Sliding from Before to After
 I've been chroncling over the past few months the Marine Corps' search for a spot for a new barracks, which has focused on a number of sites in Near Southeast, including the block bounded by Fifth, Seventh, L and M just south of their newest barracks that used to be home to the old Capper Seniors apartment building. It's been clear in public meetings and various other rumblings that both city planning officials and the DC Housing Authority are very much against the Marines using this site, with plans having been in place for a number of years for this now-empty/parking-lot block to become home to both a 600,000-square-foot office building and a 189-unit mixed-income apartment building (shown above) as part of the Capper/Carrollsburg redevelopment. Clearly feeling that the Marines haven't given up on the site as an option despite these plans, DCHA has now sent the Marines a letter officially requesting that the Corps "not continue to propose redevelopment options on the DCHA-owned Square 882 as a future site for its facility needs." The letter explains that DCHA has already secured funds to improve the infrastructure around the square, has spent "substantial predevelopment funds" on design and engineering drawings, and is anticipating beginning work on the residential portion of the site in October. (There's currently no timetable for the office portion.) Further, DCHA says it "recently received an invitation from HUD to submit an application for a FHA loan guarantee to support the planned residential construction on the site," and that this construction is expected to start "this winter." Nothing in the letter is necessarily a surprise--I've written fairly extensively about DCHA's plans and about the zoning travails they went through before getting a second-stage PUD approval for Square 882 last year, which even included many discussions and agreements with both the Marines and the Navy about security requirements for the new buildings on this block. But clearly DCHA is hoping to be completely removed from the Marines' list of potential sites in the same way that the DC Public Schools (and parents) got Tyler Elementary removed from consideration. But it's also clear from the public workshops that the Marines very much like what Square 882 has to offer them in terms of space and proximity to the other USMC operations in the area. The Marines are hoping to make a decision on a site by September. You can see all the sites under consideration and the various options on the "Community Integrated Master Plan" web site.
JDLand.com Home
MJM says: (5/28/10 8:33 AM)
That's great news for a Friday! Hopefully the community garden, Dog-Ma and the residences/businesses (jobs/homes) in that lower 8th St area will be saved too.
NavyYard says: (5/28/10 9:00 AM)
So, we wait another 10 years for DCHA to maybe come up with the money or we allow someone with ample resources who is ready to develop this sorely underdeveloped neighborhood immediately. Hmmm, I choose the Marines.
JD says: (5/28/10 9:07 AM)
MJM--I think you;re thinking of the area over around 9th Street and the Virginia Avenue Park. This area that DCHA owns is where the Nats parking lot W currently is, at 7th and M.
NavyYard--planning to start vertical construction "this winter" isn't quite 10 years. (I'm not a big fan of hyperbole--all opinions are fine around here as long as they are fact-based)
MJM says: (5/28/10 9:20 AM)
JD - exactly - two sep areas but they are looking at that area too (9th St) - that area needs to be saved too but don't think they haev the help/support of DC to protect that area. There are homes, jobs and a sense of community (garden) that would be lost in that 9th St area that would never be replaced if the barracks are moved into that area (because the only jobs created there would be temp construction jobs).
JD says: (5/28/10 9:24 AM)
MJM, oh I see, in my morning haze I missed the sentence construction. :-)
JD2 says: (5/28/10 9:51 AM)
So do we really need more office space over there? And the Marines would be just awful tenants too, huh? (rhetorical question) With what seems like a spike in crime lately in our neighborhood, I'd love to see them move over there. And frankly, I'll believe that the DC govt. will start construction when I see it. They are not what I would call a reliable entity.
Scott says: (5/28/10 10:05 AM)
At least a parking lot offers the POSSIBILITY of bringing something in the future that integrates the community and injects spending capital that will attract restaurants and businesses.
Filling up a huge block of space with a walled-off, somewhat insulated structure, filled with residents who probably spend a lot of the little spending money they get on base, isn't seen as the ideal long-term solution for a lot of us.
Mark me down for full-time residents and office workers who can support sit-down restaurants, coffeeshops, florists, pet shops, salons and all the other various types of businesses that would not be attracted by another enlisted barracks.
Scott says: (5/28/10 10:17 AM)
Why is the response to people not wanting a barracks always "what, you don't like Marines?"
Look, I like the Marines and I'm extremely appreciative of what they do for our country. That has nothing to do with this issue.
This neighborhood is growing regardless, the full-time population has doubled in the last 18 months and will continue to grow. The number of officeworkers will continue to grow with all the new leases being signed.
You can't just shout down detractors. So please tell me what a new Marines barracks will actually ADD to the community?
All I can see at this moment is that it will subtracts 189 housing units and 600,000 feet of office space filled with people who will inject far more money into neighborhood businesses that enlisted marines will.
JD2 says: (5/28/10 10:29 AM)
I'll take public safety and fewer bureaucrats over congestion and commuters speeding through the neighborhood any day.
