Since January, 2003
            
 Sliding from Before to After

Having gotten out of the way the vertical construction going on behind neighborhood fences, we can now move on to the "clearing" portion of this fence survey.
The roof of Nats Parking Garage C gives a great view of Yards Parcel A, and how far the site clearing has come along since the final days of Spooky Building 213.
Next up will be the creation of a park on the far end of the site, a parking lot in the corner closest to this intersection, and the new home for Trapeze School New York at far right. (Here's a map if that's too many words.)

Meanwhile, along New Jersey Avenue....
(Left) This isn't my best work, but you can compare the rubble in this photo to the lush grass-covered hill that used to run along New Jersey Avenue between L and M. All this dirt is being moved to build the 324-unit Gallery at Capitol Riverfront residential building, aka 1111 New Jersey Avenue.
(Right) Up in Whole Foods land at 800 New Jersey Avenue, the hole is still being dug. But the new block of H Street between New Jersey and 2nd is looking like a real street, though no doubt it will continue to taunt us by remaining closed throughout the construction of 800 NJ, like its sibling I Street a block to the south has sat unopened, waiting for the Park Chelsea construction to finish.

Next, do you like construction trailers? How about construction trailers on sites where work isn't yet underway?
(Left) Here's the Capper Community Center site at 5th and K, where a ceremonial groundbreaking a few weeks back was not quite enough to jolt the project into action.
(Right) Looking down upon the vast Florida Rock footprint from the ballpark, and noting the new construction trailer visible at the far end. As I mentioned a few days ago, there's not as yet been an announcement of construction financing for the planned first-phase 350-unit apartment building, nor are the initial necessary building permits approved.
Comments (2)
   
 
 More Recent News

JDLand.com Home

Comments

conngs0 says: (9/30/14 9:35 AM)
Any idea if the Parcel A site be ready in time to allow the Trapeze School to transition immediately from its current site when their permission to use that space expires at the end of the year? Perhaps I've just gotten jaded by the slow progress of almost every other project in the development, but 90 days seems a little quick to pull this together despite the fact that a parking lot, park and makeshift tent are all quite simple to construct. Regardless, I'm excited to see how this all turns out.


JD says: (9/30/14 9:38 AM)
I don't know for sure--but yeah, it shouldn't take that long to create at least the parking lot and the base for the trapeze site. (Park might take a little longer.)

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

JD on Retail Roundup: Yes, right the first time! [image]
Jscott280 on Retail Roundup: Sorry Parcel i lol
Jscott280 on Retail Roundup: Spoke with a parking lot attendant at Parcel I after I saw all monthly parking w...
AUshutterbug on Anchovy Social Opens: @Sasq thanks! We are anxious too. The "flood" happened 3 days before t...
Sasq on Anchovy Social Opens: @Aushutterbug I went to Maialiano Mare last Friday. When I told a server that I'...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
UNIT B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/15/20
400 B/O M ST SE   ASSAULT WITH A DANGEROUS WEAPON  02/08/20
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/02/20
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/01/20
600 B/O VIRGINIA AVE SE   ASSAULT WITH A DANGEROUS WEAPON  01/29/20
1300 B/O 4TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/27/20
1100 B/O 8TH ST SE   BURGLARY
Burglary Two
 01/25/20
303 VIRGINIA AVE SE   ROBBERY  01/25/20
400 B/O M ST SE   THEFT
Shoplifting
 01/23/20
1255 1ST ST SE   THEFT
Theft 2nd Degree (theft From Building)
 01/19/20

Recent Issued Building Permits Archive  
909 4TH ST SE   
02/12/20 
MEREDITH FASCETT / null
E2004655 / SUPPLEMENTAL
1300 4TH ST SE APT 214   
02/03/20 
null / NA NA NA
EHOP20983190 / HOME OCCUPATION
900 5TH ST SE   
01/24/20 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / WILLIAM B. CRIST; WILLIAM B. CRIST
E2003968 / SUPPLEMENTAL
1021 5TH ST SE   
02/13/20 
KEVIN WILLIAMS / KEVIN WILLIAMS; KEVIN WILLIAMS
B2005053 / CONSTRUCTION
Apply for building permit to have final closing inspection for permit #B1602481 & B1602513 per inspector inspection report since these permits has expired.
82 I ST SE   
01/27/20 
GDV EYE STREET LLC / null
P2003302 / SUPPLEMENTAL
   
