Since January, 2003
            
 Page Through from Before to After

Today's tidbits:
* The Nationals are in the middle of the One Warm Coat Drive, which is collecting "clean, reuseable" coats and jackets that will be distributed to District adults and children free of charge by the Coalition for the Homeless. Coats may be taken to the Team Store on the southwest corner of Half and N streets, SE, which will be open at 11 am everyday between now and Dec. 11 (except for Thanksgiving), with the store staying open until 3 pm from now to Nov. 25, 6 pm on the 27th and 28th, and 4 pm from Nov. 30 to Dec. 11.
* Buzzard Point--the peninsula south of Potomac Avenue where the Anacostia and Potomac meet--is 95 percent outside of my boundaries (technically there's a sliver of Southeast over there since South Capitol Street runs down to R Street), but I'll still pass this along. The American Planning Association is going to develop a Strategic Vision for Buzzard Point, and there's a community meeting tomorrow (Wednesday, Nov. 18) from 6 to 8:30 pm, followed by a walking tour on Thursday, Nov. 19, from 8 to 9:30 pm, and then an "initial findings" meeting on Saturday, Nov. 21, at 2 pm. The Thursday and Saturday meetings are at the MPD-1D station at the old Bowen Elementary School at 101 M St., SW, and the walking tour leaves from King-Greenleaf Rec Center at 201 N St., SW. More information about the project and meetings here. (Note: meeting locations revised from original post)
* This is from last week, but WBJ reports that the Metropolitan Washington Council of Governments is joining a regional group looking at possible ferry service from Occoquan to points along the Potomac and Anacosita Rivers (including the Navy Yard).
* The city has announced the first move related to the reconstruction of the 11th Street Bridges--they're going to close the pedestrian bridge over DC295 in Anacostia on or about Nov. 30, because it needs to be demolished to make way for the construction of a new ramp that will link southbound 295 with the new bridges.
And, two last-minute meeting reminders:
* If you're reading this in the next few hours, you can still make tonight's Lower 8th Street Visioning session, at 7 pm at 535 8th Street, SE. @CapitolHillDC live-tweeted this morning's session, if you want to see what went on. The agenda is available on the blogspot site.
* Competing with the Buzzard Point meeting is DDOT's public meeting on the Ward 6 Performance Parking Pilot, starting at 6:30 pm Wednesday (Nov. 18) at Friendship Baptist Church, 900 Delaware Ave., SW. This is a meeting I'm actually going to be able to attend! Woo-hoo!
Comments (2)
   
 
 More Recent News

JDLand.com Home

Comments

kate.d. says: (11/18/09 12:45 PM)
i was hoping to make the DDOT meeting on the performance parking plan tonight, but i'm not going to be able to. hopefully they address, at some point, the question of RPPs for the big buildings in the area (CHT, 909, onyx, velocity, etc etc) and whether there is just going to be a blanket denial of RPPs for these buildings, or whether that might change in the future. it's a pretty looming question for those of us who couldn't afford $40K for a garage spot!


Dan says: (11/18/09 1:17 PM)
One of the sticking points for the ferries is the waiver of speed/wake restrictions on the Anacostia. The proposals read like it's a "done-deal" and they'll get the waivers.

I hope they'll have sense enough to talk with other stakeholders already using the river first. I'm pretty sure it won't fly with the marinas and rowers/paddlers on the river. The James Creek Marina will probably see their boats beat up with the wake coming off the ferries, so they'll oppose it. Likewise, the big wakes aren't that healthy for rowing shells, dragonboats, and outrigger canoes.

Development along the river is great, but you have to play nice with the people already there. Waiving wake restrictions is not going to make them any friends.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

Jscott280 on Super Tuesday Tidbits: Construction fences up at 1299 first st, has anyone heard what might go here?
202_cyclist on Super Tuesday Tidbits: JD— your brother is doing good work. https://mobile.twitter.com/jamiedupree /st...
RMP on Super Tuesday Tidbits: The Willow space is cleared out :(
MarkinDC on Super Tuesday Tidbits: This article has some great info for helping out our neighborhood restaurants an...
CJBabyDaddy on Super Tuesday Tidbits: @RMP: I’m stacking up gift cards so I can celebrate by binging at a couple of m...
AGH on Super Tuesday Tidbits: Just got notice that the new retail on N street will be: Kilwins (Chocolate, Fud...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/23/20
1500 B/O SOUTH CAPITOL ST SE   THEFT
Shoplifting
 03/11/20
200 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/09/20
1000 B/O 1ST ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 03/08/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 03/06/20
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 03/05/20
1200 B/O 1ST ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/01/20
1100 B/O 1ST ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/27/20

