Since January, 2003
            
 Page Through from Before to After

It's a real milestone in the redevelopment of Near Southeast to report that the entire stock of townhouses for sale at Capitol Quarter has now sold out.
The first reservations for units were taken in October 2006 (remember the people camping out?), construction began in summer 2008, Phase 1 finished construction and Phase 2 reservations began in 2010, and now, with construction underway on the last group of houses on L between 3rd and 4th, the finish line for the project is not far away.
The development has been the third phase of the Hope VI redevelopment of the old Capper/Carrollsburg public housing project, replacing the old housing with nearly seven blocks of brightly painted rowhouses, containing not only 130ish market-rate townhouses (a few of which have broken the $1 million barrier) but also 90ish special workforce-rate houses for smaller incomes, in addition to nearly 90 subsidized rental units.
Those units, combined with the 300 built at Capper Seniors #1 and 400 M Street, mean that more than half of the 700 units in the old Capper have now been replaced. The rest are slated to come in five mixed-income apartment buildings, located on the west side of 3rd Street, on L Street south of the Marine Bachelor Enlisted Quarters, and on the DPW/trash transfer station site at New Jersey and K. No timelines have been announced for any of the remaining buildings, but you can see on my main Capper page a map with estimated unit counts for each.
I've taken a lot (a LOT) of photos of the Capper footprint since 2003: my Capitol Quarter Phase 2 and Phase 1 pages give a good overview, or you can just pick a spot along 3rd, 4th, or 5th Streets in my Photo Archive and take a look.
Comments (5)
   
 
 More About Capper

JDLand.com Home

Comments

Maelstrom says: (3/29/12 1:26 PM)
I like how they deepened the blue in the sky when they re-developed Capper/Carrolsburg. Just look between the Nov 17th 2004 and Jul 31st 2011 pictures at 3rd and I (in article) - those sky-painters have been hard at work restoring the rich-ness of color up there.


kribbles says: (3/29/12 1:44 PM)
I've been in the new homes and I admit that they look nice. Not that there's much down there to do right now.


F says: (3/29/12 3:36 PM)
With "No timelines...announced for any of the remaining buildings," it will porbably look like this for many years to come.



Bruce says: (3/29/12 3:43 PM)
I was an overnight camper back in 2006. That group spend the night sitting around in chairs and got to know each other.
We truly were pioneers as we sat around in chairs as the last Capper homes were still standing down the block toward 3rd and L.
Fun to watch the area take shape over the last six years (although it took nearly 3 to close!)...
Made some good friends from that outing!
It is weird to see homes going up where the trailor used to be..


PJY03 says: (3/30/12 11:44 AM)
@Kribbles
really? not much to do down there? You're a ten minute walk to Eastern Market/Barracks Row, a 10-15 minute walk to the Nats, and a 5-10 minute walk to Yards Park (which will be full of retail within the next 18 months). Canal Park will be coming within the year and is 5 minutes away.

I lived in Cleveland Park, considered one of the standard "convenient" neighborhoods of NW. There's nothing I did up there that you can't do living in these townhouses. I'd actually argue that with the ballpark so close, and a walkable farmer's market, there's considerably more "to do" in Capitol Quarter. If you're talking about shopping and retail? Well, if what fills in over the next two years is according to schedule and plans, these townhomes will be 1.2 mill when there actually "is something to do".


Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

CJBabyDaddy on Slider-Palooza 2019: @Walt: Start here — https://www.bluedrop.co/services/facility-rental/
willinrm on Taking a Look/Tingey: interestingly enough Chief Marcelle from BlueJacket will be leaving bluejacket t...
walt on Slider-Palooza 2019: Great info on DC Water -- thanks everyone. I'm going to see if I can get an es...
CJBabyDaddy on Slider-Palooza 2019: The lobby, roof, and 4th floor meeting space are available for rental.
conngs0 on Slider-Palooza 2019: I totally agree that the first floor of the DC Water HQ looks fantastic. I hope...
conngs0 on Catching Up on: Brett M, I echo your disappointment on the structure of the new Capper Senior Ce...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O 3RD ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/01/19
1000 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 11/01/19
UNIT B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/01/19
400 B/O M ST SE   THEFT
Shoplifting
 10/30/19
200 B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/28/19
100 B/O H ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/28/19
900 B/O NEW JERSEY AVE SE   ROBBERY  10/28/19
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/27/19
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/24/19
100 B/O H ST SE   ROBBERY  10/23/19
1400 B/O SOUTH CAPITOL ST   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/22/19
100 B/O K ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/21/19
70 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/21/19
300 B/O M ST SE   THEFT
Theft First Degree (theft From Building)
 10/20/19

