Since January, 2003
            
 Sliding from Before to After

The task force put together by Tommy Wells to propose new boundaries for all of Ward 6's Advisory Neighborhood Commissions and their Single Member Districts will be coming to ANC 6D on Thursday night (July 28), for a "listening meeting" at 6:30 pm in the DCRA Hearing Room (E200) at 1100 4th St. SW.
Now posted on their blog is a series of questions that task force chair Joe Engler is asking to "account for the 'sense' of where residents associate their daily living." Among the questions:
* "Do the residents living around the baseball stadium believe their community "core" is located in: (a) Barracks Row, (b) Waterfront Mall, (c) both, and/or (d) neither?" (There is also a poll widget on the site where you can vote on this question.)
* "Is the freeway the proper east-west dividing line? For example, is there an opportunity to create SMD that use the Third, Fourth, Sixth and Eighth streets tunnels to "connect" the residents on both sides of the freeway?"
* "Should large residential buildings or complexes be dispersed among multiple SMDs?"
* "While needing to build SMDs with a population of 2,000 residents - are there any creative ways to account for the hidden census? Either those people that are now living in ANC 6D (around the baseball stadium for example) that were not there at the time of the census. Or those empty buildings or pending constructions that will drive a significant increase in density over the next few years?"
The last question is an interesting one, given that the census numbers come from April 1, 2010, and certainly another couple hundred residents have moved in since then. And with phase 2 of the Capitol Quarter townhouses moving along, the Yards' Foundry Lofts building about to start leasing, and likely construction of new residential buildings at 401 M, 880 New Jersey, Florida Rock, and along Half Street within the next five years, any SMDs drawn in Near Southeast based on 2010 numbers are going to balloon well past the target population size of between 1,900 and 2,100 residents. At the kick-off task force meeting a few weeks back, attendees were told that the 2,000-plus-or-minus-five-percent is not a legislated requirement, but is a goal, and that the task force can choose to have non-conforming SMD sizes if they feel it is necessary. But it was also clear that some of the task force members consider non-conforming SMDs a no-no, especially if they're used to take into account populations not reflected in the census numbers
As for the "core community" question, a new map suggested by ANC 6A02 commissioner Drew Ronneberg (but not endorsed by the task force) shows all of Near Southeast in a new ANC 6B, pairing the neighborhood with Barracks Row as its "core." Southwest would then be on its own in 6D, west of South Capitol Street.
You can use my interactive Ward 6 map to play with the numbers, especially if you want to see how keeping all of Near Southeast in 6D is a pretty tough nut to crack if the 1,900-2,100 population targets are inviolate. But then the question becomes whether the neighborhood gets split between 6D and 6B, or moved completely to 6B.
Somewhere far down the road, of course, Near Southeast when built out could be its own ANC, but in the meantime the realities of the numbers mean that it has to be grouped with either a large number of Southwest SMDs or a large number of southern Capitol Hill SMDs. Which one do you think makes more sense?
The meeting will run for 90 minutes, with time alloted for public input by ANC chairs/commissioners, community and neighborhood organizations, business and merchant associations, residents, and business owners; there will be a sign-in sheet for those wishing to speak. Written statements and comments will also be accepted at the meeting, or by e-mail for up to three days after the meeting (ward6rd@gmail.com).
The task force is scheduled to propose its first draft of new boundaries at a public meeting on Aug. 8, then forwarding the official draft to the ANCs on Aug. 18. The final draft would then go to Tommy Wells on Sept. 26.
Or, if you don't want anything to do with an ANC "listening meeting" Thursday evening, you can go on Tommy Wells's South Capitol Street Bike Ride, scheduled for exactly the same time as the redistricting session. Representatives from DDOT, the Washington Area Bicyclist Association, and Black Women Bike will be joining community members from Ward 6 and Ward 8 to discuss issues that affect pedestrians and cyclists on both sides of the river, focusing on improvements that can be had in the design of the future Douglass Bridge, which already calls for far wider sidewalks than the current bridge.
Either way, you'll probably still be able to make the showing of West Side Story at Tingey Plaza at 8:45 pm. Stay cool, boy!
Comments (0)
   
 
 More About ANC News

JDLand.com Home

Comments

No comments posted.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

sharksfansd on Meet the New: Kilwins opened up yesterday across from Nats Park. Didn't wind up going in, but ...
dcgent on Meet the New: I don't have a WBJ subscription but fyi Felice Development buys big Southeast de...
rpb on Meet the New: Taxi garage at New Jersey & L is being demolished today. Guessing the old Ea...
JD on Meet the New: Emmy Squared Pizza opening Friday at 5 pm at its space at 4th and Tingey, sez @t...
Andres4Mayor on Meet the New: Varnish Lane nail salon coming to the former GNC space.
Andres4Mayor on Meet the New: AT&T store now open in the former Capital One Bank space. Just a Verizon sto...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
No records added or modified in the past two weeks.

Recent Issued Building Permits Archive  
1300 4TH ST SE 1001   
02/22/21 
AP BOWER RETAIL LLC / null
E2104231 / SUPPLEMENTAL
1346 4TH ST SE APT 1M   
02/06/21 
null / NA NA NA
EHOP21945129 / HOME OCCUPATION
1331 4TH ST SE R-2   
02/08/21 
FC 1331 LLC / FC 1331 LLC
BP2101814 / POST CARD
10 I ST SE   
02/16/21 
CAPITOL HILL RACQUET CLUB / NA; VICTORIA STEINHOFF
SB2100112 / CONSTRUCTION
Installation of up to six (6) 3-inch diameter direct-push Geoprobe borings to depths of up to 30 feet below grade as part of an environmental assessment.
555 L ST SE   
01/29/21 
UNITED STATES OF AMERICA / RENNE WELL; RICK HARLAN SCHNEIDER
B2102004 / CONSTRUCTION
DGS PROJECT REHABILITATION+RESTORATION OF THE HISTORIC LINCOIN FIELDHOUSE
861 NEW JERSEY AVE SE 20003   
02/23/21 
809-853 NEW JERSEY AVE ACQUISITION LLC / SUSANA VAZQUEZ
AH2100728 / CONSTRUCTION
Dismantling of tower crane.
809 NEW JERSEY AVE SE   
02/11/21 
GREYSTAR GP LLC 809-853 NEW JERSEY AVENUE ACQUISITION LLC / null
E2103926 / SUPPLEMENTAL
853 NEW JERSEY AVE SE   
02/11/21 
GREYSTAR GP LLC / null
E2103924 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
02/05/21 
GS CSX HOTEL OWNER LLC / null
E2103762 / SUPPLEMENTAL
1275 NEW JERSEY AVE SE   
02/02/21 
FC 1275 NJ LLC / null
E2103662 / SUPPLEMENTAL
   
02/11/21 
FC 1275 NJ LLC / null
P2103445 / SUPPLEMENTAL
848 SOUTH CAPITOL ST SE   
02/16/21 
CXS TRANSPORTATION INC / VICTORIA STEINHOFF; TBD
SB2100111 / CONSTRUCTION
Installation of up to six (6) 3-inch diameter direct-push Geoprobe borings to depths of up to 30 feet below grade as part of an environmental assessment.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2021 JD.