Recent Issued Building Permits Archive  
1300 4TH ST SE 1001   
03/16/20 
LA FAMOSA LLC / null
P2004796 / SUPPLEMENTAL
   
03/20/20 
LA FAMOSA LLC / null
E2005975 / SUPPLEMENTAL
1300 4TH ST SE 1006   
03/16/20 
LA FAMOSA LLC / null
M2001859 / SUPPLEMENTAL
1300 4TH ST SE RU-1   
03/04/20 
AP BOWER RETAIL LLC / DAVID T FONTANA; BACON CONSTRUCTION COMPANY BACON CONSTRUCTION COM
TL2000065 / CONSTRUCTION
First time tenant layout on 1,196 SF of 1st floor retail shell for restaurant, Jeni Ice Cream, with 10 seats
   
03/06/20 
AP BOWER RETAIL LLC / null
E2005415 / SUPPLEMENTAL
   
03/11/20 
AP BOWER RETAIL LLC / DOMINIC E TOTARO; DOMINIC E TOTARO
M2001793 / SUPPLEMENTAL
1300 4TH ST SE   
03/13/20 
LA FAMOSA LLC / KIMOY LALLEMENT; POTOMAC CONSTRUCTION SERVICES
TL2000028 / CONSTRUCTION
New tenant layout for commercial kitchen, two restrooms, point of sale bar, and dining seating, new lighting and mechanical zones. 2,338 sf INDOOR OCCUPANCY: 84 PERSONS WITH 59 SEATS OUTDOOR OCCUPANCY: 38 PERSONS WITH 38 SEATS TOTAL MAX OCCUPANCY: 122
900 5TH ST SE   
03/03/20 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / CHRISTOPHER LAKATOSH; CHRISTOPHER LAKATOSH
E2005256 / SUPPLEMENTAL
   
03/24/20 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KAYLA TRICE; DELAWARE
EN2001608 / SHOP DRAWING
Install 3 new hydraulic passenger elevators
2 I ST SE   
03/09/20 
CRESCENT CAPITOL VIEW MF LLC / BOB BIROONAK; BOB BIROONAK; BOB BIROONAK
SG2000223 / CONSTRUCTION
one non illuminated sign
200 I ST SE   
03/17/20 
DISTRICT OF COLUMBIA / LEIA TERRELL
B2006382 / CONSTRUCTION
Tenant Alterations of existing office doors and wall. Including relocation of existing electrical, and mechanical terminals. NO CHANGE OF EGRESS, USE OF OCCUPANCY, NO EXTERIOR LAND DISTURBANCE, NO BASE BUILDING STRUCTURAL WORK.
139 N ST SE   
03/16/20 
PARCEL I FC ROWAN / MIGUEL RIOS; GRIFFIN DEWATERING, LLC
SB2000152 / CONSTRUCTION
Type of proposed System: Deep well dewatering system consisting of 16 wells around the perimeter of the shored excavation and 2 wells within the excavation in a mutually agreed layout. • Installation Method: Wells will be drilled up to 70’ deep, utilizing Griffin’s hollow stem auger drilling rig to drill up to a 10.25” I.D. borehole. Deep wells come complete with screen, casing, riser pipe and a s...
861 NEW JERSEY AVE SE   
03/03/20 
809-853 NEW JERSEY AVENUE ACQUISITION LLC / ERICKA CLARK
AH2000987 / CONSTRUCTION
Tower crane erection must be performed in 1 day due to weather constraints. All work performed onsite. Noise reduction procedure in place.
1275 NEW JERSEY AVE SE   
03/06/20 
MILLER AND LONG / WILLIAM MOORE
AH2001001 / CONSTRUCTION
After hours to pour concrete with pump truck saturday 3 / 7 and sunday 3 / 8 from 9PM-4AM.
1299 NEW JERSEY AVE SE   
03/13/20 
FOREST CITY SEFC LLC / SARAH J. NAPIER
BCIV2000067 / CONSTRUCTION
Revisions to BCIV1800153. This submission is for approval stamps only. No change in work.
71 POTOMAC AVE SE   
03/27/20 
MRP RESIDENTIAL / KAYLA SHATTUCK; KAYLA SHATTUCK; PARADIGM CONTRACTORS LLC
BCIV2000036 / CONSTRUCTION
This permit is for site civil work at 71 Potomac Avenue SE including stormwater management and erosion & sediment control. See plans for more details.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.