The "Miles Glass" site on the southwest corner of 8th and Virginia has been vacant and for sale for a number of years now, but in late August it was purchased for $3.5 million, by the National Community Church, the group behind the rehabbed Ebenezers Coffeehouse near Union Station in Northeast. According to their web site, NCC is "one church with [six] locations," broadcasting their Sunday services at multiple locations in addition to Ebenezers, such as the old Tivoli Theater in Columbia Heights and movie theaters in Georgetown, Ballston, Kingstowne, and Potomac Yard.
The church's head, Mark Batterson, wrote on his blog in late August about the purchase of the 8th and Virginia site, which he called "the last piece of property on Capitol Hill." The church is running out of space for services and staff at Ebenezers, he wrote, and since his vision for NCC is 20 locations and more than 100 staffers, they're looking at "going vertical" and constructing a building with about 50,000 square feet of space.
I don't know anything at this point about timing, design, or anything, but I'm guessing because of its location on 8th Street any proposed building will have to go through the city's zoning processes (as well as probably historic preservation and ANC 6B). And it looks like they may be in the very early stages of design themselves, because today is apparently the "visioning charrette" for the new property.
Note that the purchase covers the Miles Glass building and attached garage as well as the vacant lot just to the west. But the adjacent storefronts on 8th Street, including Al's Deli, are not part of the purchase.
As for managing to secure the property, apparently there must have been some divine intervention, because according to Batterson, NCC lost the contract to other parties three times before finally purchasing the site.
Comments (6)
   
 
 More About 8th Street

JDLand.com Home

Comments

David Garber says: (9/22/10 11:02 AM)
this is great news - NCC has proven themselves with Ebenezer's.


Bruce says: (9/22/10 11:06 AM)
Sounds good!


MJM says: (9/22/10 12:53 PM)
Great to see something going in that spot but also that the older buildings on 8th St won't be impacted!! Maybe this will help spur redevelopment of that area. It also keeps with the long history/tradition of churches along VA Ave. Knew something was happening there because the fence came down and there had been some other acitivity a few weeks ago.


JC says: (9/22/10 2:40 PM)
I hope they know about CSX coming to dig up the Virginia Ave.


Mark says: (9/23/10 8:18 AM)
Hopefully they'll consider putting another Ebenezer's on the first floor in the mode of the version on the north side of the Hill. It would be a welcome addition to the neighborhood. Regardless - welcome to our little part of DC!


greetingsvirginia says: (9/23/10 8:29 AM)
Congratulations NCC! Good update! I am very happy that NCC church grows all over Virginia. I wish that Mark Batterson vision should come true.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

jdc on Roundup of Some: Being able to walk to Silver Diner is nice. I miss my routine of taking the morn...
JES on Roundup of Some: omg i would kill for a silver diner...
conngs0 on Roundup of Some: sharksfansd, I agree the Peet's closure is a shame as it was a solid option. No...
sharksfansd on Roundup of Some: Such a bummer about Peet's, as it was my go to instead of the other large coffee...
GG on Roundup of Some: So what’s the story with the CVS at Half and I? It’s looked fully stocked and r...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
100 B/O I ST SE   THEFT
Theft First Degree (all Other Larceny)
 07/30/20
100 B/O O ST SE   ASSAULT WITH A DANGEROUS WEAPON  07/28/20
400 B/O M ST SE   THEFT
Shoplifting
 07/24/20
100 B/O M ST SE   BURGLARY
Burglary Two
 07/20/20
UNIT B/O N ST SE   ASSAULT WITH A DANGEROUS WEAPON  07/20/20
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (theft From Building)
 07/13/20
900 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/09/20
1500 B/O 1ST ST SE   SEX ABUSE
Assault W/intent To Commit First Degree Sexual Abuse (force) (rape)
 07/08/20
400 B/O K ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/06/20
1200 B/O HALF ST SE   THEFT
Theft First Degree (all Other Larceny)
 07/05/20
100 B/O H ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/03/20
100 B/O O ST SE   ROBBERY  07/03/20

