Since January, 2003
            
 Page Through from Before to After

It's assessment season again, and the Examiner reports that, citywide, commercial property assessments are down 10 percent, with residential numbers dropping between three and four percent. So I fired up the database I keep of the numbers for Near Southeast, added the new data as I do each year when the new numbers come out, and came up with a total assessed value for all properties of just under $5.9 billion, which is a 1.8 percent drop from the $6.01 billion tally reported in March of 2009.
But, wait! As I dug a little further, I found a flaw in my methodology that hadn't quite occurred to me before this year (though it probably hadn't been an issue too often before now): 11 of the big commercial buildings in Near Southeast had apparently appealed their initial 2010 assessments (sent out last year), lowering their tax bills by between 2 percent and 38 percent, from a combined $1.13 billion in the initial assessments to $909.36 million post-appeals. (Ten other buildings are showing no change in those assessments, and one--909 New Jersey--actually saw an 8 percent bump upwards, which was probably more of a function of the initial estimate being from before the building was completed.)
Taking these changes into account, the total assessments for 2010 for the neighborhood is closer to $5.88 billion, meaning that tally of the 2011 numbers just released of $5.89 billion would actually be a 1.9 percent increase. Except that I imagine that some property owners will be appealing again (since some of the 2011 numbers go right back to the original 2010 numbers that were appealed), and the $5.99 billion number will come down again.
Not all property in the neighborhood took a hit--with the opening of the first portions of Capitol Quarter, the blocks between Fourth and Fifth Street saw an increased value of $33 million, and the completion of Velocity raised the assessed value of its block from $99 million to $162 million.
And, since everyone will want to know: the behemoth of the area--Nationals Park--has an assessment unchanged from last year, at just a hair under $1 billion.
I'll check the numbers again later this year to see how many proposed 2011 assessments get altered.
Here's a quick table of the big properties that saw their 2010 assessments change from the original number released early in 2009:
Property Original 2010 Revised 2010 % Diff. Proposed 2011
300 M $132.26M $82.00M -38% $74.69M
55 M $162.60M $110.66M -32% $110.66M
80 M $124.08M $92.75M -25% $111.27M
100 M $90.98M $68.18M -25% $90.98M
1201 M (Martime #1) $87.97M $72.57M -18% $64.74M
1100 NJ $142.79M $121.40M -15% $139.16M
100 I $85.20M $73.00M -14% $85.20M
70 I $132.28M $119.00M -10% $132.28M
1000 NJ * $84.46M $81.06M -4% $79.75M
770 M (Blue Castle) $23.93M $23.17M -3% $23.93M
1220 12th (Maritime #2) $66.99M $65.57M -2% $47.57M
909 NJ $68.05M $73.58M 8% $79.93M
* This is for the residential portion of Capitol Hill Tower; the 2010 assessments on the Courtyard by Marriott show no change.
Comments (1)
   
 
 More About Capper

JDLand.com Home

Comments

G St says: (3/3/10 9:27 AM)
Yes, the mixed feelings on property taxes.

My house went up in value! Oh, wait - more taxes.

It went down! Lower taxes! Oh, wait - I may be stuck with it...


Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

Jscott280 on Checking in From: @SWneighbor - how does one post a picture on this thread. I have pics of Half St...
SWneighbor on Checking in From: Could someone please post a few photos of half street as it is now? I am stuck ...
jdc on Inching from Quarantining: My fingers are crossed for the neighborhood, which I have not seen since mid-Mar...
JD on Checking in From: I have not heard anything about Half Street going full pedestrian all the time. ...
VelocityChris on Checking in From: @sasq excellent, I hope it's true, surprised it hasn't been announced, even if i...
Sasq on Checking in From: @velocitychris I saw one of the foreman and asked. He confirmed that it would be...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O HALF ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/24/20
1200 B/O VAN ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/23/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/20/20
1100 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/19/20
1100 B/O 1ST ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/19/20
1200 B/O HALF ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/17/20
100 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/15/20
1200 B/O 4TH ST SE   ASSAULT WITH A DANGEROUS WEAPON  05/12/20
300 B/O WATER ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/07/20
100 B/O H ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/03/20
100 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/03/20
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/28/20
400 B/O M ST SE   THEFT
Theft First Degree (theft From Building)
 04/24/20

