Since January, 2003
            
 Sliding from Before to After

Here's a news item that people have been waiting on for a good long while--the official Canal Park groundbreaking ceremony has been scheduled for Monday, August 30 Tuesday, August 31, at 10:45 am, with the mayor expected to be in attendance. Construction on the three-block publicly funded park is expected to take 12 to 14 months, so look for it to be finished in probably late 2011--just in time to get a lot of use out of the ice skating rink.
[Here's a slightly edited version of a description I wrote a few months ago] For those who haven't been following along, Canal Park will stretch from I to M streets SE along the two parts of Second Street--some people may know this location as the open field across from Subway and Five Guys, about three blocks northeast of Nationals Park. The southern block, across from the US Department of Transportation headquarters, will have a large plaza, a "significant water feature" that will transform into an ice skating rink in winter, and a large two-level pavilion that will be home to a cafe and observation area. The middle block has a rain garden, a children's play area, a small performance stage, and an open lawn. The northern block, the "most pastoral of the three," will have a large open lawn, and the slight grade of the block as it slopes upward toward I Street has allowed the designers to envision this as an informal amphitheater, for events like summer movie nights and whatnot. There is also a "linear rain garden" that runs along the eastern edge of the park's three blocks. (Note that K and L streets will still be open to traffic, though there will be well-marked crosswalks.)
If you want to know more, visit the park's official web site. Or my page, if you want to see lots of photos of schoolbuses from the old days. And this report from the National Capital Planning Commission goes deep into the design, if you want to know *still* more. And you can read all my old Canal Park blog posts, back to the beginning, to relive the long road to this groundbreaking.
This groundbreaking will be just a week before the opening of the neighborhood's other new signature open space, the Yards Park, just a few blocks to the south, along the Anacostia River.
UPDATED: The groundbreaking has shifted by one day, to Tuesday, August 31.
Comments (13)
   
 
 More About Canal Park
 All posts: Canal Park

JDLand.com Home

Comments

R says: (8/23/10 3:02 PM)
Is it me or does there seem to be a lot more projects gaining new life again? This is positive news for SE DC! Wonderful.


JD says: (8/23/10 3:09 PM)
It does seem that way, though I'd caution that the all of the projects with "life" right now--Capitol Quarter Phase II, Yards Park, Foundry Lofts, and Canal Park--each are either completely or partially funded with public $$$.

When a development gets started that has no public funds attached to it, that will be a bit more telling as to the state of the commercial real estate market (and the banking industry).


F says: (8/23/10 4:17 PM)
Lets not forget 1015 Half St. Yes, it was partially finished before it was taken over after bankruptcy, but I believe its 100% privately funded.

I think we need to get some JDLand bloggers to write to Panera, Clydes, Mortons, Barnes & Noble, Whole Foods, Legal Seafood, Tasca, etc and let them know that we're waiting for them to come!


JD says: (8/23/10 4:22 PM)
F, one small correction: There's only one JDLand *blogger*. The legions you are referring to are commenters. :-)



c says: (8/23/10 5:28 PM)
but you said there wasn't going to be another groundbreaking because they already did one, oh never mind

best news ever, thanks to the minions for pushing on this and to everyone at the Canal Park Development Association for setting a time line and sticking to it


JD says: (8/23/10 5:36 PM)
Curt--When did I ever say such a thing? The ceremony years ago wasn't a groundbreaking, it was the presentation of the check from the USDOT pilot fund. I've known for months there was going to be a groundbreaking at the end of the summer.

But, clearly it makes you feel better to take shots at me (since you do it in so many of your comments, no matter which username you post under), so today's missive from you is right in line with that. I'm glad your day is complete now!


AKR says: (8/23/10 5:36 PM)
Thanks again for all the detail. I'm a little disappointed that there's not more green space. It looks a least half of the land will no longer be green space - but rather a stone plaza. Is the cafe supposed to be publically run?


JD says: (8/23/10 5:39 PM)
AKR--That plaza is only on the southern block--as the park moves northward across the other two blocks, there's much more green space. The southern plaza is meant to be very "active," since it's so close to M Street and big office buildings.

I don't know any details about the cafe at this point.


MJM says: (8/23/10 6:22 PM)
Those sections are pretty big if you look at an overhead shot - I think in the end people will be surprised with the amount of green space that will be there. With that park and 5.5 acres along the river and the eventual river trail we are gonna have a lot more green space than some parts of the city. Plus I'm looking forward to the ice skating portion!


Mark says: (8/24/10 10:45 AM)
Great news! Thanks for passing it along JD.


Misplaced says: (8/24/10 3:52 PM)
Ditto on the ice skating portion MJM. I can't think of another outdoor ice skating rink (however big or small) in DC proper, can anyone else? I imagine that should garner a little bit of foot traffic during the offseason no?


David Garber says: (8/24/10 4:12 PM)
@Misplaced,

There's the ice rink at the sculpture garden on the mall, and in Pershing Park also across from the Willard on Penn Ave... but this will certainly be the most "neighborhood"-y rink in DC.


Misplaced says: (8/24/10 5:35 PM)
I don't know how I forgot about the Gallery's rink. My girlfriend and I go there often during the winter!

