Since January, 2003
            
 Sliding from Before to After

Tonight DDOT held a public meeting to update residents on the Ward 6 Performance Parking Pilot program, which was instituted in March 2008 to attempt to get out in front of expected curbside parking problems in the ballpark area, in Southwest, and along Pennsylvania Avenue and Barracks Row.
There were a lot of numbers passed along, but the biggest one is that, in 19 months of operation, the 138 multispace meters in these areas have collected $1.4 million in fees. And, since the legislation that created the program specifies that, until the meters are paid for, 20 percent of the meters' proceeds will be returned to the PILOT area to pay for "non-automobile improvements", there's now $288,809.34 ready to be spent on signage, bike racks, and other amenities. (And in another three months, the initial capital investment for the meters will be paid off, at which point the neighborhoods will receive 75 percent of the meter proceeds.) But, as it's always emphasized, Performance Parking is not about revenue generation! (It's just a very nice side benefit.)
This first phase of improvements, to be completed by next spring, will include these new additions across the three zones, which were determined in consulation with the program's advisory committee members from various neighborhood organizations (UPDATE: here's the map showing the planned locations of these items):
* 25 new bike racks, branded with neighborhood names;
* Eight "wayfaring" map kiosks and 15 pedestrian wayfaring signs to help folks navigate the areas;
* 10-12 digital signs (with 19" screens) to be installed near the ballpark along M Street and at Barracks Row that will display information useful to ballpark goers (times of next buses, offstreet parking options, pedestrian info, PSAs, ads, etc), along with perhaps one 60" screen at the Half Street Navy Yard Metro station entrance ;
* A new to-be-named pedestrian "trail" connecting the Heritage Trails along Eighth Street, SE, and the trail whose name escapes me in Southwest, running along North Carolina from Ninth Street, SE to New Jersey Avenue to M Street to Fourth Street, SW. Benches (with arms, to prevent snoozers) will be placed along the trails, along with specialized large trash cans with compactors run by solar power (in a one-year pilot test);
* One large kiosk in Southeast and one in Southwest (perhaps to be built by students from Catholic University), where neighborhoods can put information for visitors; and
* Grants to the Capitol Hill Restoration Society and the Capitol Riverfront BID, with the BID receiving $50,000 for improved lighting(!) and other upgrades to the New Jersey Avenue underpass.
Other highlights of the meeting beyond the improvements:
* A Near Southeast resident brought up the issue of street parking for residents at Onyx, Velocity, and the other new buildings--because those streets are all [going to someday be] mixed-use residential, office, and retail areas, there will be no Residential Parking Permits given to residents. But Tommy Wells, who attended part of the meeting, committed to working with DDOT to look at other possibilities, such as allowing residents to park overnight at the meters for a very low price.
* Gregory McCarthy of the Nationals was also there, and mentioned how successful the city has been in encouraging "multimodal transportation" to the ballpark, so much so that Nationals Park is now considered a "best practice" that other teams are looking to emulate. But for those of you who have been enjoying parking for free down on the streets of Buzzard Point during ballgames, your salad days may be over, as DDOT is now looking at signing the streets there.
* There was also discussion of the most-used meters (the 1000-1100 blocks of New Jersey Avenue making the list), the issue of raising or lowering the meter prices at the most-used or least-used spaces, and the average turnover time in the spaces, but having seen David Alpert at the meeting, I'm betting I get to leave discussion of these items to Greater Greater Washington. (I think the numbers will also be on the DDOT web site soon.) It's also likely that the multispace meters are going to be removed from Virginia Avenue and moved to Water Street, SW, because the meters just aren't being used on Virginia. (Besides, Virginia is going to be a big huge trench within a few years, anyway!)
If you have ideas for future non-automobile improvements that can be made, or have any other questions or concerns, you can contact Damon Harvey of DDOT at damon.harvey@dc.gov.
{This post was written while watching Top Chef, so apologies if it's a little disjointed.}
UPDATE, 11/19: Here's the improvements map; and both the existing pedestrian trails are called "Heritage Trails," so I fixed my self-diss above.
Comments (3)
   
 
 More About parking
 All posts: parking, Nationals Park

JDLand.com Home

Comments

F says: (11/19/09 9:15 AM)
Justins cafe (at Velocity) was putting up their sign along First ST SE this morning.

Welcome to the neighborhood Justin.


G St says: (11/19/09 10:43 AM)
You take good notes. Who won Top Chef btw?


JD says: (11/19/09 2:05 PM)
Top Chef isn't over yet--they're now down to the Final 4. (I don't want to post any spoilers here!)