Recent Issued Building Permits Archive  
1300 4TH ST SE RU-1   
05/14/20 
AP BOWER RETAIL LLC / null
P2006042 / SUPPLEMENTAL
1300 4TH ST SE   
05/08/20 
null / ;
P2005886 / SUPPLEMENTAL
   
05/15/20 
null / ;
P2006066 / SUPPLEMENTAL
929 5TH ST SE   
05/18/20 
CHRISTOPHER D FRENCH / CHRIS FRENCH; HERCULES FENCE OF MARYLAND, LLC HERCULES FENCE OF
F2000461 / CONSTRUCTION
1. Removal and replacement of front metal fence and gate in kind.  2. Removal and partial relocation of existing 6' tall wood fence in rear patio. The fence is currently approx. 30" inside the rear property line, and we intend to move the fence to our rear property line. The work includes removal of existing wood gate that opens from neighbor's property to our property along shared property line ...
300 M ST SE 4TH FL   
05/05/20 
FEDERAL CENTER LP / ;
P2005798 / SUPPLEMENTAL
250 M ST SE   
04/29/20 
SQUARE 769 LLC / TAMIKA STATON; OTIS
EN2001825 / SHOP DRAWING
Install 3 New Elevators - 3500Lbs @ 350FPM - Elevators 1 - 2 and 4
   
04/29/20 
SQUARE 769 LLC / TAMIKA STATON; OTIS
EN2001826 / SHOP DRAWING
Install 1 New Elevator - 4000Lb @ 350FPM - Elevator 3
   
04/29/20 
SQUARE 769 LLC / BRIAN C STROTT; NA
TL2000026 / CONSTRUCTION
9 story 173,125 GSF tenant improvement fit out.
   
04/29/20 
SQUARE 769 LLC / TAMIKA STATON; OTIS
EN2001827 / SHOP DRAWING
Install 2 New Elevators - 3500LB @ 200FPM - Elevators 5-6
300 M ST SE   
04/30/20 
FEDERAL CENTER LP / SAM HOLLEN; TBD
B2006591 / CONSTRUCTION
INTERIOR RENOVATION TO 5TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MEP AND LIFE SAFETY. NO STRUCTURAL. 4499 SQUARE FEET. NTT DATA.
   
05/01/20 
FEDERAL CENTER LP / null
E2007254 / SUPPLEMENTAL
   
05/14/20 
AMENTUM / null
E2007609 / SUPPLEMENTAL
111 N ST SE   
05/07/20 
BROOKFIELD PROPERTIES / MAHMOUD KHACHAN; NA
SB2000288 / CONSTRUCTION
Drill temporary eight soil borings to a depth of 80 each at the existing parking lot at 111 N Street SE, Washington DC. The diameter of the borings is 6 inches. The borings will be grouted upon completion in accordance with DCRA requirements as indicated in the work plan.
1111 NEW JERSEY AVE SE   
05/12/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
E2007563 / SUPPLEMENTAL
1275 NEW JERSEY AVE SE   
05/06/20 
UNITED STATES OF AMERICA / JUSTIN BELLOW; NA
B1913803 / CONSTRUCTION
PARCEL G PROJECT CONSISTS OF A NEW 12 STORY OFFICE BUILDING WITH STREET LEVEL RETAIL AND 2 LEVELS OF BELOW GRADE PARKING. 2 LEVEL PARKING APPROVED UNDER FOUNDATION TO GRADE FD1900047 & SHEETING AND SHORING SH1900050
   
05/19/20 
UNITED STATES OF AMERICA / null
M2002480 / SUPPLEMENTAL
   
05/19/20 
UNITED STATES OF AMERICA / null
P2006118 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.