The process continues to create the 11th Street Bridge Park, with the announcement on Tuesday of the four teams picked for the final stage of the design competition.
The park, which will use the piers still standing after the demolition of the old outbound 11th Street Bridge, would create a new type of connection between the east and west sides of the Anacostia River, and is described by its supporters as "an iconic new civic space that will provide a unique venue supporting the community’s environmental, economic, cultural and physical health."
The design teams chosen are made up of landscape architects, architects, and structural engineers, and have been given $25,000 to create their submissions. The teams are:
• Balmori Associates / Cooper, Robertson & Partners / Guy Nordenson Associates
• OLIN / OMA / Arup
• Stoss Landscape Urbanism / Höweler + Yoon Architecture / Robert Silman Associates
• Wallace Roberts & Todd (WRT) / NEXT Architects / Magnusson Klemencic Associates
The park's jury expected to choose a final design this fall.
And on June 10, members of the public will be able to hear from the four teams (one of which includes OLIN, designers of Canal Park) The event runs from 6:30 to 8 pm at THEARC, 1901 Mississippi Ave., SE.
In the meantime, fundraising continues for the project, which could cost around $40 million for both construction and operations. Earlier this month council member and transportation committee chair Mary Cheh inserted into the city budget currently under deliberation $14.5 million over the next three years to partially fund the project. (This money is apparently coming from the city's decision to go with a fixed-span new Douglass Bridge rather than replacing the swing span, which is saving about $140 million.) The rest of the construction financing would be raised from private sources. In addition, about $840,000 has been raised toward the $1 million "pre-capital campaign goal."
Comments (2)
   
 
 More About bridgepark

JDLand.com Home

Comments

Gamble Rogers says: (5/29/14 2:14 PM)
It's incredible to see how far Scott Kratz and friends have taken this concept in such a short amount of time. If they can pull this off, it would be a major win for Wards 6 and 8. Historic Anacostia really should be a vibrant commercial corridor, considering its proximity to the heart of the city relative to other thriving areas. The bridge park investment would be a great catalyst to drive development.

The only drag is it would highlight just how nice Anacostia Park is for the rest of D.C.! When we ride or run over there, we mostly see geese and an occasional walker. This park would change that in a hurry.


conngs0 says: (5/29/14 4:33 PM)
There's still a very long way to go, but I totally agree that it's a pleasant surprise that the project has gotten this far so quickly.

But what an opportunity to help segue the progress in the Waterfront and Navy Yard areas across the river! It's going to take a heck of a design to rise to that challenge though (in addition to more commitment to making both sides of the bridge more appealing and accessible!).

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

Westnorth on I'm Dreaming of: XO sauce is fish-based, as with many Cantonese sauces: https://en.wikipedia.org/...
NavyYardGuy on I'm Dreaming of: @hamburgular --I had the XO spaghetti last week too VERY fishy taste -- they sai...
Hamburglar on I'm Dreaming of: I took my wife over to try out ABC Pony for dinner. Be careful with the SPAGHET...
JD on I'm Dreaming of: And, has no one noticed the cool slideshows I've now added to the top of the hom...
RMP on Wednesday Tidbits: What's the deal with the makeshift front desk at Guild (a guy with a laptop at a...
conngs0 on Wednesday Tidbits: They might have chocolate covered donuts too. Or if the weather is good, just ge...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
No records added or modified in the past two weeks.