MJM says: (5/28/10 10:50 AM)
Security? Marines do not equal police offices - some law or something that goes back to the civil war time or so I've heard.
This giant monstrosity ringed by a 9ft fence will only block off roads and does not make an open community and only takes away.
When you stroll down Barracks Row from the Eastern Market metro look at how businesses change (or lack of except those that cater to the Marines) as you get into the heart of the barracks. Granted it is further away from the metro but after 200 years of being in that area it hasn't done much for the community. I'd rather take office workers, private jobs (Port City Cafe, Dog-Ma, etc), and homes/families over barracks.
I've said my piece more than enough but I will state again that my free beer for a year offer stands to the first person who can point out the last time they saw a non-Navy Exchange shop (something like Justins) on the ground level of a military barrack. Because that is what you won't get with the barrack but will get with the apartment/Square 882 if zoned for that type of business.
patrick says: (5/28/10 10:53 AM)
Yet we all know what the best answer would be and DCHA won't permit that either. The marines like Potomac Gardens, but they were told by DCHA not to consider it. Initially, DCHA says that the marines didn't want it, but when pressed they DCHA said that they weren't offered enough money by the marines.
CAPT Hill says: (6/1/10 8:33 AM)
DCHA made a mistake here as far as the future of our community is concerned. The track record of DCHA's tenants v. the Marines is clear. Moreover, I would like to see L Street closed to traffic - we have far, far too many suburbanite commuters who speed down L Street in order to avoid the lights on M.
Sophia Monster says: (6/1/10 1:38 PM)
I love those renderings, but are those palm trees?
BBC says: (6/2/10 6:07 PM)
How can "I don't want more Marines living near me" be interpreted as anything other than anti-Marine? These are sad days for the community. Marines are not a police force, but just their presence makes this area more safe than it would have been. But greater than that, I am sick and tired of each community basically giving them the middle finger. These young men and women sacrifice so much for us. It is shameful when they come to us for living quarters and these communities say "go live someplace else, not near me." At least I was able to show up at a couple of the meeting to let them know that I support their search and I would have been proud to call more of these marines my neighbor!!!
...Also, the current barracks is more beautiful than any office building around here. The black iron fence also looks very nice ...despite many repeated attempts to portray it otherwise. Their opening of their soccer field to community children (and cheering parents) makes it more open and accessible than private residences/offices.
Add a Comment:
Comments are closed for this post.
JDLand Comments RSS Feed
See All Current News Items |
Full Blog Archive
|
|
|
Full Neighborhood Development Map
There's a lot more than just the projects listed here. See the complete map of completed, underway, and proposed projects all across the neighborhood.
What's New This Year A quick look at what's arrived or been announced since the end of the 2018 baseball season.
Food Options, Now and Coming Soon
There's now plenty of food options in the neighborhood. Click to see what's here, and what's coming.
Anacostia Riverwalk
A bridge between Teague and Yards Parks is part of the planned 20-mile Anacostia Riverwalk multi-use trail along the east and west banks of the Anacostia River.
Virginia Ave. Tunnel Expansion
Construction underway in 2015 to expand the 106-year-old tunnel to allow for a second track and double-height cars. Expected completion 2018.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Canal Park
Three-block park on the site of the old Washington Canal. Construction begun in spring 2011, opened Nov. 16, 2012.
Nationals Park
21-acre site, 41,000-seat ballpark, construction begun May 2006, Opening Day March 30, 2008.
Washington Navy Yard
Headquarters of the Naval District Washington, established in 1799.
Yards Park
5.5-acre park on the banks of the Anacostia. First phase completed September 2010.
Van Ness Elementary School
DC Public School, closed in 2006, but reopening in stages beginning in 2015.
Agora/Whole Foods
336-unit apartment building at 800 New Jersey Ave., SE. Construction begun June 2014, move-ins underway early 2018. Whole Foods expected to open in late 2018.
New Douglass Bridge
Construction underway in early 2018 on the replacement for the current South Capitol Street Bridge. Completion expected in 2021.
1221 Van
290-unit residential building with 26,000 sf retail. Underway late 2015, completed early 2018.
NAB HQ/Avidian
New headquarters for National Association of Broadcasters, along with a 163-unit condo building. Construction underway early 2017.
Yards/Parcel O Residential Projects
The Bower, a 138-unit condo building by PN Hoffman, and The Guild, a 190-unit rental building by Forest City on the southeast corner of 4th and Tingey. Underway fall 2016, delivery 2018.
New DC Water HQ
A wrap-around six-story addition to the existing O Street Pumping Station. Construction underway in 2016, with completion in 2018.
The Harlow/Square 769N Apts
Mixed-income rental building with 176 units, including 36 public housing units. Underway early 2017, delivery 2019.