Recent Issued Building Permits Archive  
1300 4TH ST SE 1001   
07/22/20 
LA FAMOSA / null
E2009613 / SUPPLEMENTAL
1300 4TH ST SE 130   
07/24/20 
TOM AN / KIMOY LALLEMENT
A2005055 / CONSTRUCTION
New sail shade awning at exterior private space of La Famosa restaurant (Permit #TL2000028)
900 5TH ST SE   
07/13/20 
null
B1906215-EXT-1 / CONSTRUCTION
1ST EXTENSION TO B1906215, EXTENSIOIN WILL EXPIRE ON 03 / 01 / 2020. ORIGINAL SCOPE: Reconstruction of 4-story residential building, the Arthur Capper Senior Center, damaged by fire.
1150 5TH ST SE   
07/08/20 
DISTRICT OF COLUMBIA / CASEY STRINGER; NA
B2008863 / CONSTRUCTION
DGS PROJECT Minor interior classroom renovations at existing school
   
07/16/20 
DISTRICT OF COLUMBIA / null
P2007453 / SUPPLEMENTAL
   
07/22/20 
DISTRICT OF COLUMBIA / null
E2009571 / SUPPLEMENTAL
10 I ST SE   
07/27/20 
CAPITOL HILL RACQUET CLUB / ANDREW ARNOLD; NA
SB2000413 / CONSTRUCTION
We propose drilling two (2), six-inch diameter geotechnical test borings (B-7 and B-8) using the hollow stem auger method to evaluate the subsurface conditions. The proposed test boring depths will be 85 feet below the existing ground surface. If a confining unit is encountered, outer casing will be installed which will extend 10 feet into the top of the confining unit or to the top of bedrock. Up...
423 L ST SE   
07/24/20 
JOHN P LANG / MARGO RICKS
SOL2001665 / CONSTRUCTION
To install 4.56 kW size of solar panels with a system height of 1.1 feet on roof of building.
250 M ST SE   
07/10/20 
SQUARE 769 LLC / null
E2009225 / SUPPLEMENTAL
   
07/21/20 
SQUARE 769 LLC / null
E2009527 / SUPPLEMENTAL
300 M ST SE   
07/27/20 
FEDERAL CENTER LP / null
E2009758 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
07/23/20 
GREYSTAR GP LLC / null
M2003144 / SUPPLEMENTAL
1105 NEW JERSEY AVE SE   
07/23/20 
GALLERY CAPITAL RIVERFRONT PROPERTY LLC / null
E2009620 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE   
07/08/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
M2002985 / SUPPLEMENTAL
1200 NEW JERSEY AVE SE 20590   
07/14/20 
JBG/FEDERAL CENTER LLC / SAM HOLLEN
B2006851 / CONSTRUCTION
INTERIOR RENOVATION TO 1ST FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MECHANICAL, ELECTRICAL AND LIFE SAFETY. NO PLUMBING. NO STRUCTURAL. 1700 SQUARE FEET. GSA / DOT
1275 NEW JERSEY AVE SE   
07/13/20 
FC 1275 NJ, LLC / PARKER HARRELL
SB2000382 / CONSTRUCTION
We are abandoning 14 gravel packed dewatering wells and one piezometer. All pumps and associated hardware will be removed from the wells. Each well casing will then be removed of perforated. We will then tremie each borehole using a bentonite slurry (two pounds bentonite powder to one gallon water).
1033 O ST SE 20374   
07/13/20 
UNITED STATES OF AMERICA / STANELY CARPENTER; JILL S CUTLER
BCIV2000111 / CONSTRUCTION
Install a safety shower and eye-wash station with a concrete base at the hazardous waste storage area near Building 166 at the Washington Navy Yard.
79 POTOMAC AVE SE 505   
07/15/20 
null / NA NA NA
EHOP20993669 / HOME OCCUPATION
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.