB / ANDREW ARNOLD; NA
SB2000413 / CONSTRUCTION
We propose drilling two (2), six-inch diameter geotechnical test borings (B-7 and B-8) using the hollow stem auger method to evaluate the subsurface conditions. The proposed test boring depths will be 85 feet below the existing ground surface. If a confining unit is encountered, outer casing will be installed which will extend 10 feet into the top of the confining unit or to the top of bedrock. Up...
423 L ST SE   
07/24/20 
JOHN P LANG / MARGO RICKS
SOL2001665 / CONSTRUCTION
To install 4.56 kW size of solar panels with a system height of 1.1 feet on roof of building.
250 M ST SE   
07/10/20 
SQUARE 769 LLC / null
E2009225 / SUPPLEMENTAL
   
07/21/20 
SQUARE 769 LLC / null
E2009527 / SUPPLEMENTAL
300 M ST SE   
07/27/20 
FEDERAL CENTER LP / null
E2009758 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
07/23/20 
GREYSTAR GP LLC / null
M2003144 / SUPPLEMENTAL
1105 NEW JERSEY AVE SE   
07/23/20 
GALLERY CAPITAL RIVERFRONT PROPERTY LLC / null
E2009620 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE   
07/08/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
M2002985 / SUPPLEMENTAL
1200 NEW JERSEY AVE SE 20590   
07/14/20 
JBG/FEDERAL CENTER LLC / SAM HOLLEN
B2006851 / CONSTRUCTION
INTERIOR RENOVATION TO 1ST FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MECHANICAL, ELECTRICAL AND LIFE SAFETY. NO PLUMBING. NO STRUCTURAL. 1700 SQUARE FEET. GSA / DOT
1275 NEW JERSEY AVE SE   
07/13/20 
FC 1275 NJ, LLC / PARKER HARRELL
SB2000382 / CONSTRUCTION
We are abandoning 14 gravel packed dewatering wells and one piezometer. All pumps and associated hardware will be removed from the wells. Each well casing will then be removed of perforated. We will then tremie each borehole using a bentonite slurry (two pounds bentonite powder to one gallon water).
1033 O ST SE 20374   
07/13/20 
UNITED STATES OF AMERICA / STANELY CARPENTER; JILL S CUTLER
BCIV2000111 / CONSTRUCTION
Install a safety shower and eye-wash station with a concrete base at the hazardous waste storage area near Building 166 at the Washington Navy Yard.
79 POTOMAC AVE SE 505   
07/15/20 
null / NA NA NA
EHOP20993669 / HOME OCCUPATION
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.