Since January, 2003
            
 Sliding from Before to After

Despite having arrived fashionably late to tonight's ANC 6B ABC committee meeting, I still managed to get there in time to hear the initial presentation by Mark Brody on his plans for the "Bavarian Beer Garden" that he is looking to bring to the currently vacant northwest corner of 8th and L, SE. (This is the "Saints and Sinners" block, which is also going to have the National Community Church's new operations on the Miles Glass site on the north end of the block.)
As I've written previously, he and his business partner (who has owned the property for more than 20 years--Brody appears to have bought a half-interest in the lots earlier this year for $600,000, according to property records) are applying for a liquor license for a tavern/beer garden that would seat 99 customers inside, with space for another 200 outside in the summer garden. They're looking to be open from 11 am to 2 am Sunday through Thursday, and until 3 am on Friday and Saturday, with the hours of alcohol sales matching those "open" hours. They also want to have live entertainment (oompah! oompah!) from noon to midnight on Sunday, 6 pm to midnight Monday through Friday, and noon to 2 am on Saturday. Brody said it would be "upscale," with beer running around $7, and there would be food, though no menu has been determined yet.
Brody brought no drawings or designs, but said they would put a newly constructed building along 8th Street, with the entrance on the corner, and the beer garden would be behind it, butting up against the driveway from Miles Glass that punches through to L Street. (Brody and his partner own the two small buildings on the west side of the driveway.) Brody suggested that having a large nightlife offering south of the freeway would help pull people south on 8th, and make them less reticent to use the parking lot beneath the freeway (which tied into the discussion around the previous agenda item, another restaurant in the 500 block of 8th). He also mentioned the large surface parking lots that exist nearby that would have more than enough capacity to hold the large number of patrons his plans are for, though certain bloggers in the audience mentioned that the big one at 7th and L is probably going to see construction start on its north portion before too much longer.
There was considerable skepticism from the commissioners (especially chair David Garrison) when Brody said that he hopes to be up and running "by spring," especially since the lot is in the historic district and he would still need all of his designs approved by the Capitol Hill Historic Society and the city's Historic Preservation Review Board, as well as go through the not-always-smooth building permitting process.
He and his partner (who is in construction) are looking at building a smaller "temporary" building now, with a more permanent three- or four-story structure to come later. But when the commissioners expressed their concern about having very little to go on in terms of design and concept before they make a decision as to whether to support the liquor license application, Brody said that he and his partner won't be building anything without getting the license first.
Commissioners also mentioned "Heart and Soul" a few times, which Hill veterans will remember as the venture at 8th and Pennsylvania that got its approvals as a restaurant with some live entertainment and turned into a nightclub that became a nightmare for residents. "What you're giving me screams 'nightclub,' " said 6B05 rep Ken Jarboe.
Neil Glick of 6B08 talked about the size of the plans, that this would be the largest space on the Hill except for maybe Remington's, and that "we can't just give away" support without much to go on, especially since Brody has not had any dealings with 6B before.
Kirsten Oldenberg, in whose single-member district (6B04) this site is located, listed similar concerns, as well as the fact that, if the temporary building is a success, why would the owners ever then tear it down to build something better? She also mentioned the Lower 8th Vision draft plan that has just been submitted to the Office of Planning, wondering if this project fits in to that vision.
6B07 commissioner Carol Green separated herself a bit from her brethren by saying that she feels the area south of the freeway needs something now.
Jarboe then mentioned the possibility of writing into the voluntary agreement that the liquor license be temporary (three or four years) so that the project can get started soon, but "to give [the license] to you forever and ever opens us up for mischief later on."
The license is on the agenda for the full ANC 6B commission meeting on Tuesday (Dec. 14), at 7 pm at the People's Church at 535 8th St., SE, but with things like a voluntary agreement still needing to be written, along with probably some strong feelings about wanting more information, I'm not sure how the timeline is going to work out, with the liquor license hearing date set for January 3.
UPDATE: After deliberations (which were public but I mistakenly didn't stick around for), the ABC Committee has decided to support the liquor license application contingent on the applicant and the city's ABC Board agreeing to a Voluntary Agreement that limits hours and occupancy (terms to come). 6B is also going to argue for a temporary license (as I described above), but it's not clear that the ABC Board would go along with that. There will be more discussion of this at Tuesday's full ANC meeting.
Comments (6)
   
 
 More About 8th Street

JDLand.com Home

Comments

Alan says: (12/9/10 10:07 PM)
As much as I would LOVE to have a place like this and as much as lower 8th needs something/anything to get things moving, this sounds like poor planning and prep and will probably mean a poor product ends up being built.

Ps: they've begun putting windows in on the top floor of the foundry lofts building.


MP says: (12/9/10 11:49 PM)
Agree with Alan. Either I am becoming an old man (a less than 30 year old old man at that) or these guys really did come unprepared. Ok maybe both, but the concerns raised do seem like valid ones.


RT says: (12/10/10 10:03 AM)
Let them build. It's a ghost town down, there, and it's their land.

I think the owners should wait til January, when new commissioners are in who are less stodgy.


Sophia Monster says: (12/12/10 7:08 PM)
I live at 5th and L, and I'm just curious.... how do you all think most people will be getting to the beer garden? I welcome the new development - just curious how many people will be stumbling past my place.


