peek >>
Near Southeast DC Past News Items: Sep 25, 2005
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

I've been away for more than a week, so I apologize if my news items have been slow--I'm still catching up on some things, hope to get back up to speed soon. In the meantime, I'll pass along that the DC Zoning Commission approved the Capper Seniors #2 building, approved for setdown the Capper/Carrollsburg 2nd stage PUD (which I believe means that basically they've agreed that they should have a hearing at a later date), and deferred the final vote on the stadium text amendment to the Capitol Gateway overlay, presumably until their October meeting. I'd be able to give you more details on all this, but I mistakenly believed the DCOZ web site when it said that Zoning Commission meetings are streamed live, and, well, this one most assuredly wasn't. Waaah!

 

The Anacostia Waterfront Corporation has posted the draft summary of its Ballpark District Urban Development Strategy (PDF). This is an important document that should be read by anyone interested in the development plans around the stadium. It defines the Ballpark District as 60 acres surrounding the baseball stadium site, including the two blocks north of the stadium site, the western portion of the Southeast Federal Center, a few acres of the WASA site, the Florida Rock site, and additional land at the foot of South Capitol Street (currently owned by Douglas Jemal). The document describes its vision for a "vibrant mixed-use waterfront district":

· Shops, and restaurants and entertainment venues along Half Street, First Street and the Anacostia River;
· An engaging pedestrian environment with strong linkages to and along the waterfront;
· Major public gathering spaces along Half Street, at the ballpark, and at the foot of First Street at the river;
· A grand promenade along the Anacostia River and Potomac Avenue;
· Upper-level offices, hotel rooms and housing that create a diverse population of residents, workers and visitors; and
· A state-of-the-art ballpark that contributes to the life and identity of the neighborhood.

In all, the AWC envisions 465,000-785,000 sq ft of retail and restaurant uses, 350,000-1.6 million sq ft of office space; 1,900,000 to 3,600,000 sq ft (1570 to 2980 units) of housing; and 7,000 to 8,000 parking spaces. (We also find out that the traffic circle being planned as the terminus for the new South Capitol Street Bridge will be called "Potomac Circle.")  Vision documents are wonderful things, I look forward to living long enough to see what the reality actually ends up being :-).

 




                  © Copyright 2020 JD.