Since January, 2003
            
 Page Through from Before to After

This afternoon, the National Capital Planning Commission gave their "does not adversely effect federal interests" approval to the recent zoning amendment allowing temporary surface parking lots on various blocks near the stadium, subject to the removal of the Canal Park parcels from the amendment and also that any of the temporary lots on waterfront parcels be set back a minimum of 75 feet from the Anacostia shoreline. They also want the final order of the text amendment to make clear that the five-year cap on these lots cannot be extended via a Board of Zoning Adjustment Special Exception.
The staff report indicated what we've heard in the last day or so, that the Office of Planning will indeed be modifying the amendment to take out Reservation 17 parcels B, C, and D (the Canal Park blocks) before the Zoning Commission's final vote on July 30. There was also slightly curt exchange between two of the commissioners during the discussion of the parking situation about why the US Department of Transporation headquarters can't make some accommodation to allow public parking (as the Reagan building does) in some of its 800 parking spaces; as is now so often the case in this city, "Sept. 11" was the answer.
The commission also approved the 35% design plans for The Yards--many of the renderings and drawings that were in the presentation to the board today are already on my Yards First Phase page. This submittal to the NCPC covered the streetscape, landscape, and infrastructure improvement plans, and the plans for the first four developments on the site--renovation of two existing buildings to create 430 residential units, the renovation of Building 167 into a 46,000-sq-ft retail space, and the construction of two new buildings at 4th and M that would have 320,000 sq ft of office space, a grocery store, and 170+ apartments. Work on the streetscape and infrastructure improvements will be starting this summer, and the first of the building renovations will get underway next year, with 170 apartments and the Building 167 retail to be delivered in mid-2009. This plan will also be in front of the Commission on Fine Arts on July 19.
I hope to get electronic versions soon of the staff recommendation documents for both of these votes, which contain lots of good summary information for people who haven't been following these cases quite as, um, closely as SOME people. I'll update here when I get them.
So, for Canal Park fans, everything seems to be pointing to the hoped-for conclusion, though it won't be 100% written in stone until the July 30 Zoning Commission meeting.
UPDATE: Here's the recommendation document for The Yards; I hope to have the parking one on Friday, so check back.
UPDATE II: Believe it or not, NBC 4 covered the meeting today. (Maybe they got the idea from today's District Extra!)
Comments (0)
   
 
 More About parking

JDLand.com Home

Comments

Sorry, comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

dcgent on Roundup of Some: Very cool historical look at the neighborhood https://storymaps.arcgis.com/stori...
Jscott280 on Roundup of Some: Looks like the Hilton brothers are partnering with solace brewing for the retail...
JD on Roundup of Some: And these tidbits from Martin Austermuhle on Twitter: Yikes: Per data from D....
JD on Roundup of Some: This is why I remain extremely reticent to speak much of expected openings. h...
tmich93 on Roundup of Some: Just tried La Famosa yesterday and it was terrific. Their menu has terrific valu...
tmich93 on Roundup of Some: Sorry to hear that JD! Best wishes to your father during his recovery.
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O HALF ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/22/20
600 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/21/20
1200 B/O VAN ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/19/20
1000 B/O 1ST ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 09/16/20
100 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/16/20
200 B/O L ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/13/20
1000 B/O 3RD PLACE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/13/20
UNIT B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/12/20
UNIT B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/10/20
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/07/20
UNIT B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/04/20
1100 B/O 8TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/30/20
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/27/20

Recent Issued Building Permits Archive  
1300 4TH ST SE 130   
09/08/20 
ASANA PARTNERS / KEE HAN KIM; W. SAKIE - BHAR; NA
SG2000328 / CONSTRUCTION
Install one set of building sign and one set of double side blade sign
1331 4TH ST SE CU   
08/28/20 
FC 1331 LLC / null
P2008455 / SUPPLEMENTAL
   
08/31/20 
FC 1331 LLC / null
E2010801 / SUPPLEMENTAL
   
09/01/20 
FC 1331 LLC / null
P2008520 / SUPPLEMENTAL
150 I ST SE   
09/10/20 
SQUARE 737 LLC / SHON THOMAS
AH2001871 / CONSTRUCTION
Placing mobile crane on 2nd Street SE for hoisting materials to 150 I Street SE and closing sidewalk for pedestrian safety
300 M ST SE   
09/11/20 
FEDERAL CENTER LP / HOSSEIN HAMED; WILLIAM G ROSENBERG; NA
SG2000379 / CONSTRUCTION
INSTALL TWO BUILDING MOUNTED LED-ILLUMINATED SIGNS W / FACE LIT CHANNEL LETTERS ON BACKER.
861 NEW JERSEY AVE SE   
09/08/20 
0861 NEW JERSEY AVE / null
M2003711 / SUPPLEMENTAL
1299 NEW JERSEY AVE SE   
09/08/20 
BROOKFIELD PROPERTIES / TIM GOOD
BP2004497 / POST CARD
1013 O ST SE 20374   
09/14/20 
UNITED STATES OF AMERICA / JOHN BROWNING
SB2000494 / CONSTRUCTION
Install three temporary 1" groundwater monitoring wells down to 4' bsg in the basement of buildings 46 and 67 in the Washington Navy Yard for groundwater sampling. Wells will be removed less than 1 week following installation, and the voids will be filled with grout.
71 POTOMAC AVE SE   
09/03/20 
MRP REALTY / JUSTIN BELLOW
TL2000041 / CONSTRUCTION
1st time tenant fit out in new building
   
09/04/20 
RIVERFRONT HOLDINGS II, LLC / JUSTIN BELLOW
B2007457 / CONSTRUCTION
Revision to B1804337 to revise the location of IZ units.
520 TINGEY ST SE   
08/31/20 
U. S. GENERAL SERVICES ADMINISTRATION / JOHN WICKLIFFE
TN2000086 / CONSTRUCTION
Install 100ft x 90ft Tent No Cooking, No Propane, No Stages, No Smoking Installed on Aug 4, 2020 - Jan 29, 2021 Events Daily 8:00 am - 10:00 pm
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.