Since January, 2003
            
 Sliding from Before to After

Despite my subconscious desire to return to those days when I didn't bother going to public meetings, I ventured out on Wednesday night to DDOT's first quarterly public meeting on the Ward 6 Performance Parking Pilot Program. Much of the discussion centered on issues outside of Near Southeast (such as how Southwest's parking-enforcement hours still run from 7 am to midnight seven days a week, even though Capitol Hill rolled theirs back to 9:30 pm six days a week and no restrictions at all on Sundays), so I don't really have a lot to report in terms of any changes that might be happening to the streets south of the freeway and east of South Capitol.
There are a few numbers to pass along--so far in 2008 (from the start of the program on March 26 through the end of October) the Ward 6 pilot zone grossed a bit over $235,000 in parking fees, with it splitting pretty evenly between the 80 game days ($118k, averaging $1,650 per day) and the other non-game days ($115k, averaging $1,300 per day). However, it cost the city more than $860,000 to install the meters and signage, so the program isn't exactly operating in the black yet.
The current red visitors passes are scheduled to expire on Dec. 31--however, DDOT's Damon Harvey acknowledged that the realities of trying to send them out in late December (in the midst of the holiday mail deluge) and the issue of on-street parking enforcement for the inauguration means that it's likely DPW will be told to not consider the old passes expired until Feb. 1 or some other date.
There was really only one attendee who was vociferously against the pilot's restrictions; others who got up to spoke had concerns about portions of it, but given how these meetings can sometimes go, it seemed that most people were accepting of the program. DDOT's Harvey made sure to emphasize a number of times that this program is not just about ballpark parking--it's to get ahead of all of the expected development and commerce coming to Capitol Hill, Near Southeast, and Southwest, and protect resident and business parking before it gets out of hand.
There were no specific changes announced for 2009--however, it sounded like if there were changes they'd be put in place closer to Opening Day. Although most of the people who spoke at the meeting mentioned that they didn't really see any influx of ballpark-related on-street parking on the Hill or areas further away in Southwest, it would be wise to keep in mind two things for 2009: the possibility that the free Nats Express won't be running (no decision yet), and, on the flip side, the opening of two new office buildings within two blocks of the ballpark that will have three levels of underground parking that could become available (100 M and 55 M, and perhaps also the underground parking now being built in the hole just north of the ballpark, though there's been no announcements of whether any of these will be offering gameday parking). The potential lack of free parking could drive more fans to try to find on-street parking, but perhaps the growth of close-in garage spaces will mitigate that.
Tune in again in February when I'm sure the traffic and parking discussions will heat up for the new season! (Yippee.)
UPDATE: Don't miss my addendum, where I clear up that just because the meters haven't been paid for yet doesn't mean that the neighborhood won't already be seeing some of the revenue.
Comments (0)
   
 
 More About Nationals Park
 All posts: parking, Nationals Park

JDLand.com Home

Comments

No comments posted.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

Jscott280 on Roundup of Some: Looks like the Hilton brothers are partnering with solace brewing for the retail...
JD on Roundup of Some: And these tidbits from Martin Austermuhle on Twitter: Yikes: Per data from D....
JD on Roundup of Some: This is why I remain extremely reticent to speak much of expected openings. h...
tmich93 on Roundup of Some: Just tried La Famosa yesterday and it was terrific. Their menu has terrific valu...
tmich93 on Roundup of Some: Sorry to hear that JD! Best wishes to your father during his recovery.
jdc on Roundup of Some: We miss JD, but family comes first. Best wishes on a speedy recovery for your da...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O 1ST ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 09/16/20
100 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/16/20
200 B/O L ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/13/20
1000 B/O 3RD PLACE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/13/20
UNIT B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/12/20
UNIT B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/10/20
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/07/20
UNIT B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/04/20
1100 B/O 8TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/30/20
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/27/20
UNIT B/O K ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/23/20

Recent Issued Building Permits Archive  
1300 4TH ST SE 130   
09/08/20 
ASANA PARTNERS / KEE HAN KIM; W. SAKIE - BHAR; NA
SG2000328 / CONSTRUCTION
Install one set of building sign and one set of double side blade sign
1331 4TH ST SE CU   
08/28/20 
FC 1331 LLC / null
P2008455 / SUPPLEMENTAL
   
08/31/20 
FC 1331 LLC / null
E2010801 / SUPPLEMENTAL
   
09/01/20 
FC 1331 LLC / null
P2008520 / SUPPLEMENTAL
150 I ST SE   
09/10/20 
SQUARE 737 LLC / SHON THOMAS
AH2001871 / CONSTRUCTION
Placing mobile crane on 2nd Street SE for hoisting materials to 150 I Street SE and closing sidewalk for pedestrian safety
300 M ST SE   
09/11/20 
FEDERAL CENTER LP / HOSSEIN HAMED; WILLIAM G ROSENBERG; NA
SG2000379 / CONSTRUCTION
INSTALL TWO BUILDING MOUNTED LED-ILLUMINATED SIGNS W / FACE LIT CHANNEL LETTERS ON BACKER.
861 NEW JERSEY AVE SE   
08/26/20 
GREYSTAR GP LLC / CHARLES C. BAKER; CHARLES C. BAKER
M2003573 / SUPPLEMENTAL
   
08/26/20 
GREYSTAR GP LLC / CHARLES C. BAKER; CHARLES C. BAKER
P2008383 / SUPPLEMENTAL
   
08/26/20 
GREYSTAR GP LLC / CHARLES C. BAKER; CHARLES C. BAKER
P2008384 / SUPPLEMENTAL
   
09/08/20 
0861 NEW JERSEY AVE / null
M2003711 / SUPPLEMENTAL
1200 NEW JERSEY AVE SE 20590   
08/26/20 
UNITED STATES OF AMERICA / null
M2003570 / SUPPLEMENTAL
1299 NEW JERSEY AVE SE   
09/08/20 
BROOKFIELD PROPERTIES / TIM GOOD
BP2004497 / POST CARD
1013 O ST SE 20374   
08/25/20 
UNITED STATES OF AMERICA / JOHN P RUTTER; JOHN P RUTTER; KYLE ERICKSON
BCIV2000052 / CONSTRUCTION
This project is for the interior renovation of the historic buildings 46 and 67 in the Washington Navy Yard. New utilities will be installed to serve the building. NO NEW BUILDING WILL BE CONSTRUCTED AS PART OF THIS PROJECT. A parking lot south of the building will be used to provide stormwater management, as there is no ample open space within the buildings for stormwater BMPs.
   
09/14/20 
UNITED STATES OF AMERICA / JOHN BROWNING
SB2000494 / CONSTRUCTION
Install three temporary 1" groundwater monitoring wells down to 4' bsg in the basement of buildings 46 and 67 in the Washington Navy Yard for groundwater sampling. Wells will be removed less than 1 week following installation, and the voids will be filled with grout.
71 POTOMAC AVE SE   
09/03/20 
MRP REALTY / JUSTIN BELLOW
TL2000041 / CONSTRUCTION
1st time tenant fit out in new building
   
09/04/20 
RIVERFRONT HOLDINGS II, LLC / JUSTIN BELLOW
B2007457 / CONSTRUCTION
Revision to B1804337 to revise the location of IZ units.
520 TINGEY ST SE   
08/31/20 
U. S. GENERAL SERVICES ADMINISTRATION / JOHN WICKLIFFE
TN2000086 / CONSTRUCTION
Install 100ft x 90ft Tent No Cooking, No Propane, No Stages, No Smoking Installed on Aug 4, 2020 - Jan 29, 2021 Events Daily 8:00 am - 10:00 pm
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.