Since January, 2003
            
 Sliding from Before to After

Saturday was a lovely day for taking a couple of walks with camera in hand, and with work underway at locations that couldn't be any closer to my out-of-neighborhood house, I had no excuse to not get some updated photos of 225 Virginia/200 I, Capitol Quarter Phase 2, Canal Park, and the Little Red Building. (It was also nice chatting with the folks who correctly guessed that the oddball standing in the middle of the street taking photos must have been me.)
The showy demolition work is now well underway at 225 Virginia/200 I, and if the few shots and renderings on the project page aren't enough for you, you can do a virtual walk around the block to see which walls and windows are blown out at this point and to compare the current images with their "befores."
No time is being wasted at Capitol Quarter, where framing has now wrapped around from I to 3rd to K Street on the first block of Phase 2. You can take a "walk" around that block, too, if you haven't lately, or wander through the project page, both of which have plenty of images of the old Capper public housing buildings that were on this block for a very long time. I also added to the database some photos of what will eventually be the intersection of 3rd Place and L, once the new street gets built through its second block south of K. If you're big on old Capper photos, there's a few "before" images of L Street buildings in that sent that haven't been displayed on the site before now.
If photographs of fences are your thing, take a "walk" around the Canal Park perimeter, to see many pictures of the "traffic control" now in place in advance of the start of construction on the park (presuming it ever actually comes). Those barriers are going to put a crimp in some of my standard shooting locations for the next year or so, including where I've stood for the past eight years to take photographs of the Little Red Building, which in its new incarnation is now more of a brick red than the beet red it used to be. ANC commissioner Garber posted on Friday that the roof is going in over the next few days, at which point work on the interior can begin, as it slowly progresses toward becoming "Lot 38 Espresso."
Remember that the Click to see all available photos of this location.icon on any page gets you to the full batch of photos I've taken at any location (which, since I'm getting into the eighth year of doing this, can be kind of voluminous in some spots).
(I know that It seems kind of odd to still be posting photos when so many readers now live in the neighborhood, which of course wasn't always the case. But it's my schtick, and so I continue onward! Plus. there are plenty of people interested in Near Southeast who don't wander around every day--or maybe some of the residents don't know what these spots used to look like before....)
Comments (6)
   
 
 More About 225 Virginia/Old Post Plant/200 I

JDLand.com Home

Comments

Gary Karr says: (3/20/11 11:59 AM)
Or readers who are thinking about moving into the neighborhood...:-)


G says: (3/21/11 4:36 PM)
Must have been fun taking out those windows / walls on old Washington Star plant!


southwillriseagain says: (3/22/11 1:15 PM)
I am thinking that Canal Park might have its Federal funding taken away.

It has been 4 years since Eleanor Norton and surrounding developers got federal funding for Canal Park. They had a design..."ready to go." They had to redesign it to bring it to their budget 3 years ago. I am disappointed there is still no site activity although groundbreaking was 6 months ago. I want to see Canal Park built but I fear that with Republicans looking for every dollar to cut out of the budget, Federal funding will be lost (if it has not been lost already)...Can't we get moving with this project? What in the world can be holding it up for so long?

Could you give a history of Canal Park on your website?
(Thank God for the Yards Park!!!!)


JD says: (3/22/11 1:25 PM)
First off, I'm pretty sure there's no federal funding for Canal Park, or if there is, it's a very small portion of the total. There's city funding, money from the USDOT payment-in-lieu-of-taxes (PILOT) fund, some bond monies for infrastructure work, and some private funds.

I don't think they would have put up the barricades to close streets if they weren't very close to starting construction.

Could I give a history of Canal Park? link link

Start reading. :) You can start at the end and work forward if you want, to help correct your timeline a bit.




Ben in SE says: (3/22/11 1:47 PM)
And I am pretty sure they were tearing up the M Street block yesterday, so construction has already started.


MJM says: (4/5/11 10:17 PM)
Did Canal Park lose their funding again? Doesn't appear to have been any progress over the last week or so. They tore up some of the black-top and the little bob-cats have since disappeared unless they are on the same schedule as the LRB II.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

RMP on Super Tuesday Tidbits: The Willow space is cleared out :(
MarkinDC on Super Tuesday Tidbits: This article has some great info for helping out our neighborhood restaurants an...
CJBabyDaddy on Super Tuesday Tidbits: @RMP: I’m stacking up gift cards so I can celebrate by binging at a couple of m...
AGH on Super Tuesday Tidbits: Just got notice that the new retail on N street will be: Kilwins (Chocolate, Fud...
Jscott280 on Super Tuesday Tidbits: Kilwins(ice cream), chicken + whiskey and taphouse 99 coming to N street.
RMP on Super Tuesday Tidbits: Does anyone else feel like they are spending more money on restaurants right now...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/23/20
1500 B/O SOUTH CAPITOL ST SE   THEFT
Shoplifting
 03/11/20
200 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/09/20
1000 B/O 1ST ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 03/08/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 03/06/20
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 03/05/20
1200 B/O 1ST ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/01/20
1100 B/O 1ST ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/27/20