01/27/20 
GDV EYE STREET LLC / null
M2001261 / SUPPLEMENTAL
100 I ST SE APT T-13   
01/25/20 
null / NA NA NA
EHOP20960826 / HOME OCCUPATION
150 I ST SE   
02/14/20 
SQUARE 737 LLC / JASON D DORRIS
AH2000818 / CONSTRUCTION
Construction of a new 13 story apartment building with three below grade parking levels, 1st floor retail, and amenity areas; 375 units and 181 parking spaces. To include mechanical, electrical, plumbing, elevators and structural work.
250 M ST SE   
02/14/20 
SQUARE 769 LLC / null
P2003901 / SUPPLEMENTAL
800 NEW JERSEY AVE SE   
01/30/20 
NEW JERSEY AT H LLC / MICHELLE GABBITAS
AH2000649 / CONSTRUCTION
Manhole rehabilitation on New Jersey, 2nd St and M St SE to repair 3 existing sewer manholes in DDOT ROW. Work will all be done through existing manholes (trenchless) and include lining, rebuilding and bypass of existing manholes.
861 NEW JERSEY AVE SE   
01/28/20 
DISTRICT OF COLUMBIA / JANE MCCRAY
AH2000647 / CONSTRUCTION
Pepco contractor, W.A.Chester, will be splicing cable on 02 / 01 / 2020 - 02 / 28 / 2020, from 9 PM - 7 AM.
1275 NEW JERSEY AVE SE 20003   
02/14/20 
BROOKFIELD PROPOERTIES / TIM GOOD
AH2000849 / CONSTRUCTION
After hours to conduct work on 1275 New Jersey Ave SE on the upcoming holiday, Presidents Day, February 17, 2020. Operations would include below grade concrete and waterproofing activities with access limited to N Street. This permit would not include extended work hours beyond the normal 7am to 7pm period.
1275 NEW JERSEY AVE SE   
01/29/20 
US GOVERNMENT / null
E2004153 / SUPPLEMENTAL
   
01/29/20 
MILLER AND LONG / WILLIAM MOORE
AH2000659 / CONSTRUCTION
Afterhours to pour concrete with pump truck from 11pm to 7am from 2 / 6 / 2020 to 3 / 6 / 2020
   
01/30/20 
UNITED STATES OF AMERICA / VINCENT J. BROWNING; VINCENT J. BROWNING
P2003449 / SUPPLEMENTAL
1-Oil / Sand interceptor
   
01/30/20 
US GOVERNMENT / null
E2004202 / SUPPLEMENTAL
   
02/07/20 
MILLER AND LONG / WILLIAM MOORE
AH2000699 / CONSTRUCTION
Afterhours to put up towercrane with mobile crane saturday 2 / 8 / 2020 and 2 / 9 / 2020 from 5am to 1159pm
1322 PATTERSON AVE SE   
02/13/20 
JOINT BASE ANACOSTIA BOLLING - UNITED STATES NAVAL OBSERVATORY SI / TONYA HARRIS; TONYA HARRIS; TBD
BCIV2000046 / CONSTRUCTION
***FEDERAL PROPERTY*** PROJECT WILL CONSIST OF DREDGING THE EXISTING RETENTION POND AND INSPECTING AND CLEANING THE OUTLET CONTROL STRUCTURE (S1) LOCATED ON THE UNITED STATES NAVAL OBSERVATORY TO REMOVE SEDIMENT ACCUMULATION. CONTRACTOR SHALL AVOID THE CLEARING OF VEGETATION ON POND EMBANKMENTS AND SURROUNDING AREAS SO AS TO KEEP RESTORATION AND REPLANTING TO A MINIMUM.
71 POTOMAC AVE SE   
02/13/20 
MRP REALTY / JAMES VANEGAS
AH2000681 / CONSTRUCTION
Perform interior and exterior construction activities. New construction 14-story new residential multi-family building.
79 POTOMAC AVE SE   
01/23/20 
RIVERFRONT HOLDINGS I LLC / ; W&M NA
B2003750 / CONSTRUCTION
320 SQ Ft metal canopy extension to exterior canopy. Existing canopy is standalone structure covering an outdoor bar area.
227 TINGEY ST SE   
01/23/20 
FFC 227 / ANDY MCKELVEY; ANDY MCKELVEY
SP1900050 / CONSTRUCTION
Install in-ground, gunite swimming pool on 11th floor of new construction. Scope includes gunite pool shell, finishes, and closed pool circulation system. All fresh water plumbing, sewer, electrical and mechanical work / connections by others. this permit is for a new commercial swimming pool
   
02/12/20 
GONE YARD HOTEL OWNER LLC / BOB BIROONAK; BOB BIROONAK
SG2000048 / CONSTRUCTION
one double face illuminated blade sign
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.