Andrew in DC says: (12/12/10 11:21 PM)
Sophia, if I had to guess, I'd say the Eastern Market metro and M St bus routes are the most likely infil/exfil routes for cross-towner/NoVA/MD types. Folks stumbling past your residence are more likely to be locals. ...I'll try to be relatively quiet and be sure to wave. :)


MJM says: (12/13/10 11:46 AM)
For the most part people are lazy so they will either take the circulator from the NY metro or drive but for the non-lazy ones we will probably walk down L St. Or the baseball crowd will get the ped-cabs.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

Jscott280 on Super Tuesday Tidbits: Construction fences up at 1299 first st, has anyone heard what might go here?
202_cyclist on Super Tuesday Tidbits: JD— your brother is doing good work. https://mobile.twitter.com/jamiedupree /st...
RMP on Super Tuesday Tidbits: The Willow space is cleared out :(
MarkinDC on Super Tuesday Tidbits: This article has some great info for helping out our neighborhood restaurants an...
CJBabyDaddy on Super Tuesday Tidbits: @RMP: I’m stacking up gift cards so I can celebrate by binging at a couple of m...
AGH on Super Tuesday Tidbits: Just got notice that the new retail on N street will be: Kilwins (Chocolate, Fud...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/23/20
1500 B/O SOUTH CAPITOL ST SE   THEFT
Shoplifting
 03/11/20
200 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/09/20
1000 B/O 1ST ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 03/08/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 03/06/20
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 03/05/20
1200 B/O 1ST ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/01/20
1100 B/O 1ST ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/27/20

Recent Issued Building Permits Archive  
1300 4TH ST SE 1001   
03/16/20 
LA FAMOSA LLC / null
P2004796 / SUPPLEMENTAL
   
03/20/20 
LA FAMOSA LLC / null
E2005975 / SUPPLEMENTAL
1300 4TH ST SE 1006   
03/16/20 
LA FAMOSA LLC / null
M2001859 / SUPPLEMENTAL
1300 4TH ST SE RU-1   
03/04/20 
AP BOWER RETAIL LLC / DAVID T FONTANA; BACON CONSTRUCTION COMPANY BACON CONSTRUCTION COM
TL2000065 / CONSTRUCTION
First time tenant layout on 1,196 SF of 1st floor retail shell for restaurant, Jeni Ice Cream, with 10 seats
   
03/06/20 
AP BOWER RETAIL LLC / null
E2005415 / SUPPLEMENTAL
   
03/11/20 
AP BOWER RETAIL LLC / DOMINIC E TOTARO; DOMINIC E TOTARO
M2001793 / SUPPLEMENTAL
1300 4TH ST SE   
03/13/20 
LA FAMOSA LLC / KIMOY LALLEMENT; POTOMAC CONSTRUCTION SERVICES
TL2000028 / CONSTRUCTION
New tenant layout for commercial kitchen, two restrooms, point of sale bar, and dining seating, new lighting and mechanical zones. 2,338 sf INDOOR OCCUPANCY: 84 PERSONS WITH 59 SEATS OUTDOOR OCCUPANCY: 38 PERSONS WITH 38 SEATS TOTAL MAX OCCUPANCY: 122
900 5TH ST SE   
03/03/20 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / CHRISTOPHER LAKATOSH; CHRISTOPHER LAKATOSH
E2005256 / SUPPLEMENTAL
   
03/24/20 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KAYLA TRICE; DELAWARE
EN2001608 / SHOP DRAWING
Install 3 new hydraulic passenger elevators
2 I ST SE   
03/09/20 
CRESCENT CAPITOL VIEW MF LLC / BOB BIROONAK; BOB BIROONAK; BOB BIROONAK
SG2000223 / CONSTRUCTION
one non illuminated sign
200 I ST SE   
03/17/20 
DISTRICT OF COLUMBIA / LEIA TERRELL
B2006382 / CONSTRUCTION
Tenant Alterations of existing office doors and wall. Including relocation of existing electrical, and mechanical terminals. NO CHANGE OF EGRESS, USE OF OCCUPANCY, NO EXTERIOR LAND DISTURBANCE, NO BASE BUILDING STRUCTURAL WORK.
139 N ST SE   
03/16/20 
PARCEL I FC ROWAN / MIGUEL RIOS; GRIFFIN DEWATERING, LLC
SB2000152 / CONSTRUCTION
Type of proposed System: Deep well dewatering system consisting of 16 wells around the perimeter of the shored excavation and 2 wells within the excavation in a mutually agreed layout. • Installation Method: Wells will be drilled up to 70’ deep, utilizing Griffin’s hollow stem auger drilling rig to drill up to a 10.25” I.D. borehole. Deep wells come complete with screen, casing, riser pipe and a s...
861 NEW JERSEY AVE SE   
03/03/20 
809-853 NEW JERSEY AVENUE ACQUISITION LLC / ERICKA CLARK
AH2000987 / CONSTRUCTION
Tower crane erection must be performed in 1 day due to weather constraints. All work performed onsite. Noise reduction procedure in place.
1275 NEW JERSEY AVE SE   
03/06/20 
MILLER AND LONG / WILLIAM MOORE
AH2001001 / CONSTRUCTION
After hours to pour concrete with pump truck saturday 3 / 7 and sunday 3 / 8 from 9PM-4AM.
1299 NEW JERSEY AVE SE   
03/13/20 
FOREST CITY SEFC LLC / SARAH J. NAPIER
BCIV2000067 / CONSTRUCTION
Revisions to BCIV1800153. This submission is for approval stamps only. No change in work.
71 POTOMAC AVE SE   
03/27/20 
MRP RESIDENTIAL / KAYLA SHATTUCK; KAYLA SHATTUCK; PARADIGM CONTRACTORS LLC
BCIV2000036 / CONSTRUCTION
This permit is for site civil work at 71 Potomac Avenue SE including stormwater management and erosion & sediment control. See plans for more details.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.