Since January, 2003
            
 Page Through from Before to After

Who could envision a more exciting Friday night than watching the Tivo'ed coverage of today's DC Council Committee on Economic Development Public Hearing on the plans for the transition of the Anacostia Waterfront Corporation and the National Capital Revitalization Corporation into the office of the Deputy Mayor for Planning and Economic Development. (Maybe it's time for a new JDLand motto: We bore ourselves to tears so you don't have to.)
What is probably the biggest headline from the hearing for those with Near Southeast interests is that Deputy Mayor Neil Albert called "totally incorrect" the recent reports that construction would begin on Canal Park in August. Valerie Santos Young, now the Chief Operating Officer of the Deputy Mayor's office, said that negotiations are continuing with both the owner of the unused parking lot of the northernmost block of the park (Urban Parking Ventures) and with the group that owns the lease for the school bus parking on the other two blocks, but no agreements have been reached.
With that pleasant news out of the way, there really wasn't much else of note in the hearing that specifically impacts Near Southeast. There will be job cuts as the three organizations are merged into one, and employees should know their status in the new plan by Aug. 15; the number of positions being cut wasn't disclosed. They are planning to expand the DMPED office space in the Wilson Building, but will also be renewing the lease on the AWC offices at 1100 New Jersey Ave. for additional space. (They are working to break the lease for the old NCRC office space on M Street.) Accenture is being paid $320,000 for three months to help with the transition (which got some questioning from Kwame Brown as to why a local firm couldn't have been hired for the job). No documents on the reorganization were given to the committee before the hearing, which Brown wasn't too thrilled about, but Albert says that the new organization chart will be ready by August.
And, as much as I tried to close my ears to any non-Near Southeast discussions, I did hear that the city is not planning to sign the Memorandum of Understanding that the AWC had negotiated with the Southwest Waterfront redevelopment team, because the city's lawyers were concerned about possible exposure (which wasn't elaborated on). Albert said that they feel that an agreement can be reached that covers everything in the MOU without actually having an MOU.
There were also conversations about the management of the marinas, which baffled me until I realized everyone was saying "live-aboards" and not "liverboards."
You can catch a rebroadcast of the hearing on Saturday at 12:30 pm on either DC Cable 13 or via streaming video. If you subscribe to the Washington Business Journal, today's print edition had a short pre-hearing piece on the transition plans.
There will be additional oversight hearings in September and October, and Kwame Brown indicated that he plans to have additional hearings on every development project now in the DMPED portfolio, to make sure that the public is kept abreast of the plans and the timelines.
Comments (0)
   
 
 More About Canal Park

JDLand.com Home

Comments

Sorry, comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

Jscott280 on Super Tuesday Tidbits: Construction fences up at 1299 first st, has anyone heard what might go here?
202_cyclist on Super Tuesday Tidbits: JD— your brother is doing good work. https://mobile.twitter.com/jamiedupree /st...
RMP on Super Tuesday Tidbits: The Willow space is cleared out :(
MarkinDC on Super Tuesday Tidbits: This article has some great info for helping out our neighborhood restaurants an...
CJBabyDaddy on Super Tuesday Tidbits: @RMP: I’m stacking up gift cards so I can celebrate by binging at a couple of m...
AGH on Super Tuesday Tidbits: Just got notice that the new retail on N street will be: Kilwins (Chocolate, Fud...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/28/20
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/23/20
1500 B/O SOUTH CAPITOL ST SE   THEFT
Shoplifting
 03/11/20
200 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/09/20
1000 B/O 1ST ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 03/08/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 03/06/20
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 03/05/20

Recent Issued Building Permits Archive  
1300 4TH ST SE 1001   
03/16/20 
LA FAMOSA LLC / null
P2004796 / SUPPLEMENTAL
   
03/20/20 
LA FAMOSA LLC / null
E2005975 / SUPPLEMENTAL
1300 4TH ST SE 1006   
03/16/20 
LA FAMOSA LLC / null
M2001859 / SUPPLEMENTAL
1300 4TH ST SE RU-1   
03/11/20 
AP BOWER RETAIL LLC / DOMINIC E TOTARO; DOMINIC E TOTARO
M2001793 / SUPPLEMENTAL
1300 4TH ST SE   
03/13/20 
LA FAMOSA LLC / KIMOY LALLEMENT; POTOMAC CONSTRUCTION SERVICES
TL2000028 / CONSTRUCTION
New tenant layout for commercial kitchen, two restrooms, point of sale bar, and dining seating, new lighting and mechanical zones. 2,338 sf INDOOR OCCUPANCY: 84 PERSONS WITH 59 SEATS OUTDOOR OCCUPANCY: 38 PERSONS WITH 38 SEATS TOTAL MAX OCCUPANCY: 122
900 5TH ST SE   
03/24/20 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KAYLA TRICE; DELAWARE
EN2001608 / SHOP DRAWING
Install 3 new hydraulic passenger elevators
2 I ST SE   
03/09/20 
CRESCENT CAPITOL VIEW MF LLC / BOB BIROONAK; BOB BIROONAK; BOB BIROONAK
SG2000223 / CONSTRUCTION
one non illuminated sign
200 I ST SE   
03/17/20 
DISTRICT OF COLUMBIA / LEIA TERRELL
B2006382 / CONSTRUCTION
Tenant Alterations of existing office doors and wall. Including relocation of existing electrical, and mechanical terminals. NO CHANGE OF EGRESS, USE OF OCCUPANCY, NO EXTERIOR LAND DISTURBANCE, NO BASE BUILDING STRUCTURAL WORK.
   
04/01/20 
DISTRICT OF COLUMBIA / null
E2006294 / SUPPLEMENTAL
300 M ST SE   
04/02/20 
FEDERAL CENTER LP / CENTER; EDGE CONSTRUCTION
B2004640 / CONSTRUCTION
INTERIOR RENOVATION TO 4TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MECHANICAL, ELECTRICAL, LIFE SAFETY AND STRUCTURAL HANGING PARTITION. 3500 SQUARE FEET. AMENTUM
139 N ST SE   
03/16/20 
PARCEL I FC ROWAN / MIGUEL RIOS; GRIFFIN DEWATERING, LLC
SB2000152 / CONSTRUCTION
Type of proposed System: Deep well dewatering system consisting of 16 wells around the perimeter of the shored excavation and 2 wells within the excavation in a mutually agreed layout. • Installation Method: Wells will be drilled up to 70’ deep, utilizing Griffin’s hollow stem auger drilling rig to drill up to a 10.25” I.D. borehole. Deep wells come complete with screen, casing, riser pipe and a s...
1299 NEW JERSEY AVE SE   
03/13/20 
FOREST CITY SEFC LLC / SARAH J. NAPIER
BCIV2000067 / CONSTRUCTION
Revisions to BCIV1800153. This submission is for approval stamps only. No change in work.
71 POTOMAC AVE SE   
03/27/20 
MRP RESIDENTIAL / KAYLA SHATTUCK; KAYLA SHATTUCK; PARADIGM CONTRACTORS LLC
BCIV2000036 / CONSTRUCTION
This permit is for site civil work at 71 Potomac Avenue SE including stormwater management and erosion & sediment control. See plans for more details.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.