Recent Issued Building Permits Archive  
1402 1ST ST SE   
11/25/19 
UNITED STATES OF AMERICA / DAVID C POSTLEWAITE
SB1900412 / CONSTRUCTION
Parcel G2:WSP will complete four borings up to the deepest potential subgrade elevation (approx. 32 ft. bgs). The proposed boring locations would be in the four quadrants of Parcel G2 to check for spatial variability in contaminant concentrations. WSP will collect and analyze three soil samples from each boring from depths corresponding to potential subgrade elevations (i.e. 10-12 ft. bgs, 20-22 ...
1331 2ND ST SE   
11/08/19 
DC WATER / CRAIG M COOK
B1907684 / CONSTRUCTION
Flood mitigation, seal openings, install brackets for stop logs, replace elevator shaft with concrete slab.
1212 4TH ST SE   
11/25/19 
FC 1212 LLC / TAMIKA STATON; OTIS
ER2000409 / SHOP DRAWING
Replace governor car #2 - Part #: TBA20641H6 Replace hoist belts #1 and #4 - Part #: SB0003119
1300 4TH ST SE   
11/15/19 
ASANA PARTNERS / DEBRA MARSHALL; THE DONOHOE COMPANIES INC
B2001773 / CONSTRUCTION
ADD EXTERIOR DOOR, ADD INTERIOR DOOR , ANY RELAYED,ELECTRICAL,PLUMBING, RELOCATING UNBUILT APPROVED NON LOAD BEARING FIRE RATED PARTITIONS @ FIRST FLOOR APPROVED UNDER PERMIT #B1711970. ATTACHED
300 M ST SE   
11/11/19 
FEDERAL CENTER LP / null
P2001215 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
11/15/19 
CSX TRANSPORTATION INC / ERICKA CLARK; DGS CONSTRUCTION
TC2000008 / CONSTRUCTION
(2) tower cranes
   
11/26/19 
GREYSTAR GP I I, LLC / KIM MITCHELL; KIM MITCHELL
FD1900040 / CONSTRUCTION
TWO BELOW GRADE PRKING LEVELS, CONCRETE FOUNDATION WALLS, SLAB ON GRADE, COLUMNS ELEVATED DECKS UP TO GRADE WITH UNDERGROUND UTILITIES (MECHANICAL, PLUMBING, ELECTRICAL)
1111 NEW JERSEY AVE SE   
11/15/19 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / TANYA HILL; THYSSENKRUPP
ER2000366 / SHOP DRAWING
REPLACE EXISTING 8MM WORN HOIST CABLES WITH LIKE IN KIND ON ELEVATOR #4. WORK TO ALLOW UNIT TO BE RETURNED TO SERVICE.
1299 NEW JERSEY AVE SE   
11/12/19 
BROOKFIELD DEVELOPMENT / JUSTIN BELLOW
BP2000489 / POST CARD
125 O ST SE   
11/25/19 
DISTRICT OF COLUMBIA / DAVID C POSTLEWAITE
SB1900411 / CONSTRUCTION
WSP will complete three borings up to the deepest potential subgrade elevation (approx. 32 ft. bgs). WSP assumes that borings will not be installed inside the fleet maintenance facility due to access restrictions imposed by DC Water. The proposed boring locations form an ‘L’ shape around the eastern and southern sides of the fleet maintenance facility. WSP will collect and analyze three soil samp...
71 POTOMAC AVE SE   
11/08/19 
RIVERFRONT HOLDINGS II, LLC / JAMES VANEGAS
AH2000075 / CONSTRUCTION
Perform interior and exterior construction activities. New construction 14-story new residential multi-family building.
201 TINGEY ST SE   
11/14/19 
BROOKFIELD PROPERTIES / DFM DEVELOPMENT SERVICES, LLC
AH2000197 / CONSTRUCTION
Afterhours work at Tingey Square Project. The work performed will be forming, prepping and paving at Tingey Square park. Friday and Saturday the 15th & 16th, from 7PM to midnight. If required, Sunday the 17th from 7AM to 3PM. ANC Support provided. Associated Permit Include PA328164-R1 and PA10760162.
227 TINGEY ST SE   
12/02/19 
FC 227 LLC / KAYLA SHATTUCK; BROOKFIELD PROPERTIES MANAGEMENT LLC.
RW1900122 / CONSTRUCTION
Construction of new retaining wall located between Canal Street St and Third Street, SE.
300 TINGEY ST SE   
12/04/19 
FC BOILERMAKER LLC / ROBERT S. WATTS; ROBERT S. WATTS
E2002289 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.