Recent Issued Building Permits Archive  
1331 2ND ST SE   
11/08/19 
DC WATER / CRAIG M COOK
B1907684 / CONSTRUCTION
Flood mitigation, seal openings, install brackets for stop logs, replace elevator shaft with concrete slab.
1346 4TH ST SE   
10/23/19 
FC 1346 HOLDCO I LLC / GARY BRENT; NA NNA; NA
SG2000046 / CONSTRUCTION
Install 1 illuminated wall sign & 2 non-illuminated wall sign - ALBI
300 M ST SE SPACE B   
11/06/19 
FEDERAL CENTER LP / null
M2000403 / SUPPLEMENTAL
100 M ST SE SUITE 200 20003   
10/25/19 
MONUMENT REALTY LLC / null
E2001081 / SUPPLEMENTAL
100 M ST SE STE# 200   
10/25/19 
SQUARE 743 INC / MIGUEL A. MOROTE; MIGUEL A. MOROTE
E2001078 / SUPPLEMENTAL
300 M ST SE   
11/06/19 
FEDERAL CENTER LP / RUBEN MOVSISYAN; RUBEN MOVSISYAN
E2001472 / SUPPLEMENTAL
   
11/11/19 
FEDERAL CENTER LP / null
P2001215 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
11/05/19 
809-853 NEW JERSEY AVENUE ACQUISITION, LLC / JAVIER A GRACIA; NA NA
SB2000011 / CONSTRUCTION
Drilling and installation of 3 inclinometers which will be extended to a depth of 25 below existing site grade as well as the installation of 4 settlement optical monitoring points which will be extended to depths ranging between 5 feet to 30 feet below existing site grades.
1100 NEW JERSEY AVE SE 1ST   
11/04/19 
SQUARE 742 LLC / JAMES W. LASHER; JAMES W. LASHER
E2001381 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE 410 20003   
10/24/19 
WILLIAM SNOODT / null
P2000729 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE 420   
10/22/19 
SQUARE 742 LLC / JAMES W. LASHER; JAMES W. LASHER
E2000949 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE 4TH FL   
10/22/19 
SQUARE 742 LLC / JAMES W. LASHER; JAMES W. LASHER
E2000951 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
10/22/19 
SQUARE 742 LLC / ;
P2000628 / SUPPLEMENTAL
   
10/23/19 
SQUARE 742 LLC / TRACIE TRACIE; TRACIE TRACIE; KALI A. SHELTON
SG2000051 / CONSTRUCTION
One wall mounted sign illuminated.
   
11/01/19 
SQUARE 742 LLC / ;
P2000952 / SUPPLEMENTAL
   
11/05/19 
SQUARE 742 LLC / BETSY H MARINO; RICHARD PEPPER; BETSY H MARINO
SG2000062 / CONSTRUCTION
Remove Alion sign and replace with illuminated wall sign reading SERCO
71 POTOMAC AVE SE   
11/08/19 
RIVERFRONT HOLDINGS II, LLC / JAMES VANEGAS
AH2000075 / CONSTRUCTION
Perform interior and exterior construction activities. New construction 14-story new residential multi-family building.
520 TINGEY ST SE   
10/30/19 
UNITED STATES OF AMERICA / JOHN WICKLIFFE; TBD
TN2000020 / CONSTRUCTION
Install 100ft x 90ft Tent No Cooking, No Propane, No Stages, No Smoking Installed Feb 9, 2020 - Aug 4, 2020 Events Daily 8:00 am - 10:00 pm
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.