Since January, 2003
            
 Page Through from Before to After

Yesterday the US Department of Housing and Urban Development announced the awarding of $500 million in stimulus-money grants to housing authorities around the country, with the DC Housing Authority receiving the $9.5 million it requested to help get the second phase of Capper townhomes at Capitol Quarter moving forward.
In my post on DCHA's application back in June, I explained it this way:

According to this "narrative and schedule" that DCHA included with its application to HUD, the money would finance both public infrastructure and private site improvements needed to begin the construction of the second phase of the Capitol Quarter mixed-income townhouse development (the blocks between Third and Fourth south of I), which will have 163 units, 47 of which are public housing rental units (along with 60 market-rate, 39 workforce-rate, and 17 public housing home ownership units). The narrative indicates that the $55 million Capper PILOT bonds approved by the city council last year that were to fund the new community center and infrastructure improvements not only in the Phase II blocks but also on the north and east sides of Canal Park and over to the DPW site never made it into the bond market; attempts to secure loans from both Fannie Mae and Wachovia also were fruitless.
There's a lot of detail in the narrative that I'm not going to try to summarize (I start to glaze over once I get to Low Income Housing Tax Credits [LIHTC] and anything having to do with "leveraging"):, but it does say that if awarded the HUD CFRC grant money, DCHA would immediately have its engineers complete permit drawings, which can then be put into the city's permitting process (estimated to last 90 days), after which infrastructure work can begin--the schedule at the end of the document estimates a start date of Dec. 1. This work would include repair or replacement underground water, sewer, and "dry utilities" lines, new streets, curbs, and gutters, additional lighting, and public landscaping.
The HUD funds would also be used to pay for the land preparation costs and foundation construction of the 47 public housing units, covering a $1 million gap that occurred in the planned Phase II funding thanks to problems in the LIHTC market.
From what I understand, DCHA is already talking to contractors, with hopes of being able to start delivering the first phase 2 townhomes by late next year; this would be in the blocks between Third and Fourth south of I.
There may also be some money coming for the other Capper-related improvements listed above that were to be paid for by the $55 million PILOT bonds, but not as part of this grant.
Comments (1)
   
 
 More About Capper
 All posts: Capper, Capitol Quarter

JDLand.com Home

Comments

Velocity Guy says: (9/24/09 4:24 PM)
Wow, this is a big win for EYA and the Capitol Quarter people. Congrats ya'll.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

Westnorth on Inching from Quarantining: Re: Half Street SE, the plan is a "woonerf design allows for flexible uses ...
Westnorth on Inching from Quarantining: On a webinar today with a presentation from Hickok Cole about 80 M St's vertical...
king of arabistan on Inching from Quarantining: Wholefoods and Harry’s is boarded up but open for business FYI.
GarfieldPark on Inching from Quarantining: Whole Foods boarded up and closed. Harry's has also been boarded up, not sure if...
JD on Inching from Quarantining: Raze applications have been filed for the buildings on the west side of the 1000...
VelocityChris on Inching from Quarantining: The substance of the article doesn't add clarity to whether Half St SE will or w...
Get JDLand Updates In Your Inbox!


Thousands and thousands of photos showing the neighborhood changing. More than 150 buildings no longer with us. All the news, since 2003. Photos from various archives showing the neighborhood in the more distant past. Maps from the early 1900s. Overhead Photo Comparisons: 1949, 1988, 2002-2008. All Blog Entries, 2003 - Present Major Events, 1799 - Present A series of blog entries looking at the neighborhood's history.
Near Southeast's Rearview Mirror


City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O 1ST ST SE   BURGLARY
Burglary Two
 06/03/20
200 B/O M ST SE   BURGLARY
Burglary Two
 05/30/20
900 B/O 1ST ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/27/20
900 B/O 1ST ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/26/20
1000 B/O HALF ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/24/20
1200 B/O VAN ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/23/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/20/20
1100 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/19/20
1100 B/O 1ST ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/19/20
1200 B/O HALF ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/17/20
100 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/15/20
1200 B/O 4TH ST SE   ASSAULT WITH A DANGEROUS WEAPON  05/12/20
300 B/O WATER ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/07/20

Recent Issued Building Permits Archive  
1300 4TH ST SE RU-1   
05/14/20 
AP BOWER RETAIL LLC / null
P2006042 / SUPPLEMENTAL
1300 4TH ST SE   
05/08/20 
null / ;
P2005886 / SUPPLEMENTAL
   
05/15/20 
null / ;
P2006066 / SUPPLEMENTAL
929 5TH ST SE   
05/18/20 
CHRISTOPHER D FRENCH / CHRIS FRENCH; HERCULES FENCE OF MARYLAND, LLC HERCULES FENCE OF
F2000461 / CONSTRUCTION
1. Removal and replacement of front metal fence and gate in kind.  2. Removal and partial relocation of existing 6' tall wood fence in rear patio. The fence is currently approx. 30" inside the rear property line, and we intend to move the fence to our rear property line. The work includes removal of existing wood gate that opens from neighbor's property to our property along shared property line ...
300 M ST SE   
05/14/20 
AMENTUM / null
E2007609 / SUPPLEMENTAL
   
06/02/20 
FEDERAL CENTER LP / null
P2006421 / SUPPLEMENTAL
   
06/02/20 
FEDERAL CENTER LP / null
M2002616 / SUPPLEMENTAL
111 N ST SE   
05/07/20 
BROOKFIELD PROPERTIES / MAHMOUD KHACHAN; NA
SB2000288 / CONSTRUCTION
Drill temporary eight soil borings to a depth of 80 each at the existing parking lot at 111 N Street SE, Washington DC. The diameter of the borings is 6 inches. The borings will be grouted upon completion in accordance with DCRA requirements as indicated in the work plan.
1111 NEW JERSEY AVE SE   
05/12/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
E2007563 / SUPPLEMENTAL
1275 NEW JERSEY AVE SE   
05/19/20 
UNITED STATES OF AMERICA / null
M2002480 / SUPPLEMENTAL
   
05/19/20 
UNITED STATES OF AMERICA / null
P2006118 / SUPPLEMENTAL
   
06/02/20 
UNITED STATES OF AMERICA / ;
P2006429 / SUPPLEMENTAL
79 POTOMAC AVE SE APT 838   
05/29/20 
null / NA NA NA
EHOP20936871 / HOME OCCUPATION
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.