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

Jscott280 on Roundup of Some: Looks like the Hilton brothers are partnering with solace brewing for the retail...
JD on Roundup of Some: And these tidbits from Martin Austermuhle on Twitter: Yikes: Per data from D....
JD on Roundup of Some: This is why I remain extremely reticent to speak much of expected openings. h...
tmich93 on Roundup of Some: Just tried La Famosa yesterday and it was terrific. Their menu has terrific valu...
tmich93 on Roundup of Some: Sorry to hear that JD! Best wishes to your father during his recovery.
jdc on Roundup of Some: We miss JD, but family comes first. Best wishes on a speedy recovery for your da...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O 1ST ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 09/16/20
100 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/16/20
200 B/O L ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/13/20
1000 B/O 3RD PLACE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/13/20
UNIT B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/12/20
UNIT B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/10/20
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/07/20
UNIT B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/04/20
1100 B/O 8TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/30/20
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/27/20
UNIT B/O K ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/23/20

Recent Issued Building Permits Archive  
1300 4TH ST SE 130   
09/08/20 
ASANA PARTNERS / KEE HAN KIM; W. SAKIE - BHAR; NA
SG2000328 / CONSTRUCTION
Install one set of building sign and one set of double side blade sign
1331 4TH ST SE CU   
08/28/20 
FC 1331 LLC / null
P2008455 / SUPPLEMENTAL
   
08/31/20 
FC 1331 LLC / null
E2010801 / SUPPLEMENTAL
   
09/01/20 
FC 1331 LLC / null
P2008520 / SUPPLEMENTAL
150 I ST SE   
09/10/20 
SQUARE 737 LLC / SHON THOMAS
AH2001871 / CONSTRUCTION
Placing mobile crane on 2nd Street SE for hoisting materials to 150 I Street SE and closing sidewalk for pedestrian safety
300 M ST SE   
09/11/20 
FEDERAL CENTER LP / HOSSEIN HAMED; WILLIAM G ROSENBERG; NA
SG2000379 / CONSTRUCTION
INSTALL TWO BUILDING MOUNTED LED-ILLUMINATED SIGNS W / FACE LIT CHANNEL LETTERS ON BACKER.
861 NEW JERSEY AVE SE   
08/26/20 
GREYSTAR GP LLC / CHARLES C. BAKER; CHARLES C. BAKER
M2003573 / SUPPLEMENTAL
   
08/26/20 
GREYSTAR GP LLC / CHARLES C. BAKER; CHARLES C. BAKER
P2008383 / SUPPLEMENTAL
   
08/26/20 
GREYSTAR GP LLC / CHARLES C. BAKER; CHARLES C. BAKER
P2008384 / SUPPLEMENTAL
   
09/08/20 
0861 NEW JERSEY AVE / null
M2003711 / SUPPLEMENTAL
1200 NEW JERSEY AVE SE 20590   
08/26/20 
UNITED STATES OF AMERICA / null
M2003570 / SUPPLEMENTAL
1299 NEW JERSEY AVE SE   
09/08/20 
BROOKFIELD PROPERTIES / TIM GOOD
BP2004497 / POST CARD
1013 O ST SE 20374   
08/25/20 
UNITED STATES OF AMERICA / JOHN P RUTTER; JOHN P RUTTER; KYLE ERICKSON
BCIV2000052 / CONSTRUCTION
This project is for the interior renovation of the historic buildings 46 and 67 in the Washington Navy Yard. New utilities will be installed to serve the building. NO NEW BUILDING WILL BE CONSTRUCTED AS PART OF THIS PROJECT. A parking lot south of the building will be used to provide stormwater management, as there is no ample open space within the buildings for stormwater BMPs.
   
09/14/20 
UNITED STATES OF AMERICA / JOHN BROWNING
SB2000494 / CONSTRUCTION
Install three temporary 1" groundwater monitoring wells down to 4' bsg in the basement of buildings 46 and 67 in the Washington Navy Yard for groundwater sampling. Wells will be removed less than 1 week following installation, and the voids will be filled with grout.
71 POTOMAC AVE SE   
09/03/20 
MRP REALTY / JUSTIN BELLOW
TL2000041 / CONSTRUCTION
1st time tenant fit out in new building
   
09/04/20 
RIVERFRONT HOLDINGS II, LLC / JUSTIN BELLOW
B2007457 / CONSTRUCTION
Revision to B1804337 to revise the location of IZ units.
520 TINGEY ST SE   
08/31/20 
U. S. GENERAL SERVICES ADMINISTRATION / JOHN WICKLIFFE
TN2000086 / CONSTRUCTION
Install 100ft x 90ft Tent No Cooking, No Propane, No Stages, No Smoking Installed on Aug 4, 2020 - Jan 29, 2021 Events Daily 8:00 am - 10:00 pm
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.