West Half Residential
420-unit project with 65,000 sf retail. Construction underway spring 2017.
Novel South Capitol/2 I St.
530ish-unit apartment building in two phases, on old McDonald's site. Construction underway early 2017, completed summer 2019.
1250 Half/Envy
310 rental units at 1250, 123 condos at Envy, 60,000 square feet of retail. Underway spring 2017.
Parc Riverside Phase II
314ish-unit residential building at 1010 Half St., SE, by Toll Bros. Construction underway summer 2017.
99 M Street
A 224,000-square-foot office building by Skanska for the corner of 1st and M. Underway fall 2015, substantially complete summer 2018. Circa and an unnamed sibling restaurant announced tenants.
The Garrett
375-unit rental building at 2nd and I with 13,000 sq ft retail. Construction underway late fall 2017.
Yards/The Estate Apts. and Thompson Hotel
270-unit rental building and 227-room Thompson Hotel, with 20,000 sq ft retail total. Construction underway fall 2017.
Meridian on First
275-unit residential building, by Paradigm. Construction underway early 2018.
The Maren/71 Potomac
264-unit residential building with 12,500 sq ft retail, underway spring 2018. Phase 2 of RiverFront on the Anacostia development.
DC Crossing/Square 696
Block bought in 2016 by Tishman Speyer, with plans for 800 apartment units and 44,000 square feet of retail in two phases. Digging underway April 2018.
One Hill South Phase 2
300ish-unit unnamed sibling building at South Capitol and I. Work underway summer 2018.
New DDOT HQ/250 M
New headquarters for the District Department of Transportation. Underway early 2019.
37 L Street Condos
11-story, 74-unit condo building west of Half St. Underway early 2019.
CSX East Residential/Hotel
225ish-unit AC Marriott and two residential buildings planned. Digging underway late summer 2019.
1000 South Capitol Residential
224-unit apartment building by Lerner. Underway fall 2019.
Capper Seniors 2.0
Reconstruction of the 160-unit building for low-income seniors that was destroyed by fire in 2018.
Chemonics HQ
New 285,000-sq-ft office building with 14,000 sq ft of retail. Expected delivery 2021.
Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.
|
|
No records added or modified in the past two weeks. |
|
Recent Issued Building Permits
| Archive
|
|
1300 4TH ST SE 1001
|
|
02/22/21
AP BOWER RETAIL LLC / null
E2104231 /
SUPPLEMENTAL
|
1346 4TH ST SE APT 1M
|
|
02/06/21
null / NA NA NA
EHOP21945129 /
HOME OCCUPATION
|
1331 4TH ST SE R-2
|
|
02/08/21
FC 1331 LLC / FC 1331 LLC
BP2101814 /
POST CARD
|
10 I ST SE
|
|
02/16/21
CAPITOL HILL RACQUET CLUB / NA; VICTORIA STEINHOFF
SB2100112 /
CONSTRUCTION
Installation of up to six (6) 3-inch diameter direct-push Geoprobe borings to depths of up to 30 feet below grade as part of an environmental assessment.
|
555 L ST SE
|
|
01/29/21
UNITED STATES OF AMERICA / RENNE WELL; RICK HARLAN SCHNEIDER
B2102004 /
CONSTRUCTION
DGS PROJECT REHABILITATION+RESTORATION OF THE HISTORIC LINCOIN FIELDHOUSE
|
861 NEW JERSEY AVE SE 20003
|
|
02/23/21
809-853 NEW JERSEY AVE ACQUISITION LLC / SUSANA VAZQUEZ
AH2100728 /
CONSTRUCTION
Dismantling of tower crane.
|
809 NEW JERSEY AVE SE
|
|
02/11/21
GREYSTAR GP LLC 809-853 NEW JERSEY AVENUE ACQUISITION LLC / null
E2103926 /
SUPPLEMENTAL
|
853 NEW JERSEY AVE SE
|
|
02/11/21
GREYSTAR GP LLC / null
E2103924 /
SUPPLEMENTAL
|
861 NEW JERSEY AVE SE
|
|
02/05/21
GS CSX HOTEL OWNER LLC / null
E2103762 /
SUPPLEMENTAL
|
1275 NEW JERSEY AVE SE
|
|
02/02/21
FC 1275 NJ LLC / null
E2103662 /
SUPPLEMENTAL
|
|
|
02/11/21
FC 1275 NJ LLC / null
P2103445 /
SUPPLEMENTAL
|
848 SOUTH CAPITOL ST SE
|
|
02/16/21
CXS TRANSPORTATION INC / VICTORIA STEINHOFF; TBD
SB2100111 /
CONSTRUCTION
Installation of up to six (6) 3-inch diameter direct-push Geoprobe borings to depths of up to 30 feet below grade as part of an environmental assessment.
|
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;
|
|
|
No commercial transaction records added or modified in the past two weeks. |
|
|