With Opening Day 2008 inching closer, the cobbling together of parking at the new ballpark is apparently turning out to be a greater challenge than constructing an on-time on-budget stadium. So this week the city put in another zoning amendment request to allow more temporary surface parking lots, this time covering eight squares in Southwest, all between P, T, 2nd, and South Capitol streets. (See my Stadium Parking page for a map with the new lots highlighted.) You can read the Office of Planning's report on the new case (07-08A) for more detail.
On Monday night the Zoning Commission approved this request on an emergency basis, meaning that the zoning change takes effect immediately, lasting 120 days while a hearing is scheduled and a permanent amendment is voted on.
As with the original amendment approved earlier this year, the lots can last no more than five years, are required to be available for public parking during non-game times, and must have District Department of Transportation approval of their traffic routing plans to ensure that access to the lots is not directed along I, P, or Fourth streets, SW. There's also a new requirement being added with this latest request, that a minimum of five percent of the spaces in these lots be reserved for a car/ride-share program.
These new lots are still subject to the cap of 3,775 total spaces laid out in the first amendment, unless special exceptions are obtained after the cap is reached from the Board of Zoning Adjustment on a per-lot basis. As with the squares covered earlier this year, it's not expected that lots will suddenly sprout on every one of the locations covered in the request; the main goal appears to be additional flexibility in finding possible spots for the needed spaces.
A separate zoning action a few months ago approved three temporary surface lots totaling under 800 spaces at The Yards, across the street from the stadium. There are also apparently negotiations underway about using the lots at RFK and providing shuttle service to the new ballpark.
There are other locations within a few blocks of the ballpark that will no doubt become temporary parking lots as well--one example is the Lerners' recent permit applications to build a lot on land they own at 1000 South Capitol Street.
At Monday's ANC 6D meeting, when this new zoning amendment was discussed, commissioners mentioned rumors of additional lots perhaps coming to the recently closed KFC and Exxon locations on the west side of South Capitol. But these blocks are not in the Capitol Gateway Zoning Overlay, and so don't require the special approval needed for the squares in the previous amendment requests. And these additional locations still require the Nationals to contract with the landowners, which might not always be an easy negotiation.
The ANC commissioners did not bring up many concerns about this new request, other than asking for confirmation that the traffic controls in the initial amendment cover these new lots, which Judi Greenberg of the Office of the Deputy Mayor for Planning and Economic Development assured was the case.
Commissioner Ron McBee said that he hopes to organize a town hall meeting for Southwest residents about all the parking plans when they are more concrete, and vice chair Andy Litsky reminded Greenberg that the DC Sports and Entertainment Commission is supposed to be meeting with community leaders to address ballpark-related concerns, but that there hasn't been a meeting in six months.
The zoning commission's approval of the emergency action came with little discussion, perhaps reflecting that most of the potential issues with these temporary lots were hashed out in the first request.
Time should solve many of the initial parking issues around the ballpark; right now there are seven office and residential projects already under construction around Near Southeast that by 2008 and 2009 will have multiple levels of underground parking that could potentially be available for gametime, just as with the lots are in the buildings around the Verizon Center. Most of the squares in these recent zoning requests, along most every other block between South Capitol and Second, will also eventually be home to buildings with underground parking.
UPDATE: An e-mail sent out today to Nationals season ticket holders says that 2008 ticket package information will be sent out "in the next month or so", and that a "comprehensive transportation package will also be sent to all season ticket holders shortly after you have received your seat location information." Presumably the "transportation package" means parking plans for season ticket holders (and maybe a really good Metro map!).
Comments (0)
   
 
 More About Nationals Park

JDLand.com Home

Comments

Sorry, comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

Jscott280 on Albi Opening This: Fences up around parcel H. They are going to change the ingress points to N plac...
jdc on Albi Opening This: At 37 L, windows are going in and tower crane is gone. At Chiller site next door...
dcgent on Albi Opening This: UrbanTurf looks at what's coming housing wise for the area https://dc.urbanturf....
Shogungts on Albi Opening This: @Jason - not sure if that is the plan, but it would be nice. I went by there th...
Jason on Albi Opening This: Any news on Half Street between M and N? I've heard that it's being turned into ...
202_cyclist on Retail Roundup: When parking is further reduced, people can take metro to one of the two station...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
900 B/O 11TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 02/19/20
900 B/O M ST SE   BURGLARY
Burglary Two
 02/19/20
1200 B/O HALF ST SE   ROBBERY  02/18/20
UNIT B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/15/20
400 B/O M ST SE   ASSAULT WITH A DANGEROUS WEAPON  02/08/20
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/02/20
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/01/20
600 B/O VIRGINIA AVE SE   ASSAULT WITH A DANGEROUS WEAPON  01/29/20
1300 B/O 4TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/27/20
1100 B/O 8TH ST SE   BURGLARY
Burglary Two
 01/25/20
303 VIRGINIA AVE SE   ROBBERY  01/25/20
400 B/O M ST SE   THEFT
Shoplifting
 01/23/20