Either way, judging by the designs it'll be more than just an oval shape rink, which should make it plenty different from the other offerings!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

NavyYardGuy on I'm Dreaming of: @hamburgular --I had the XO spaghetti last week too VERY fishy taste -- they sai...
Hamburglar on I'm Dreaming of: I took my wife over to try out ABC Pony for dinner. Be careful with the SPAGHET...
JD on I'm Dreaming of: And, has no one noticed the cool slideshows I've now added to the top of the hom...
RMP on Wednesday Tidbits: What's the deal with the makeshift front desk at Guild (a guy with a laptop at a...
conngs0 on Wednesday Tidbits: They might have chocolate covered donuts too. Or if the weather is good, just ge...
jdc on Wednesday Tidbits: Thanks Shogungts and conngs0! I'd love to take him to District Donuts if he want...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
No records added or modified in the past two weeks.

Recent Issued Building Permits Archive  
1402 1ST ST SE   
11/25/19 
UNITED STATES OF AMERICA / DAVID C POSTLEWAITE
SB1900412 / CONSTRUCTION
Parcel G2:WSP will complete four borings up to the deepest potential subgrade elevation (approx. 32 ft. bgs). The proposed boring locations would be in the four quadrants of Parcel G2 to check for spatial variability in contaminant concentrations. WSP will collect and analyze three soil samples from each boring from depths corresponding to potential subgrade elevations (i.e. 10-12 ft. bgs, 20-22 ...
1331 2ND ST SE   
11/08/19 
DC WATER / CRAIG M COOK
B1907684 / CONSTRUCTION
Flood mitigation, seal openings, install brackets for stop logs, replace elevator shaft with concrete slab.
1212 4TH ST SE   
11/25/19 
FC 1212 LLC / TAMIKA STATON; OTIS
ER2000409 / SHOP DRAWING
Replace governor car #2 - Part #: TBA20641H6 Replace hoist belts #1 and #4 - Part #: SB0003119
1300 4TH ST SE   
11/15/19 
ASANA PARTNERS / DEBRA MARSHALL; THE DONOHOE COMPANIES INC
B2001773 / CONSTRUCTION
ADD EXTERIOR DOOR, ADD INTERIOR DOOR , ANY RELAYED,ELECTRICAL,PLUMBING, RELOCATING UNBUILT APPROVED NON LOAD BEARING FIRE RATED PARTITIONS @ FIRST FLOOR APPROVED UNDER PERMIT #B1711970. ATTACHED
300 M ST SE   
11/11/19 
FEDERAL CENTER LP / null
P2001215 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
11/15/19 
CSX TRANSPORTATION INC / ERICKA CLARK; DGS CONSTRUCTION
TC2000008 / CONSTRUCTION
(2) tower cranes
   
11/26/19 
GREYSTAR GP I I, LLC / KIM MITCHELL; KIM MITCHELL
FD1900040 / CONSTRUCTION
TWO BELOW GRADE PRKING LEVELS, CONCRETE FOUNDATION WALLS, SLAB ON GRADE, COLUMNS ELEVATED DECKS UP TO GRADE WITH UNDERGROUND UTILITIES (MECHANICAL, PLUMBING, ELECTRICAL)
1111 NEW JERSEY AVE SE   
11/15/19 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / TANYA HILL; THYSSENKRUPP
ER2000366 / SHOP DRAWING
REPLACE EXISTING 8MM WORN HOIST CABLES WITH LIKE IN KIND ON ELEVATOR #4. WORK TO ALLOW UNIT TO BE RETURNED TO SERVICE.
1299 NEW JERSEY AVE SE   
11/12/19 
BROOKFIELD DEVELOPMENT / JUSTIN BELLOW
BP2000489 / POST CARD
125 O ST SE   
11/25/19 
DISTRICT OF COLUMBIA / DAVID C POSTLEWAITE
SB1900411 / CONSTRUCTION
WSP will complete three borings up to the deepest potential subgrade elevation (approx. 32 ft. bgs). WSP assumes that borings will not be installed inside the fleet maintenance facility due to access restrictions imposed by DC Water. The proposed boring locations form an ā€˜Lā€™ shape around the eastern and southern sides of the fleet maintenance facility. WSP will collect and analyze three soil samp...
71 POTOMAC AVE SE   
11/08/19 
RIVERFRONT HOLDINGS II, LLC / JAMES VANEGAS
AH2000075 / CONSTRUCTION
Perform interior and exterior construction activities. New construction 14-story new residential multi-family building.
201 TINGEY ST SE   
11/14/19 
BROOKFIELD PROPERTIES / DFM DEVELOPMENT SERVICES, LLC
AH2000197 / CONSTRUCTION
Afterhours work at Tingey Square Project. The work performed will be forming, prepping and paving at Tingey Square park. Friday and Saturday the 15th & 16th, from 7PM to midnight. If required, Sunday the 17th from 7AM to 3PM. ANC Support provided. Associated Permit Include PA328164-R1 and PA10760162.
227 TINGEY ST SE   
12/02/19 
FC 227 LLC / KAYLA SHATTUCK; BROOKFIELD PROPERTIES MANAGEMENT LLC.
RW1900122 / CONSTRUCTION
Construction of new retaining wall located between Canal Street St and Third Street, SE.
300 TINGEY ST SE   
12/04/19 
FC BOILERMAKER LLC / ROBERT S. WATTS; ROBERT S. WATTS
E2002289 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.