Recent Issued Building Permits Archive  
1300 4TH ST SE 1001   
03/16/20 
LA FAMOSA LLC / null
P2004796 / SUPPLEMENTAL
   
03/20/20 
LA FAMOSA LLC / null
E2005975 / SUPPLEMENTAL
1300 4TH ST SE 1006   
03/16/20 
LA FAMOSA LLC / null
M2001859 / SUPPLEMENTAL
1300 4TH ST SE RU-1   
03/04/20 
AP BOWER RETAIL LLC / DAVID T FONTANA; BACON CONSTRUCTION COMPANY BACON CONSTRUCTION COM
TL2000065 / CONSTRUCTION
First time tenant layout on 1,196 SF of 1st floor retail shell for restaurant, Jeni Ice Cream, with 10 seats
   
03/06/20 
AP BOWER RETAIL LLC / null
E2005415 / SUPPLEMENTAL
   
03/11/20 
AP BOWER RETAIL LLC / DOMINIC E TOTARO; DOMINIC E TOTARO
M2001793 / SUPPLEMENTAL
1300 4TH ST SE   
03/13/20 
LA FAMOSA LLC / KIMOY LALLEMENT; POTOMAC CONSTRUCTION SERVICES
TL2000028 / CONSTRUCTION
New tenant layout for commercial kitchen, two restrooms, point of sale bar, and dining seating, new lighting and mechanical zones. 2,338 sf INDOOR OCCUPANCY: 84 PERSONS WITH 59 SEATS OUTDOOR OCCUPANCY: 38 PERSONS WITH 38 SEATS TOTAL MAX OCCUPANCY: 122
900 5TH ST SE   
03/03/20 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / CHRISTOPHER LAKATOSH; CHRISTOPHER LAKATOSH
E2005256 / SUPPLEMENTAL
   
03/24/20 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KAYLA TRICE; DELAWARE
EN2001608 / SHOP DRAWING
Install 3 new hydraulic passenger elevators
2 I ST SE   
03/09/20 
CRESCENT CAPITOL VIEW MF LLC / BOB BIROONAK; BOB BIROONAK; BOB BIROONAK
SG2000223 / CONSTRUCTION
one non illuminated sign
200 I ST SE   
03/17/20 
DISTRICT OF COLUMBIA / LEIA TERRELL
B2006382 / CONSTRUCTION
Tenant Alterations of existing office doors and wall. Including relocation of existing electrical, and mechanical terminals. NO CHANGE OF EGRESS, USE OF OCCUPANCY, NO EXTERIOR LAND DISTURBANCE, NO BASE BUILDING STRUCTURAL WORK.
139 N ST SE   
03/16/20 
PARCEL I FC ROWAN / MIGUEL RIOS; GRIFFIN DEWATERING, LLC
SB2000152 / CONSTRUCTION
Type of proposed System: Deep well dewatering system consisting of 16 wells around the perimeter of the shored excavation and 2 wells within the excavation in a mutually agreed layout. • Installation Method: Wells will be drilled up to 70’ deep, utilizing Griffin’s hollow stem auger drilling rig to drill up to a 10.25” I.D. borehole. Deep wells come complete with screen, casing, riser pipe and a s...
861 NEW JERSEY AVE SE   
03/03/20 
809-853 NEW JERSEY AVENUE ACQUISITION LLC / ERICKA CLARK
AH2000987 / CONSTRUCTION
Tower crane erection must be performed in 1 day due to weather constraints. All work performed onsite. Noise reduction procedure in place.
1275 NEW JERSEY AVE SE   
03/06/20 
MILLER AND LONG / WILLIAM MOORE
AH2001001 / CONSTRUCTION
After hours to pour concrete with pump truck saturday 3 / 7 and sunday 3 / 8 from 9PM-4AM.
1299 NEW JERSEY AVE SE   
03/13/20 
FOREST CITY SEFC LLC / SARAH J. NAPIER
BCIV2000067 / CONSTRUCTION
Revisions to BCIV1800153. This submission is for approval stamps only. No change in work.
71 POTOMAC AVE SE   
03/27/20 
MRP RESIDENTIAL / KAYLA SHATTUCK; KAYLA SHATTUCK; PARADIGM CONTRACTORS LLC
BCIV2000036 / CONSTRUCTION
This permit is for site civil work at 71 Potomac Avenue SE including stormwater management and erosion & sediment control. See plans for more details.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.