Since January, 2003
            
 Page Through from Before to After

With the sun finally coming out, it shouldn't be surprising that I took camera in hand on both Saturday evening and Easter Sunday and did some wandering to catch up with the progress at two locations, and to get shots of a few new items I hadn't yet documented.
The old 225 Virginia, on its way to becoming 200 I (boo), is now almost completely disrobed. (I think I'll go with that from now on rather than "deskinned.") It's been such a monolith for so many years that it's strange to see it broken up. You can take a virtual walk around the block to see how the old Star/Post plant looked before along with its current state, and visit my 225 Virginia project page for more info and background. (If you haven't been following along, by this time next year 200 I is expected to be nearly complete, with three DC city agencies on the boards to move there.)
Just to the southwest, work continues on the first block(s) in the second phase of the Capitol Quarter mixed-income townhouse development, with bricking proceeding on the new houses along I Street while framing has made it around and up the new 3rd Place; plus, foundations have now been poured along 4th Street. Here's your walk around the block to be reminded of the old public housing units that stood there for a long time and to compare them with the construction going on now. For more information, see my Capper and Capitol Quarter project pages.
(If you want to see just the new photos taken Sunday, here they are in one batch.)
Meanwhile, down at the Yards Park, the flowers are in bloom, a geodesic dome that looks like the Earth is hosting foodies, and work appears to have begun on the floating bridge that will connect the Yards Park to Diamond Teague Park (right by Nationals Park) later this year. You can see my quick gallery of photos showing these items, along with a picture of the sign laying out the rules for using the Navy Yard portion of the riverwalk (since it was Saturday, I could only stand forlornly at the gate and look eastward), plus the progress on the Foundry Lofts building just to the north of the park. And some shots of the Navy Yard buildings that are adjacent to the park, just because I like being in a spot where I can take photos of them without having guards chase me down the street.
Comments (3)
   
 
 More About Capper

JDLand.com Home

Comments

mikescorpio says: (5/4/11 8:25 PM)
The "re-skinning" of the old Star/Post plant has begun on the 3rd St side.


JD says: (5/4/11 8:27 PM)
No, no, it's getting dressed again! :)


mikescorpio says: (5/8/11 8:21 PM)
"Re-skinning" does kind of sound like something from a sci-fi movie!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

CJBabyDaddy on Inching from Quarantining: Serious workplace accident on the ground this morning at the Chemonics construct...
MJM on Inching from Quarantining: Welcome to the neighborhood Pivot Physical Therapy. Its located behind Sprint (w...
VelocityChris on Inching from Quarantining: How quickly Juice Laundry and Whaley's were replaced bodes well!
conngs0 on Inching from Quarantining: 202, I couldn't agree more re the GNC. It's tough though - retail seems to need...
202_cyclist on Inching from Quarantining: The GNC on Tingey Street is closing. I am sorry for the employees who are losin...
tmich93 on Inching from Quarantining: CVS on the corner of I and Half seems like it's nearly completely stocked. I'd a...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O 1ST ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/25/20
1200 B/O SOUTH CAPITOL ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 06/23/20
1200 B/O NEW JERSEY AVE SE   ASSAULT WITH A DANGEROUS WEAPON
Assault W/i To Kill
 06/20/20
1000 B/O 3RD PLACE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/20
800 B/O SOUTH CAPITOL ST SE   ASSAULT WITH A DANGEROUS WEAPON  06/14/20
400 B/O M ST SE   THEFT
Shoplifting
 06/12/20
1000 B/O M ST SE   ROBBERY
Unarmed Carjacking
 06/09/20
UNIT B/O M ST SE   ASSAULT WITH A DANGEROUS WEAPON  06/07/20
1200 B/O 1ST ST SE   BURGLARY
Burglary Two
 06/03/20
200 B/O M ST SE   BURGLARY
Burglary Two
 05/30/20
900 B/O 1ST ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/27/20

Recent Issued Building Permits Archive  
150 I ST SE   
06/09/20 
SQUARE 737, LLC C/O WC SMITH / MIMI TRIGGER; MIMI TRIGGER
SP1900051 / CONSTRUCTION
Installation of (2) prefabricated hot tubs on the roof.
300 M ST SE   
06/02/20 
FEDERAL CENTER LP / null
P2006421 / SUPPLEMENTAL
   
06/02/20 
FEDERAL CENTER LP / null
M2002616 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
06/10/20 
CXS TRANSPORTATION INC / ;
P2006604 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
06/10/20 
SQUARE 742 LLC, C/O SPAULDING & SLYE/STE 100, / PAUL WHITLEY
AN1900284 / CONSTRUCTION
PROJECT CONSISTS OF: REMOVING: (2) EXISTING EQUIPMENT CABINETS, (3) EXISTING ANTENNA'S, (1) EXISTING RRU'S AND ANCILLARY EQUIPMENT / CABLE AND INSTALLING: (6) PROPOSED ANTENNA'S, (3) PROPOSED RRU'S, AND(2) PROPOSED EQUIPMENT CABINETS ON AN EXISTING TELECOM FACILITY
1105 NEW JERSEY AVE SE   
06/03/20 
KRISTA ASHSHAHEED / null
E2008140 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE   
06/03/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / ;
P2006475 / SUPPLEMENTAL
1275 NEW JERSEY AVE SE   
06/02/20 
UNITED STATES OF AMERICA / ;
P2006429 / SUPPLEMENTAL
125 O ST SE   
06/05/20 
DISTRICT OF COLUMBIA / BILL SAUNDERS; TBD
B2006271 / CONSTRUCTION
BFPE International will furnish the fire alarm equipment, shop drawings, product data and calculations for the new fire alarm devices being installed at DCWater Main Pumping Station, Washington, DC 20032. This project will be a one for one replacement of panels, addressable and notification devices.
   
06/09/20 
DISTRICT OF COLUMBIA / null
E2008311 / SUPPLEMENTAL
227 TINGEY ST SE   
06/04/20 
UNION INVESTMENT REAL ESTATE GMBH / null
E2008212 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.