Recent Issued Building Permits Archive  
909 4TH ST SE   
02/12/20 
MEREDITH FASCETT / null
E2004655 / SUPPLEMENTAL
1300 4TH ST SE APT 214   
02/03/20 
null / NA NA NA
EHOP20983190 / HOME OCCUPATION
1021 5TH ST SE   
02/13/20 
KEVIN WILLIAMS / KEVIN WILLIAMS; KEVIN WILLIAMS
B2005053 / CONSTRUCTION
Apply for building permit to have final closing inspection for permit #B1602481 & B1602513 per inspector inspection report since these permits has expired.
82 I ST SE   
01/27/20 
GDV EYE STREET LLC / null
P2003302 / SUPPLEMENTAL
   
01/27/20 
GDV EYE STREET LLC / null
M2001261 / SUPPLEMENTAL
150 I ST SE   
02/14/20 
SQUARE 737 LLC / JASON D DORRIS
AH2000818 / CONSTRUCTION
Construction of a new 13 story apartment building with three below grade parking levels, 1st floor retail, and amenity areas; 375 units and 181 parking spaces. To include mechanical, electrical, plumbing, elevators and structural work.
250 M ST SE   
02/14/20 
SQUARE 769 LLC / null
P2003901 / SUPPLEMENTAL
800 NEW JERSEY AVE SE   
01/30/20 
NEW JERSEY AT H LLC / MICHELLE GABBITAS
AH2000649 / CONSTRUCTION
Manhole rehabilitation on New Jersey, 2nd St and M St SE to repair 3 existing sewer manholes in DDOT ROW. Work will all be done through existing manholes (trenchless) and include lining, rebuilding and bypass of existing manholes.
861 NEW JERSEY AVE SE   
01/28/20 
DISTRICT OF COLUMBIA / JANE MCCRAY
AH2000647 / CONSTRUCTION
Pepco contractor, W.A.Chester, will be splicing cable on 02 / 01 / 2020 - 02 / 28 / 2020, from 9 PM - 7 AM.
1275 NEW JERSEY AVE SE 20003   
02/14/20 
BROOKFIELD PROPOERTIES / TIM GOOD
AH2000849 / CONSTRUCTION
After hours to conduct work on 1275 New Jersey Ave SE on the upcoming holiday, Presidents Day, February 17, 2020. Operations would include below grade concrete and waterproofing activities with access limited to N Street. This permit would not include extended work hours beyond the normal 7am to 7pm period.
1275 NEW JERSEY AVE SE   
01/29/20 
US GOVERNMENT / null
E2004153 / SUPPLEMENTAL
   
01/29/20 
MILLER AND LONG / WILLIAM MOORE
AH2000659 / CONSTRUCTION
Afterhours to pour concrete with pump truck from 11pm to 7am from 2 / 6 / 2020 to 3 / 6 / 2020
   
01/30/20 
UNITED STATES OF AMERICA / VINCENT J. BROWNING; VINCENT J. BROWNING
P2003449 / SUPPLEMENTAL
1-Oil / Sand interceptor
   
01/30/20 
US GOVERNMENT / null
E2004202 / SUPPLEMENTAL
   
02/07/20 
MILLER AND LONG / WILLIAM MOORE
AH2000699 / CONSTRUCTION
Afterhours to put up towercrane with mobile crane saturday 2 / 8 / 2020 and 2 / 9 / 2020 from 5am to 1159pm
1299 NEW JERSEY AVE SE   
02/18/20 
FOREST CITY SEFC LLC / STRAUCHON; SEE BELOW
BCIV1800153 / CONSTRUCTION
Phase 1A BCIV Permit Description - BCIV 1800153 - The subject BCIV permit is for the Phase IA development of Quander St SE, N Pl SE, and 1-1 / 2 St SE within the overall Forest City, Yards West (FCYW) development area which emphasizes: pedestrian-focused public realm, optimized utility corridor, fully integrated SWM design, and complete street and vision zero design. The FCYW Phase IA is comprised...
1322 PATTERSON AVE SE   
02/13/20 
JOINT BASE ANACOSTIA BOLLING - UNITED STATES NAVAL OBSERVATORY SI / TONYA HARRIS; TONYA HARRIS; TBD
BCIV2000046 / CONSTRUCTION
***FEDERAL PROPERTY*** PROJECT WILL CONSIST OF DREDGING THE EXISTING RETENTION POND AND INSPECTING AND CLEANING THE OUTLET CONTROL STRUCTURE (S1) LOCATED ON THE UNITED STATES NAVAL OBSERVATORY TO REMOVE SEDIMENT ACCUMULATION. CONTRACTOR SHALL AVOID THE CLEARING OF VEGETATION ON POND EMBANKMENTS AND SURROUNDING AREAS SO AS TO KEEP RESTORATION AND REPLANTING TO A MINIMUM.
71 POTOMAC AVE SE   
02/13/20 
MRP REALTY / JAMES VANEGAS
AH2000681 / CONSTRUCTION
Perform interior and exterior construction activities. New construction 14-story new residential multi-family building.
   
02/19/20 
RIVERFRONT HOLDINGS II, LLC / JUSTIN BISHOP; JUSTIN BISHOP
SP1900054 / CONSTRUCTION
Construct a 680 sqft concrete swimming pool inside an existing waterproofed structural box on the 14th floor. All MEP, decking and fencing work by other trades under separate permits.
227 TINGEY ST SE   
02/12/20 
GONE YARD HOTEL OWNER LLC / BOB BIROONAK; BOB BIROONAK
SG2000048 / CONSTRUCTION
one double face illuminated blade sign
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.