peek >>
Near Southeast DC Past News Items: Jun 10, 2008
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

As I was walking on Third Street toward the ballpark last night, I squinted east down L Street and thought I spied construction equipment on the south side of the street east of Fourth, which is where work is supposed to be getting underway on Capitol Quarter's first townhouses. This spurred me to finally give some long-needed TLC to my Capitol Quarter page: I've now split out onto separate pages the before-and-during photos of the Phase I blocks (between Fourth and Fifth and L and Virginia), the Phase 2 blocks, and some additional photos of the sales center and its street-layout model.
If you're somewhat of a newcomer to Near Southeast, or if you've forgotten what Capper/Carrollsburg used to look like, these pages have a lot of images from 2003 and 2004 that you might find of interest, showing the months when the eastern end of the Cappers was slowly boarded up and then demolished.
If the Phase I page isn't enough for you, I've also created a Capitol Quarter Phase I Expanded Photo Archive, showing every view in the archive of the blocks that make up Phase I. I took a lot of photos last week of the Phase I blocks, so look for the icon, and also remember to click the Click to see all available photos of this location. icon to see all photos between the oldest and the newest ones (especially if you like demolition photos). I'll now be taking photos every few weeks of the Phase I blocks where construction is underway. (This area is substantially larger than the 21-acre tract where I almost killed myself trying to keep track of the ballpark's construction, but hopefully it will be a bit easier to handle.)
Comments (0)
More posts: Capper, Capitol Quarter
 

From Tommy Wells: "All Are Invited to the 2nd Annual Ward 6 Family Picnic & Softball Tournament hosted by Councilmember Tommy Wells, Saturday, June 21, 2008, 11 am - 5 pm at the Rosedale Recreation Center, 1700 Gales Street, NE. Free Food and Fun for All Ages!!!" It starts at 11 am with a cleanup of the Rosedale Rec Center, followed at noon by the "Celebrity Softball Tournament," with swimming, soccer, basketball, tennis, music, and more between noon and five. Read Tommy's site for more, including how to sign up for the softball tournament. I've also added it to my spiffy new Google Calendar, so if you use Google Calendar you can easily view all Near Southeast calendar items along with your own appointments.
Comments (0)
More posts:
 




                  © Copyright 2021 JD.